HUB Maple Ridge/Pitt Meadows letters to the City of Maple Ridge/Pitt Meadows
Jump to navigation
Jump to search
Maple Ridge
2009
2010
- 2010Jan08 email Highways and Traffic by-law re cycling on sidewalk
- 2010Feb24 Input Master Parks Plan
- 2010Apr18 submission re Greenhouse Gas Emissions reduction
- 2010May30 recommendations for River Road from Darby to Carshill
- 2010Oct04 Albion Flats development
2011
- 2011Feb26 email cycling on sidewalk / review Highways and Traffic bylaw
- 2011Sep18 email Cycling resolutions at UBCM
2013
- 2013Feb27 Recommendations Lougheed Highway Multi-Use Path
- 2013Mar22 Complete Streets and Biking to School
- 2013Jun Input Transportation Plan
2014
- 2014Jan02 email to Parks&Leisure Services Commission and MR BAC re 2013 Trails map
- 2014Mar30 email to MR Council re economic benefits of cycling
- 2014Jun8 recommendations cycling/ped for Dewdney and 248th St commercial node
- 2014Jun8 Thanks Lougheed MUP and request bike map
- 2014Jun8 Selkirk improvements between 225 and 226 St.
- 2014Oct26 Comments final Transportation Plan
- 2014Dec09 2013-041-RZ 123 Ave submission
- 2014Dec09 2013-019-RZ Brown Ave. submission
2015
- 2015Feb8 email River Road traffic calming
- 2015Feb16 email River Road traffic calming
- 2015Feb26 203 St. design
- 2015Feb03 HUB recommendations design 128 Ave./Abernathy widening
- 2015Feb23 email re 128 Ave./Abernathy widening
- 2015Mar12 concerns/recommendations 132 Ave. multi-use path
- 2015Mar19 Meeting with Mayor's Homelessness Task Force re cycling on sidewalk
- 2015May22 E-mail to Engineering re 240th Street improvements between 102 and 104 Ave
- 2015May22 E-mail to Engineering re Selkirk improvements
- 2015Jul20 E-mail to Council re planned multi-use trails west of Lower Hammond
- 2015Jul24 E-mail to Council re devt proposal neighbourhood commercial node at Dewdney and 248 St
- 2015Sep11 email to Engineering re 2nd Open House 203rd St improvements
- 2015Oct09 E-mail exchange w/ Planning & Engineering MMR re bike lanes Kanaka Way
- 2015Oct13 Email re HUB rep on new Ped & Cycling Advisory Committee
- 2015Oct25 Email re planned bi-directional bike lane on 232nd St at Silver Valley Rd
- 2015Nov01 Email re proposal improved signage and stop sign reversal on 117th/Selkirk route
- 2015Dec08 Email re cyclist safety Kanaka Way; development proposal at 238 St
2016
- 2016Feb04 email re cyclist safety Kanaka Way; development proposal at 238 St
- 2016Mar11 recommendations MUP 128th Ave 216th to 224th Street
- 2016Mar15 recommendations 123 Ave. Laity St. to 216th St.
- 2016Mar15 recommendations 123 Ave. 203rd St. to Laity St.
- 2016Apr10 email re highrise development on Brown Ave.
- 2016Jun12 email re Hammond Area Concept Plan
- 2016Sep05 email re Selkirk Ave. development proposal between 226th St.and 227th St.
- 2016Sep18 email re development proposal medical facility Lougheed Hwy 21700 block
- 2016Dec09 email re design 232nd St from 132nd Ave to Silver Valley Road
2017
- 2017Jan14 email committee input for MR Tourism Strategy Plan
- 2017Feb14 email devt proposal apartment complex on 122 Ave between 222 and 224 St
- 2017Apr14 email design 117th Ave between Burnett and 231 St
- 2017May21 email development along Dewdney Trunk Rd and Brown Ave west of 224th St 2017-061-RZ
- 2017Jun12 email Selkirk Ave between 226th and 227th Streets
- 2017Jun12 email letter of support development on both sides of Lougheed (Telosky Hill) east of Town Core - RETRACTED
- 2017Jun12 email letter of support Ridge Meadows Recycling Society's application for New Horizons for Seniors Grant for Repair Cafes
- 2017Jun27 email 207 Street improvements
- 2017Jul13 email 207 Street improvements
- 2017Aug21 email protected bike lanes 227 St between Abernathy Way and Dewdney Trunk Rd
- 2017Aug30 email protected bike lanes 123 Ave between 203rd St and Laity St
- 2017Oct20 email detailed design 232 St between 132 Ave and Silver Valley Road
- 2017Nov20 email re planned MUP at elementary school and community centre 104 Ave in Albion
2018
- 2018Jan19 email to Coun. Shymkiw re 132 Ave bike route
- 2018Jan20 email J Chow cycling on sidewalk downtown Maple Ridge
- 2018Mar17 email to ATAC request for endorsement Communities on the Move Declaration
- 2018Mar21 email Lougheed Highway Enhancement project 224 St to 226 St
- 2018May28 request for support recommendations for MVA reform
- 2018Aug21 Polygon Morningstar development 350+ homes at 232nd Street/Lougheed
- 2018Sep9 Request vote for UBCM Resolution B15: Active Transportation Strategy
- 2018Sept10 letter Polygon Morningstar development - post mortem
- 2018Sept27 email to Mgr Transp Purvez Irani re 117 Ave MUP between Laity St. and 207 St. / Polygon/Morningstar development along 232 St and Lougheed Hwy
- * Attachment: Comments Kay Teschke re bi-directional and multi-use paths
- 2018Oct09 letter from City MR response re Polygon Morningstar development at Lougheed 232nd Street
2019
- 2019Jan21 email welcome new Council
- 2019Mar4 email 2017-489-RZ dev info mtg; connecting pathway between Burnett and 228 Streets
- 2019Mar10 Accessibility of pedestrian and cycling pathways / Morningstar/Polygon development
- 2019Mar18 Email re bike facilities at 11641 227th St. south of Lougheed; 2017-461-RZ
- 2019July08 Letter Abernethy Way extension between 232 St and 256 St
- 2019July09 Letter North East Albion Concept Plan
- 2019Sep02 Letter SwissReal downtown development Dewdney, 224 St, Brown Ave
- 2019Sep09 Follow-up letter SwissReal downtown development Dewdney, 224 St, Brown Ave
- 2019Dec11 Letter 232 St improvements 116 Ave to Dewdney
2020
- 2020Jun18 email re 117 Ave improvement project Laity St. to 207 St.
- 2020Jun29 letter official HUB feedback re 117 Ave improvement project Laity St. to 207 St.
- 2020Jun29 email re accommodation of active transportation during construction/maintenance/events
- 2020Sep27 Town Center Area Plan
- 2020Sep27 Lougheed Transit Corridor Concept Plan
2021
- 2021Jan04 email re Dec. 3, 2020 meeting with Mark Halpin, MR Transportation Manager
- 2021Jan18 email North East Albion Plan
- 2021Jan23 CW January 26; presentation by MoTI on Hwy 7 widening 266 to 287 St.
- 2021Mar15 Greenhouse Gas emissions reduction targets update
- 2021Mar29 email 2021-061-RZ; 21783 Lougheed Highway; requesting advancement of connecting MUP on Lougheed between 220 and 216 St - update July 2023: no bike parking provided
- 2021May28 letter Transportation Plan update
- * Feb. 2021 gap list attached to May 28 letter Transportation Plan update
- 2021July 08 letter 2018-180-RZ; 22083 and 22057 Lougheed Highway - bike parking. Update 4Jul23: no bike parking provided
- 2021July14 email 2019-392-RZ; 22904, 22910, 22922 Dewdney Trunk Road - bike parking
- 2021July19 email 2021-281-RZ; 22936, 22944, 22952, 22964 and 22974 Dewdney Trunk Road - bike parking
- 2021Sep01 letter to Mayor and Council regarding incident at April 28 Transportation Advisory Committee meeting
- 2021Sep13 letter 2019-341-RZ, 12162, 12170, and 12178 Fletcher Street - proposed MUP; Public Hearing September 21
- 2021Oct25 email to Dir. of Parks Planning & Development - HUB LC assessment of Regional Greenway trails in Maple Ridge
- 2021Nov15 letter of support to TransLink for request for BICCS funding for MUP Hwy 7 between 220 St. and 216 St.
- 2021Dec6 Strategic Transportation Plan update Phase 3 feedback, with attachments:
- * 2021 12 HUB MR summary Cycling Gap Priority List
- * 2021 12 gap map Maple Ridge
- * 2021 12 SoC map Maple Ridge
- * 2021 12 suggested changes to preliminary cycling network map
- * 2021 10 Metro Vancouver Regional Greenways 2050 Maple Ridge - assessment by HUB LC
2022
- 2022Mar18 Email to Engineering Dept - 117 Ave MUP project
- 2022Apr04 Email to Engineering Dept - Abernethy/232 St. improvements
- 2022May23 email re industrial development at 11310 Kingston Street; 2018-458-RZ
- 2022June13 feedback Master Parks Recreation and Culture Plan
- 2022June19 2019-426-RZ NE Albion, devt proposal 24877, 24909, 24929, 2494 7, 24979, 24985, and 24989 112 Avenue; trail and driveway access
- 2022June19 email 2018-458-RZ; 11310 Kingston Street industrial development
- 2022June22 email North East Albion Concept Plan - public engagement
- 2022June24 2021-061-RZ 21783 Lougheed Hwy; connecting pathway to Howison Ave. Update 4/7/23: connecting pathway to be constructed
- 2022June30 email re 132 Ave/Fern Crescent improvements / concern about raised bike lanes into MUPs at ped crossings at 233 St and Balsam St
- 2022July07 email follow-up 117 Ave. multi-use path project
- 2022July26 email final feedback Transportation Plan cycling network, with attachment:
- * 2022 07 HUB MR summary Cycling Gap Priority List
- 2022Sep16 email OCP amendment North East Albion Area Plan; bike lanes on 248 St.
- 2022Dec08 letter 123 Avenue Road Safety Improvements (Laity St to 216 St)
- 2022Dec10 email 2022-339-RZ; 21668 and 21680 Dewdney Trunk Road - bike parking
- 2022Dec10 email 2021-104-RZ; 22337 St. Anne Avenue - bike parking
- 2022Dec10 email 2016-202-RZ, 20556 Dewdney Trunk Road - bike parking and Westridge Greenway connection
- 2022Dec27 letter final draft Maple Ridge Parks, Recreation and Culture Plan
2023
- 2023Jan08 email re change of name of trails map in OCP in 2006 from equestrian to multi-purpose
- 2023Jan29 1) 2018-132-RZ 12121 232 Street - connecting path; 2) Request to address accessibility for bikes through policy and guidelines
- 2023Feb02 email re Council mtg Jan 31 - 2016-202-RZ; 20556 Dewdney, 3rd reading; recommended long-term bike parking requirements for multi-family developments in City of Maple Ridge
- 2023Feb26 letter re Council mtg Feb 26 - 2023-016-RZ; industrial development 20000 Stewart Crescent; Need for protected cycling facilities on 113B Ave. and 203 St.
- 2023Mar27 letter re CoW and RC March 28: Award of Contract ITT-EN23-17: 203 St Watermain (Lougheed Highway to Thorne Avenue); opportunity to upgrade cycling facilities to protected as part of construction work?
- 2023Apr11 letter re need for cycling facilities south of Lougheed between 216 and 222 St
- 2023Apr20 letter 2022-439-RZ; subdivision at 11235 243B Street, re multi-use trail and protected bike lanes along 112 Ave.
- 2023Apr24 letter 2020-432-RZ - 12211 & 12229 228 St; improvements 121 Bikeway at 228 St; proposal for added routes to draft cycling plan
- 2023June13 letter HUB Cycling Recommendations for Multi-Use Paths
- 2023July10 North-East Albion Area Plan; Request to immediately halt all road- and boulevard construction at 112 Ave.
- 2023July16 2021-341-RZ 22108 22118 22126 22136 22146 22154 and 22164 Lougheed Highway - bike parking and cycling infra south side Lougheed Hwy; this e-mail was submitted for Public Hearing Sept. 12, 2023
- 2023July16 2023-125-RZ, 22527 Royal Crescent - bike parking
- 2023Sep19 Final feedback 2022 STP
Pitt Meadows
2010
2012
- 2012Jul27 HUB letter of support to DOT Cycling Infrastructure Partnerships Program re Kennedy Rd MUP
2014
2016
2018
- 2018May28 e-mail request for support Road Safety Act Reform City of Pitt Meadows
- 2018Sep09 e-mail request for support UBCM Resolution B15: Active Transportation Strategy
- 2018Oct17 e-mail Park Road Corridor Traffic Calming Safety Improvements
2019
2022
Map with suggested wayfinding improvements: https://www.google.com/maps/d/u/0/viewer?hl=en&ll=49.21520795662199%2C-122.69888491322703&z=14&mid=1ubyDbVztFWOhHs5otxGXpHC9OOH6oQLN To suggest additional improvements, please e-mail mapleridge-pittmeadows@bikehub.ca
- 2022Oct04 Letter re need for protected bike lanes along Harris Rd South
- 2022Nov03 Additional feedback Onni Development Harris Rd South and Airport Way
- 2022Nov28 email Park Road Traffic Calming Update; Council meeting Nov. 28, 2022
- 2022Nov30 email Onni development at Harris Road South; Need for safe cycling facilities
- * attachment: 2022 HUB Cycling Pitt Meadows summary Cycling Gap Priority List