Attendance: Bart, Bill, Richard, Peter, Antje, Fiona, John, Jay
 
Attendance: Bart, Bill, Richard, Peter, Antje, Fiona, John, Jay
 
 
=== Highlights===
 
=== Highlights===
 
 
'''Attendance & Agenda:'''
 
'''Attendance & Agenda:'''
 
* Welcome any new members
 
* Welcome any new members
Line 13: Line 11:
   
 
===Education & Outreach===
 
===Education & Outreach===
* VACC on JBAC (Jay/Antje)
+
* '''VACC on JBAC (Jay/Antje)'''
 
** Jay to write letter based on discussion. Desire voting position
 
** Jay to write letter based on discussion. Desire voting position
* November Bike to Work Week commuter station
+
* '''November Bike to Work Week commuter station'''
 
** Richard in communication with VACC about working with main station Tuesday Nov 2nd Morning at Lions Gate
 
** Richard in communication with VACC about working with main station Tuesday Nov 2nd Morning at Lions Gate
 
** Dollarton station on Thursday morning (Arcteryx and Cove Bikes)
 
** Dollarton station on Thursday morning (Arcteryx and Cove Bikes)
Line 22: Line 20:
 
** Jay, John, Bill and Antje committed bodies
 
** Jay, John, Bill and Antje committed bodies
 
** Need to prepare handouts (Jay)
 
** Need to prepare handouts (Jay)
* FAQ NS cyclist resource (John)
+
* '''FAQ NS cyclist resource (John)'''
 
** John to migrate his spreadsheet to GoogleDocs and send invites for review.
 
** John to migrate his spreadsheet to GoogleDocs and send invites for review.
 
** Eventually wikify the results after collaboration
 
** Eventually wikify the results after collaboration
 
** Boundaries
 
** Boundaries
* West Van cycling map (Bart)
+
* '''West Van cycling map (Bart)'''
 
** Brent Dozie offered to hire a consultant to sketch out master cycling routes in Spring
 
** Brent Dozie offered to hire a consultant to sketch out master cycling routes in Spring
 
** Money has been requested for 2011 budget.
 
** Money has been requested for 2011 budget.
Line 32: Line 30:
   
 
===Hot Spots & Issues===
 
===Hot Spots & Issues===
* IWMB (John/Jay/Antje)
+
* '''IWMB (John/Jay/Antje)'''
 
** Jay to forward messages to John and provide introductions to Vancouver and Burnaby committees
 
** Jay to forward messages to John and provide introductions to Vancouver and Burnaby committees
* SeaBus bike facilities (Tamiko)
+
* '''SeaBus bike facilities (Tamiko)'''
 
** Nothing to report
 
** Nothing to report
* Capilano University access (Antje)
+
* '''Capilano University access (Antje)'''
 
** Antje sent comments to email list that Jeremy will "keep us in the loop"
 
** Antje sent comments to email list that Jeremy will "keep us in the loop"
* Seymour Greenway (Antje)
+
* '''Seymour Greenway (Antje)'''
 
** Starting construction from above CapU
 
** Starting construction from above CapU
* Welsh Street (Bart)
+
* '''Welsh Street (Bart)'''
 
** Nothing has changed
 
** Nothing has changed
 
** Peter andBart met with Mayor Pam and Raymond (engineering) and Brent (Transportation)
 
** Peter andBart met with Mayor Pam and Raymond (engineering) and Brent (Transportation)
Line 46: Line 44:
 
** 3.5m westbound, 3.5m eastbound with 0.5 m paved shoulders + 1.2m separation utility strip + 4m Spirit Trail
 
** 3.5m westbound, 3.5m eastbound with 0.5 m paved shoulders + 1.2m separation utility strip + 4m Spirit Trail
 
** Metro staff is initiating dialogue with Squamish Nation to extend lower road through
 
** Metro staff is initiating dialogue with Squamish Nation to extend lower road through
* Lions Gate update (Peter)
+
* '''Lions Gate update (Peter)'''
 
** Peter, David and Dianne went on ride
 
** Peter, David and Dianne went on ride
 
** Met with group on the 23rd
 
** Met with group on the 23rd
Line 52: Line 50:
 
** Accepted all of our recommendations except separate bike lanes on Marine Dr
 
** Accepted all of our recommendations except separate bike lanes on Marine Dr
 
** Peter to commence dialogue with West Van to improve infrastructure after taking ramp down to 6th
 
** Peter to commence dialogue with West Van to improve infrastructure after taking ramp down to 6th
* Lynn Valley / Hwy1 crossing (David)
+
* '''Lynn Valley / Hwy1 crossing (David)'''
 
** Dave contacted the CNV about the survey done over a year ago regarding a greenway overpass or an alternative to overcome the Lynn Valley interchange and Highway 1 barrier to foot traffic and bicycles.
 
** Dave contacted the CNV about the survey done over a year ago regarding a greenway overpass or an alternative to overcome the Lynn Valley interchange and Highway 1 barrier to foot traffic and bicycles.
 
** The response is that they have been too busy as there are so many transportation issues. The trouble with them stalling is just that. The survey is getting old and stale and it hasn't been made public at all.
 
** The response is that they have been too busy as there are so many transportation issues. The trouble with them stalling is just that. The survey is getting old and stale and it hasn't been made public at all.

Latest revision as of 20:28, 7 October 2010

Attendance: Bart, Bill, Richard, Peter, Antje, Fiona, John, Jay

Highlights

Attendance & Agenda:

  • Welcome any new members
  • Additional business
    • Update on Wiki url
  • Review September minutes
    • Antje to draft letter to North Shore Mayors & Councils on funding for cycling infrastructure - Considered too late for UBCM, but needs to follow up. Jay to find out is VACC has any stuff about it.
    • Fiona to send out notice to Yahoo email list about Keith Road Greenway meeting - Meeting happened and it was deferred due to most residents opposing due to safety issues (crosswalk at St Davids)


Education & Outreach

  • VACC on JBAC (Jay/Antje)
    • Jay to write letter based on discussion. Desire voting position
  • November Bike to Work Week commuter station
    • Richard in communication with VACC about working with main station Tuesday Nov 2nd Morning at Lions Gate
    • Dollarton station on Thursday morning (Arcteryx and Cove Bikes)
    • John Henry willing to do Monday morning - location to be decided by them
    • Antje to organize with VACC for sponsorship for coffee/snacks and interface with John Henry for arrangements
    • Jay, John, Bill and Antje committed bodies
    • Need to prepare handouts (Jay)
  • FAQ NS cyclist resource (John)
    • John to migrate his spreadsheet to GoogleDocs and send invites for review.
    • Eventually wikify the results after collaboration
    • Boundaries
  • West Van cycling map (Bart)
    • Brent Dozie offered to hire a consultant to sketch out master cycling routes in Spring
    • Money has been requested for 2011 budget.
    • Won't see any movement until budget approved, expected in fall

Hot Spots & Issues

  • IWMB (John/Jay/Antje)
    • Jay to forward messages to John and provide introductions to Vancouver and Burnaby committees
  • SeaBus bike facilities (Tamiko)
    • Nothing to report
  • Capilano University access (Antje)
    • Antje sent comments to email list that Jeremy will "keep us in the loop"
  • Seymour Greenway (Antje)
    • Starting construction from above CapU
  • Welsh Street (Bart)
    • Nothing has changed
    • Peter andBart met with Mayor Pam and Raymond (engineering) and Brent (Transportation)
    • Wary of Squamish Nation's minimum footprint requirement
    • 3.5m westbound, 3.5m eastbound with 0.5 m paved shoulders + 1.2m separation utility strip + 4m Spirit Trail
    • Metro staff is initiating dialogue with Squamish Nation to extend lower road through
  • Lions Gate update (Peter)
    • Peter, David and Dianne went on ride
    • Met with group on the 23rd
    • Dave Queen (MoT) is a rider and is one of the designers
    • Accepted all of our recommendations except separate bike lanes on Marine Dr
    • Peter to commence dialogue with West Van to improve infrastructure after taking ramp down to 6th
  • Lynn Valley / Hwy1 crossing (David)
    • Dave contacted the CNV about the survey done over a year ago regarding a greenway overpass or an alternative to overcome the Lynn Valley interchange and Highway 1 barrier to foot traffic and bicycles.
    • The response is that they have been too busy as there are so many transportation issues. The trouble with them stalling is just that. The survey is getting old and stale and it hasn't been made public at all.
    • We could ask CNV council to get staff back onto it...to release the results. - Discuss in November meeting

Action Items

  • Bart to arrange room for 2011