Difference between revisions of "Tri-Cities Upcoming Projects"

From committees
Jump to navigation Jump to search
Line 9: Line 9:
 
'''''Please note: this list only covers projects funded by municipalities and governments. Projects built through property redevelopment are not shown on this list. For information on all civic projects, please check municipal websites. In addition, due to changing project schedules, projects are often subject to delay - often projects finish about a year later than projected.'''''
 
'''''Please note: this list only covers projects funded by municipalities and governments. Projects built through property redevelopment are not shown on this list. For information on all civic projects, please check municipal websites. In addition, due to changing project schedules, projects are often subject to delay - often projects finish about a year later than projected.'''''
   
 
*2023 projects are in purple
 
   
 
*2024 projects are in black
 
*2024 projects are in black
   
*2026 projects are in royal blue
+
*2025 projects are in royal blue
   
   
 
'''Coquitlam'''
 
'''Coquitlam'''
   
 
2024:
2023:
 
  +
*Guildford Greenway between Johnson St and Pinetree Way
*Cedar Drive multi-use path from 4180 Cedar Drive to Gilley's Trail
 
*Gatensbury Street multi-use path from the Port Moody border to Regan Street
 
*Guildford Way protected bike lanes from Johnson Street to the Port Moody border
 
*Signage through the Sumiqwuelu site (formerly Riverview)
 
*Lougheed Highway multi-use path between Pinetree Way and Westwood Street on the north side of the roadway
 
 
*Maillardville Greenway along Cartier Avenue from Schoolhouse Street to Marmont Street, then down Marmont Street to Quadling Avenue and west to Nelson Street
 
*Maillardville Greenway along Cartier Avenue from Schoolhouse Street to Marmont Street, then down Marmont Street to Quadling Avenue and west to Nelson Street
 
*New Strategic Transportation Plan
 
*New Strategic Transportation Plan
*United Boulevard multi-use path from King Edward Overpass west to existing terminus near New Westminster
 
   
 
2025:
2024:
 
 
*Barnet Highway eastbound protected bike lane from Falcon Drive to Bond Street
 
*Barnet Highway eastbound protected bike lane from Falcon Drive to Bond Street
*Guildford Way protected bike lanes from Johnson Street to Pinetree Way
+
*Ozada Avenue protected bike lanes from Pinetree Way to Coquitlam River Park
 
*Pipeline Road multi-use path from David Avenue to Guildford Way
 
*Cedar Drive multi-use path from 4180 Cedar Drive to Gilley's Trail
   
  +
2028
2025
 
*Pipeline Road multi-use path from David Avenue to Guildford Way along the west side, with new pedestrian lighting
 
 
*Fremont Connector and adjacent multi-use path
 
*Fremont Connector and adjacent multi-use path
 
   
 
'''Port Moody'''
 
'''Port Moody'''
   
 
2024:
2023:
 
 
*St Johns Street multi-use pathway from Moody Street to Barnet Highway
 
*St Johns Street multi-use pathway from Moody Street to Barnet Highway
 
*Trail Network Plan, including expansion, classification, standardization of signage, and more
 
*Trail Network Plan, including expansion, classification, standardization of signage, and more
Line 47: Line 40:
 
'''Port Coquitlam'''
 
'''Port Coquitlam'''
   
  +
2024:
2023:
 
 
*Kingsway Avenue multi-use path between Tyner Street and Kebet Way
 
*Kingsway Avenue multi-use path between Tyner Street and Kebet Way
 
2024:
 
 
*Donald Street Pathway between Wilson Avenue and McAllister Avenue
 
*Donald Street Pathway between Wilson Avenue and McAllister Avenue
*Fremont Connector and adjacent multi-use path
 
   
 
2025
 
2025
Line 58: Line 48:
 
*Prairie Avenue multi-use path between Coast Meridian Road and Shaughnessy Street
 
*Prairie Avenue multi-use path between Coast Meridian Road and Shaughnessy Street
   
  +
2028:
 
**Fremont Connector and adjacent multi-use path
   
   
Line 66: Line 58:
   
 
'''Anmore'''
 
'''Anmore'''
 
2023:
 
*Sunnyside Road multi-use path between East Road and (roughly) 2014 Sunnyside Road
 
   
 
2024:
 
2024:
 
*East Road multi-use path between (roughly) 2285 East Road and Sunnyside Road
 
*East Road multi-use path between (roughly) 2285 East Road and Sunnyside Road
*Sunnyside Road multi-use path between East Road and Alpine Drive
 
   
2026:
+
2025:
 
*East Road multi-use path between (roughly) 2285 East Road and 1343 East Road
 
*East Road multi-use path between (roughly) 2285 East Road and 1343 East Road
 
*Sunnyside Road multi-use path between East Road and Alpine Drive

Revision as of 23:13, 6 February 2024

Return to Tri-Cities Committee Wiki


Click the map to get to an interactive version!

Tri-Cities Upcoming Projects March 22 2023.jpg

Please note: this list only covers projects funded by municipalities and governments. Projects built through property redevelopment are not shown on this list. For information on all civic projects, please check municipal websites. In addition, due to changing project schedules, projects are often subject to delay - often projects finish about a year later than projected.


  • 2024 projects are in black
  • 2025 projects are in royal blue


Coquitlam

2024:

  • Guildford Greenway between Johnson St and Pinetree Way
  • Maillardville Greenway along Cartier Avenue from Schoolhouse Street to Marmont Street, then down Marmont Street to Quadling Avenue and west to Nelson Street
  • New Strategic Transportation Plan

2025:

  • Barnet Highway eastbound protected bike lane from Falcon Drive to Bond Street
  • Ozada Avenue protected bike lanes from Pinetree Way to Coquitlam River Park
  • Pipeline Road multi-use path from David Avenue to Guildford Way
  • Cedar Drive multi-use path from 4180 Cedar Drive to Gilley's Trail

2028

  • Fremont Connector and adjacent multi-use path

Port Moody

2024:

  • St Johns Street multi-use pathway from Moody Street to Barnet Highway
  • Trail Network Plan, including expansion, classification, standardization of signage, and more


Port Coquitlam

2024:

  • Kingsway Avenue multi-use path between Tyner Street and Kebet Way
  • Donald Street Pathway between Wilson Avenue and McAllister Avenue

2025

  • McAllister Avenue footbridge over the Coquitlam River (built to 4m width)
  • Prairie Avenue multi-use path between Coast Meridian Road and Shaughnessy Street

2028:

    • Fremont Connector and adjacent multi-use path


Belcarra

No projects funded.


Anmore

2024:

  • East Road multi-use path between (roughly) 2285 East Road and Sunnyside Road

2025:

  • East Road multi-use path between (roughly) 2285 East Road and 1343 East Road
  • Sunnyside Road multi-use path between East Road and Alpine Drive