# Attendance: Peter, Antje, Heather, Fiona, Dianne, Karine, Tony, Ellen, Tom, Dave
+
# Attendance: Peter, Antje, Heather, Fiona, Karine, Tony, Ella, Tom, Dianne, Trent, Dave
 
# Announcements
 
# Announcements
 
#* Open house new Keith Road bridge over Lynn Creek May 15, 5-8pm, Holiday Inn 700 Old Lillooet Road
 
#* Open house new Keith Road bridge over Lynn Creek May 15, 5-8pm, Holiday Inn 700 Old Lillooet Road
#* [http://www.coolnorthshore.ca/ Cool North Shore] theme for May: Reducing Your Footprint from Transportation: Commute by Bike. Cool Drinks Event May 27 - Jay will speak.
+
#* [http://www.coolnorthshore.ca/ Cool North Shore] theme for May: Reducing Your Footprint from Transportation: Commute by Bike. Cool Drinks Event May 27 - Jay MacDonald will speak on behalf of HUB.
 
# 4th Street bike route
 
# 4th Street bike route
#* Karine wrote a letter from HUB to mayor and councillors
+
#* Karine drafted and circulated a HUB letter, sent final to CNV mayor and councillors
  +
#* a lot of cars on bike route when traffic is backed up going east to the Ironworkers Memorial bridge and drivers shortcut along 4th
#* a lot of traffic and cyclists must detour around construction
 
#* it is planned to eventually become an AAA bike route
+
#* 4th is planned to eventually become an AAA bike route, but it needs traffic diversion and signals at major intersections
#* she got a response from the mayor saying they will discuss it further
+
#* quick response and acknowledgement from the mayor
 
# Green Necklace at Mahon Park: Greenway along Jones Ave
 
# Green Necklace at Mahon Park: Greenway along Jones Ave
 
#* Heather has drafted and circulated a HUB letter for comment
 
#* Heather has drafted and circulated a HUB letter for comment
#* She is concerned about the fact that it is only 3m wide not AAA, the transition from the east side to the west at 16th, and with parking on both sides it will be too narrow for cyclists on the road with sharrows
+
#* concerned hat the path is only 3m wide, like in Welch strip/DNV, and with parking retained on both sides it will be too narrow and unsafe for cyclists on the road with sharrows
#* Following a discussion, two realistic options were agreed on: traffic diverters at 16th and 19th to make it a traffic calmed street and remove parking on non park side to allow enough space for cyclists
+
#* following a discussion, two realistic options were agreed on: traffic diverters at 16th and 19th or 20th to make it a local traffic only street and/or reduce parking along Jones to allow enough space for a separated bike path
 
#* Heather would like input to the letter by noon tomorrow and asks us to fill out survey on the website
 
#* Heather would like input to the letter by noon tomorrow and asks us to fill out survey on the website
 
# Ironworkers Memorial bridge update
 
# Ironworkers Memorial bridge update
#* Antje said a letter was sent about the Main St on ramp but there are no funds to widen the sidewalk, so it was suggested that MLAs be approached to get funds
+
#* Antje said a HUB letter was sent to the four MLAs near the bridge about the Main St on ramp and Dollarton off ramp sidewalks since the bridge sidewalk widening does not include funding to widen the approach sidewalks
  +
#* meetings with three MLAs were positive, written feedback from the 4th MLA
#* Dollarton off ramp is also bad but MoT will widen it and move the crosswalk
 
  +
#* the Ministry has indicated now that the Dollarton off ramp sidewalk will be widened and the crosswalk moved before August (when the west sidewalk closes and everybody will use the east sidewalk)
#* Tony almost fell into traffic entering from the south end of the bridge
 
  +
#* Tony almost fell into highway traffic entering from the south end of the bridge, where the railing between the sidewalk and the roadway ends (note from Antje: railing is too short because it was recycled from the east sidewalk/north end - she asked MoTI to extend barrier)
#* Richard is writing a letter to MLAs about additional improvement needed
 
  +
#* a follow-up letter to MLAs is planned
# Highway 1 interchanges redesign in Lower Lynn (Will, 2min)
+
# Highway 1 interchanges redesign in Lower Lynn (Will, 2min) - deferred to the next meeting
 
# Highway 1 in West Van, Capilano River to Taylor Way, update
 
# Highway 1 in West Van, Capilano River to Taylor Way, update
  +
#* the Ministry has sent a response letter to our letter from last December: http://wiki.bikehub.ca/northshore/images/f/f3/2014-05-01_MoTI_Response_Hwy_1_Taylor_Way_to_Capilano_River_Bridge.pdf
#* Antje reported that West van will re-open the fence on the south side at 3rd Street
 
#* John Calimente will help us and work with MoT and widen path down to Keith on the north side
+
#* West Van will re-open the fence on the south side at 3rd Street, as reported by John Calimente at the April meeting
#* the letter from Mot was not very encouraging as they seem reluctant to make it easier for cyclists to ride on the north side of the Jersey barriers
+
#* the Ministry's response to our north side recommendations was not very encouraging as they seem reluctant to make it easier for cyclists to ride on the north side of the Jersey barriers
  +
#* Antje is following up with West Van about jurisdictional questions on the north side of highway
 
# Cyclist/pedestrian conflict on Spirit Trail in Norgate
 
# Cyclist/pedestrian conflict on Spirit Trail in Norgate
#* There is lots of bikes using the Spirit Trail which should have been made wider than the current 3.0 m
+
#* lots of bikes use the Welch strip Spirit Trail which should have been made wider than the current 3.0 m, or a separate bike path should have been built around the park
#* Eric Lund from the Norgate association wants to meet next week to discuss a strategy with HUB
+
#* a Norgate resident wants to meet and discuss a strategy with HUB to reduce user conflict
#* We agreed that a good solution would be a separated two-way bike lane on Welch St. between Pemberton and Whonoak and consideration could be given to make Welch one way for cars
+
#* we agreed that a good solution would be a separated two-way bike lane on Welch St. between Pemberton and Whonoak and consideration could be given to make Welch one way for cars
  +
#* Antje to continue discussion with Norgate residents
# Upper Capilano Road bike lanes (5min)
+
# Upper Capilano Road bike lanes
# DNV Transportation Planning Advisory Committee (2min)
 
  +
#* Trent forwarded drawings to the list but there has been no communication or input opportunities from the District
#* We should accept the offer from roger Basson of an official seat for HUB on the committee and leave Nelson as a member at large?
 
  +
#* no action since nobody present knew the plans or uses the road regularly
# HUB delegation presentation to DNV council - dry run
 
 
# DNV Transportation Planning Advisory Committee
#* Antje showed a few of her preliminary slides and entertained comments and suggestion from the group
 
 
#* we should ask for an official seat for HUB on the committee
#* It was sugested that the safe routes to schools program be included in the presentation
 
 
# Clyde-Keith traffic calming project
 
# Clyde-Keith traffic calming project
#* Sue Verigen, who attended our last meeting intervened at this week's council meeting asking that a higher priority be given to pedestrian facilities in the project
+
#* Sue Verigen, who attended our last meeting, intervened at this week's council meeting asking that a higher priority be given to pedestrian facilities in the project
 
#* Director of Engineering and Transportation, Raymond Fung, responded saying that due to funding,there will be a phased implementation starting with reconfiguring automobile traffic
 
#* Director of Engineering and Transportation, Raymond Fung, responded saying that due to funding,there will be a phased implementation starting with reconfiguring automobile traffic
 
#* Contrary to what John Calimente told us at the last meeting, the plan remains to install a multi-purpose path on the south side of the one-way section of Keith Road between 13th and 11th Streets
 
#* Contrary to what John Calimente told us at the last meeting, the plan remains to install a multi-purpose path on the south side of the one-way section of Keith Road between 13th and 11th Streets
 
#* Ray also mentioned that staff had discussed a sidewalk on Clyde Avenue but this was not included in the options presented the two open houses - Sue and I told him we want this option
 
#* Ray also mentioned that staff had discussed a sidewalk on Clyde Avenue but this was not included in the options presented the two open houses - Sue and I told him we want this option
 
# Hwy 1/99 bicycle detour
 
# Hwy 1/99 bicycle detour
#* Due to construction on the Nelson Creek bridge on Hwy 1, detour signs have been installed to divert cyclist onto Westport Road and Marine Drive
+
#* Due to construction on the Nelson Creek bridge on Hwy 1, detour signs have been installed to divert cyclists onto Westport Road and Marine Drive
 
#* Unfortunately, the signage on Marine Drive has been poorly done, implying that cyclists proceeding east must detour up Westport Road rather than continue east on Marine Drive
 
#* Unfortunately, the signage on Marine Drive has been poorly done, implying that cyclists proceeding east must detour up Westport Road rather than continue east on Marine Drive
 
#* Peter took photos of the signs earlier today and will email them to Erin Moxon from MoT tomorrow with copies to the Yahoo listserve
 
#* Peter took photos of the signs earlier today and will email them to Erin Moxon from MoT tomorrow with copies to the Yahoo listserve
 
#* Erin told him that after talking to West Van, there will be a sign on Cranley Drive pointing up the trail to the Seaview Walk which is a safer detour alternative for cyclists
 
#* Erin told him that after talking to West Van, there will be a sign on Cranley Drive pointing up the trail to the Seaview Walk which is a safer detour alternative for cyclists
 
# BIKE DAY on 26 May
 
# BIKE DAY on 26 May
#* Fiona gave a presentation to council, introducing them to Canada Bikes and telling them about the bike day plans
+
#* Fiona gave a presentation to CNV council, introducing them to Canada Bikes and telling them about the bike day plans
 
#* at 1600, there will be opening remarks followed by the 10 km ride at 1615 and 2 km ride at 1645
#* a 2 and 10 km ride are planned and Mark Ergetoski will provide electric bikes and the mayor has his own electric bike
 
#* Ashley McKiver will come on the ride
+
#* Ashley McIvor will probably come on the 10 km ride
 
#* on the same afternoon HUB will have a table in the Civic Plaza between 1530 and 1700
#* Linda Buchanan asked questions about provinces and MLAs and fiona respnded that BC is involved in Canada Bikes
 
 
#* it was suggested that Fiona should contact Erin and Mary Ellen about the HUB table
#* There was no commitment fromm coucillors
 
 
#* the North Shore Safety Council bike rodeo will be between 1530 – 1730 also at the plaza
#* The event will be between 1500 to 1700 or 1730 and HUB will have a table in the library Plaza between 1530 - 1700
 
  +
#* the City is organizing additional tents, participation from bike shops and doing the advertising
#* It was suggested that Fiona should contact to Erin and Mary Ellen
 
  +
# HUB delegation to North Van District Council on June 9, to ask for AAA bike network plan
#* The bike rodeo will be between 1530 – 1730
 
 
#* Antje showed a few of her preliminary slides and entertained comments and suggestion from the group
#* There may be a tent at 14th and Lonsdale as well at plaza and rodeo i.e. 3 tents
 
 
#* it was suggested that the safe routes to schools program be included in the presentation
#* At 1600, there will be opening remarks followed by the 10 km ride at 1615 and 2 km ride at 1645
 
#* Fiona needs 3 volunteers for each ride and she passed around a sheet for people to sign up to help with specific events
 
#* Renata will manage communication including apress release on the 20th
 
#* Councillors will be expected to arrive at 1600
 

Latest revision as of 17:10, 12 June 2014

  1. Attendance: Peter, Antje, Heather, Fiona, Karine, Tony, Ella, Tom, Dianne, Trent, Dave
  2. Announcements
    • Open house new Keith Road bridge over Lynn Creek May 15, 5-8pm, Holiday Inn 700 Old Lillooet Road
    • Cool North Shore theme for May: Reducing Your Footprint from Transportation: Commute by Bike. Cool Drinks Event May 27 - Jay MacDonald will speak on behalf of HUB.
  3. 4th Street bike route
    • Karine drafted and circulated a HUB letter, sent final to CNV mayor and councillors
    • a lot of cars on bike route when traffic is backed up going east to the Ironworkers Memorial bridge and drivers shortcut along 4th
    • 4th is planned to eventually become an AAA bike route, but it needs traffic diversion and signals at major intersections
    • quick response and acknowledgement from the mayor
  4. Green Necklace at Mahon Park: Greenway along Jones Ave
    • Heather has drafted and circulated a HUB letter for comment
    • concerned hat the path is only 3m wide, like in Welch strip/DNV, and with parking retained on both sides it will be too narrow and unsafe for cyclists on the road with sharrows
    • following a discussion, two realistic options were agreed on: traffic diverters at 16th and 19th or 20th to make it a local traffic only street and/or reduce parking along Jones to allow enough space for a separated bike path
    • Heather would like input to the letter by noon tomorrow and asks us to fill out survey on the website
  5. Ironworkers Memorial bridge update
    • Antje said a HUB letter was sent to the four MLAs near the bridge about the Main St on ramp and Dollarton off ramp sidewalks since the bridge sidewalk widening does not include funding to widen the approach sidewalks
    • meetings with three MLAs were positive, written feedback from the 4th MLA
    • the Ministry has indicated now that the Dollarton off ramp sidewalk will be widened and the crosswalk moved before August (when the west sidewalk closes and everybody will use the east sidewalk)
    • Tony almost fell into highway traffic entering from the south end of the bridge, where the railing between the sidewalk and the roadway ends (note from Antje: railing is too short because it was recycled from the east sidewalk/north end - she asked MoTI to extend barrier)
    • a follow-up letter to MLAs is planned
  6. Highway 1 interchanges redesign in Lower Lynn (Will, 2min) - deferred to the next meeting
  7. Highway 1 in West Van, Capilano River to Taylor Way, update
    • the Ministry has sent a response letter to our letter from last December: http://wiki.bikehub.ca/northshore/images/f/f3/2014-05-01_MoTI_Response_Hwy_1_Taylor_Way_to_Capilano_River_Bridge.pdf
    • West Van will re-open the fence on the south side at 3rd Street, as reported by John Calimente at the April meeting
    • the Ministry's response to our north side recommendations was not very encouraging as they seem reluctant to make it easier for cyclists to ride on the north side of the Jersey barriers
    • Antje is following up with West Van about jurisdictional questions on the north side of highway
  8. Cyclist/pedestrian conflict on Spirit Trail in Norgate
    • lots of bikes use the Welch strip Spirit Trail which should have been made wider than the current 3.0 m, or a separate bike path should have been built around the park
    • a Norgate resident wants to meet and discuss a strategy with HUB to reduce user conflict
    • we agreed that a good solution would be a separated two-way bike lane on Welch St. between Pemberton and Whonoak and consideration could be given to make Welch one way for cars
    • Antje to continue discussion with Norgate residents
  9. Upper Capilano Road bike lanes
    • Trent forwarded drawings to the list but there has been no communication or input opportunities from the District
    • no action since nobody present knew the plans or uses the road regularly
  10. DNV Transportation Planning Advisory Committee
    • we should ask for an official seat for HUB on the committee
  11. Clyde-Keith traffic calming project
    • Sue Verigen, who attended our last meeting, intervened at this week's council meeting asking that a higher priority be given to pedestrian facilities in the project
    • Director of Engineering and Transportation, Raymond Fung, responded saying that due to funding,there will be a phased implementation starting with reconfiguring automobile traffic
    • Contrary to what John Calimente told us at the last meeting, the plan remains to install a multi-purpose path on the south side of the one-way section of Keith Road between 13th and 11th Streets
    • Ray also mentioned that staff had discussed a sidewalk on Clyde Avenue but this was not included in the options presented the two open houses - Sue and I told him we want this option
  12. Hwy 1/99 bicycle detour
    • Due to construction on the Nelson Creek bridge on Hwy 1, detour signs have been installed to divert cyclists onto Westport Road and Marine Drive
    • Unfortunately, the signage on Marine Drive has been poorly done, implying that cyclists proceeding east must detour up Westport Road rather than continue east on Marine Drive
    • Peter took photos of the signs earlier today and will email them to Erin Moxon from MoT tomorrow with copies to the Yahoo listserve
    • Erin told him that after talking to West Van, there will be a sign on Cranley Drive pointing up the trail to the Seaview Walk which is a safer detour alternative for cyclists
  13. BIKE DAY on 26 May
    • Fiona gave a presentation to CNV council, introducing them to Canada Bikes and telling them about the bike day plans
    • at 1600, there will be opening remarks followed by the 10 km ride at 1615 and 2 km ride at 1645
    • Ashley McIvor will probably come on the 10 km ride
    • on the same afternoon HUB will have a table in the Civic Plaza between 1530 and 1700
    • it was suggested that Fiona should contact Erin and Mary Ellen about the HUB table
    • the North Shore Safety Council bike rodeo will be between 1530 – 1730 also at the plaza
    • the City is organizing additional tents, participation from bike shops and doing the advertising
  14. HUB delegation to North Van District Council on June 9, to ask for AAA bike network plan
    • Antje showed a few of her preliminary slides and entertained comments and suggestion from the group
    • it was suggested that the safe routes to schools program be included in the presentation