2023-09-07 Agenda

From committees
Jump to navigation Jump to search

HUB North Shore Committee regular meetings are held on the first Thursday of every month at 6:30pm - 8:30pm. Everybody is welcome.

In-person at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

Or Online, using Google Meets: https://meet.google.com/myr-xmnd-iob

or by Phone: +1 587-977-8033‬ PIN: ‪290 663 905‬#



General

  • Agenda additions
  • Introductions


Goals & Objectives

  • Add Phase 2 top priority Bikeways - current Gaps Map
    • Liaisons to select a one or two for their municipality
  • Communications - any ideas??
  • Recruiting - Fill vacant positions
  • Ensure Cycling Priorities are in DWV's Transportation Strategy
  • ____
  • DW: Limiting Car Parking. What levers do we have? Discussion.


Events

  • Need a coordinator/organizer for events
  • Cargo Bike Race: Disaster Relief Trial (DRT)
    • Success! 9 participants. Was fun! Was informative.
    • Results/lessons presentation by Roland Shigas 07-Sep-2023
    • Volunteers = Duncan + Our Greenway (Sam Starr + Darnell) + Fiona + Jen


City of North Vancouver - Nadia/Sophia

CNV Key Contacts & Staff Meetings

  • Completed meetings
    • Met with Laura at Pooni Group to discuss Capilano Mall redevelopment, July 11th
    • Met with CNV Engineers to discuss priorities for St. Andrew's from HUB's perspective

Summary of current/upcoming CNV projects - this year & beyond

  • R2 improvements
    • construction has started at Kennard Ave for the transit and cycling improvements, so riders should be aware of loose materials and changing traffic control
  • Casano-Loutet Overpass/Midtown Connector
    • still waiting on permit
    • no update on the Midtown Connector
  • Upper Levels Greenway
    • discussions underway with MOTI to ensure they are on board with the proposed changes as 25th is currently the proposed route. This should allow for general mobility improvements around the Lonsdale/highway interchange area
  • 4th and Chesterfield
    • bike light and bump outs are currently being constructed
  • St. Andrew's
    • update here from the NSNews

ITC - Dana & Jonathan

  • May meeting update (held May 3): we received an overview of CNV's zoning bylaw policy (for information purposes only). CNV will be overhauling their zoning bylaws in the coming months, which could have direct and indirect impacts on cycling infrastructure (e.g., bike storage requirements for new builds, encouraging more community amenities to reduce travel distances, etc.). Public engagement on their zoning policy is expected to start in early June.


District of North Vancouver - Duncan/Stephen/Don

  • Meeting with Staff - Have proposed meetings in Sep for both Spirit Trail & Marine Drive @ Capilano Road.
    • Demetra just joined DNV's Transportation planning team.
    • Met with Heather McCauley on Lynn Valley Safeway redevelopment
  • 2023 Budget
    • How the extra $4.5M + $3M AT funding will be allocated
      • Mountain Highway Safety Study - public engagement in the fall
      • Construction funds were also released for:
        • Main Street (2024) - HUB NS top priority
        • Marine Drive (2024) - HUB NS top priority
        • portions of the Lynn Valley TC-Lynn CreekTC (eastern) route (2025) - HUB NS top priority
        • more to come soon.
  • Marine Drive - Bridge to Tatlow
    • Received a copy of the design, but we responded with several issues:
      • Scope has been reduced to just east of Capilano, leaving a dangerous gap to McGuire
      • Bikes share the bus+right turn lane just west of Capilano, even though there is space for the MUP to continue to Capilano.
      • The design does not include any wayfinding signage.
      • The slip-lane/channelized turn SE corner of Capilano could be removed to make crossing safer and provide much more space for the very tight bus stop.
    • Have asked for a follow up meeting.
  • Spirit Trail, East of Seymour planning:
    • Have asked for timeline and a copy of consultants report. (Again: SL, 30-Jul)
  • Main St - Harbour Ave - Barrows
    • Planning to tender in October, and Build in Spring/Summer 2024



District of West Vancouver - Paul/Peter/Mike

8 August meeting with DWV Transportation staff

  • I met online with director, Jenn Moller, Sean O'Sullivan and Andy Kwan.
  • Phase 1 construction continues on Westmount Road and planning for 31st and Marine intersection is to begin this fall.
  • Consultations with residents on 2500 Marine Drive re north-side bike lane to proceed this fall.
  • Abmleside Local Area Plan (LAP)
    • The Transportation Plan will focus on the village centre and will consider the results of the public engagement process to begin in September.
    • It is expected that the LAP will be adopted before the higher level mobility plan for the District.
    • Bellevue Ave will likely be a focus in the LAP Transportation Plan and the 30 km/hr speed limit will remain.
  • The final engineering drawings for the Hadden Drive to Westcott Road Multi-Use Path will be available in September.
  • Andy Kwan wants feedback on the new etiquette signage () on the Spirit Trail between Ambleside and Park Royal.
  • I raised again the possibility of a bike path from the new Park Royal South Gateway Residences development along the path on the south side of Marine Drive from Taylor Way to the Capilano Pacific trail which would give cyclists a safer route between the new development and the Spirit Trail. I was told that West Van owns the adjacent property, so this my be a possibility.
  • After asking a question, I was reminded that separating cyclists from pedestrians on the Spirit Trail between 14th and 16th Street is part of the Ambleside Waterfront Plan (Council motion in 2018) which will eventually be addressed by Council, probably after the last private property is acquired by the District.
  • I also asked about
  • Sean was receptive to my invitation for us to take up on abike ride through ambleside Dundarve and Park Royal

Ministry of Transportation & Infrastructure - Mike/Don

  • Blind spot where Orwell trail meets MSP-Keith Rd overpass MUP
    • MoTI has painted stop line & warnings, checking if signage is to follow.
  • Phibbs Exchange
    • Phase 1b just about finished - closure of eastbound off-ramp and east sidewalk for new drainage pipe
      • East sidewalk on bridge reopened
      • MUP on south side of main is being widened and flattened, should reopen soon.
    • Phase 2 just starting and will run for at least a year.
      • North side of main will be walk-your-bike south and west of Phibb's exchange, best to detour to South side of main.
      • The connection between Orwell and south side of Main is via detour 1/2 block west - not sure when it will be reopened.


Communications & Outreach - Rueben/Paul/Heather

  • let us know if there is something we should communicate about - blocked bike lanes, new infrastructure, etc.
  • Twitter (Rueben)
    • Checked out new MUP on Orwell St (July 10th, before recent construction changes)
    • Posted photos of partially complete Marine Drive bike lane between 25th and 31st Street
    • Notices for Phibbs construction (and closure of east side of Ironworkers Bridge)
    • Upcoming for August:
      • Orwell and Phibbs Exchange
      • Bike Boxes by Quay
  • Facebook(Heather)


Schools - Paul Janzen

  • Canyon Heights, Lynnmour, Braemar done so far.
  • Irwin Park in West Van last week. Funds came from MOTI ERG 4/5 program.
  • MOTI funding is sometimes used for anomaly areas such as White Rock, UBC, Bowen Island.
  • Duncan (DW) wants to start a "school streets" at Lynn Valley EL. Some discussions already started. DW discuss with Paul.



Developers - Fred, Paul & Peter

  • Currently active:
    • West Van
      • Any????
    • CNV
      • Capilano Mall
    • DNV
      • Lynn Valley Safeway
      • Maplewoods Garden (SE of Old Dollarton & Riverside)



Social

  • Jack Lonsdale, after the meeting
    • Any and all are welcome