Difference between revisions of "Meeting Summary: April 10, 2014"

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
imported>Peter Scholefield
Line 6: Line 6:
 
#* HUB delegation to North Van City Council on May 12, for Bike Day in Canada and any other HUB/cycling items (Fiona)
 
#* HUB delegation to North Van City Council on May 12, for Bike Day in Canada and any other HUB/cycling items (Fiona)
 
#* [http://www.coolnorthshore.ca/ Cool North Shore] theme for May: Reducing Your Footprint from Transportation: Commute by Bike. Cool Drinks Event May 27 - Jay will speak.
 
#* [http://www.coolnorthshore.ca/ Cool North Shore] theme for May: Reducing Your Footprint from Transportation: Commute by Bike. Cool Drinks Event May 27 - Jay will speak.
#* City of NV is planning to install bike racks at the SeaBus terminal and wants our input re secure racks - difficult to answer so suggestion is to proceed now to install more normal racks.
 
 
# West Vancouver updates (John Calimente)
 
# West Vancouver updates (John Calimente)
 
#* Hwy 1 connection with 3rd St/Inglewood (hole in the fence)
 
#* Hwy 1 connection with 3rd St/Inglewood (hole in the fence)
Line 18: Line 17:
 
#** Sidewalk on the south side and sharrow lanes by Evelyn Drive development to be extended west on Keith to 13th Street
 
#** Sidewalk on the south side and sharrow lanes by Evelyn Drive development to be extended west on Keith to 13th Street
 
#** cyclists going west on Keith will be directed up the slip lane at 12th and onto Clyde Avenue, those going east on Keith can proceed from 13th and Marine Drive
 
#** cyclists going west on Keith will be directed up the slip lane at 12th and onto Clyde Avenue, those going east on Keith can proceed from 13th and Marine Drive
#** we thought it important for a convenient pedestrian connection from Keith Road to Hollyburn School and a drawing showing a sidewalk and traffic on Clyde Ave. between 12th was 13th was shown
+
#** we thought it important for a convenient pedestrian connection from the planned Keith Road sidewalk to Hollyburn School
  +
#** a drawing showing a sidewalk and traffic configuration on Point Grey Road was shown as an example of what might be done on Clyde Ave. between 12th was 13th
#* War Dance Bridge
 
#* Spirit Trail extension
+
#* Capilano Pacific Trail improvement
  +
#** plan to improve dirt pathway for cyclists from the westbound bridge over the Capilano River south to the Spirit trail is progressing
# Bollard design issues in City of North Van and West Van (2min)
 
# Park Royal Capilano River bridge/Spirit Trail (Peter, 5min)
+
#* Spirit Trail West
  +
#** phase 1 plan has been finalized to basically maintain the Seaview Walk as it is with no improvement on the stairway path at the east end for cyclists to connect to Cranley Drive
  +
#** phase 2 will continue the trail from SeaView Walk behind the Gleneagles Community Centre and west to the traffic circle on Marine Drive just past Gleneagles School.
  +
#** phase 3 plans are still under discussion with the currently favoured option to use Exit 0 from Marine Drive to the ferry terminal parking lot
  +
#** we suggested the southbound access from the Horseshoe Bay passenger terminal to Exit 0 for cyclists should be through the middle of the parking lot where there is currently an access for traffic.
 
# Bollard design issues in City of North Van and West Van
  +
#* deferred to the next meeting
  +
# Park Royal Capilano River bridge/Spirit Trail (Peter)
  +
#* Park Royal VP, Rick Amantea, said an engineering firm has proposed a cantilever multi-purpose path on the south side of the War dance bridge which could be completed later this summer
  +
#* we will be shown the plans when they are completed
 
# School bike rodeo program (Tom/North Shore Safety Council, 15min)
 
# School bike rodeo program (Tom/North Shore Safety Council, 15min)
 
# Cycling Conference (Richard Campbell/VeloWorks Cycling Society, 10min)
 
# Cycling Conference (Richard Campbell/VeloWorks Cycling Society, 10min)
 
# HUB participation in 2014 North Shore community events (Erin, 10min)
 
# HUB participation in 2014 North Shore community events (Erin, 10min)
# Type of bike parking needed at Lonsdale Quay/SeaBus (Antje, 5min)
+
# Type of bike parking needed at Lonsdale Quay/SeaBus (Antje)
 
#* City of NV is planning to install bike racks at the SeaBus terminal and wants our input re secure racks - difficult to answer so suggestion is to proceed now to install more normal racks.
 
# Ironworkers Memorial bridge construction issues (Antje, 1min)
 
# Ironworkers Memorial bridge construction issues (Antje, 1min)
 
# Bike Day in Canada, Library cycling info session update (Fiona, 7min)
 
# Bike Day in Canada, Library cycling info session update (Fiona, 7min)

Revision as of 13:47, 11 April 2014

  1. Attendance: Antje, Peter, Fiona, Tom, Dianne, Dennis, Don, Sue, Nelson, Erin, Sibylle, Sahara, Erika, Lesley, Trent
    • Guests: John Calimente, Transportation Planning Analyst, District of West Vancouver; Richard Campbell, VP VeloWorks Cycling Society and President of BC Cycling Coalition
  1. Announcements
    • HUB delegation to North Van District Council on June 9, to ask for AAA bike network plan (Antje)
    • HUB delegation to North Van City Council on May 12, for Bike Day in Canada and any other HUB/cycling items (Fiona)
    • Cool North Shore theme for May: Reducing Your Footprint from Transportation: Commute by Bike. Cool Drinks Event May 27 - Jay will speak.
  2. West Vancouver updates (John Calimente)
    • Hwy 1 connection with 3rd St/Inglewood (hole in the fence)
      • hole in fence at 3rd and Inglewood will be reinstated by DWV and improved with noise baffles
      • we suggest design primarily for cyclists proceeding to and from the bridge over the Capilano River
    • Safety improvements at Argyle/13th St
      • plan to deactivate the existing end of Spirit Trail and just past the kiosk, direct cyclists onto Argyle and pedestrians onto a raised crosswalk across Argyle to the sidewalk on the south side
      • bike box north of tracks for cyclists turning left onto Bellevue or at stop sign on Argyle for cyclists turning right onto 13th street? - we suggest both
    • Clyde/Keith area traffic calming
      • one-way traffic east on Keith Road from 13th to 12th Streets will be extended to 11th St. and westbound traffic on Keith will be directed south to Marine Drive or north to Fulton Ave.
      • Sidewalk on the south side and sharrow lanes by Evelyn Drive development to be extended west on Keith to 13th Street
      • cyclists going west on Keith will be directed up the slip lane at 12th and onto Clyde Avenue, those going east on Keith can proceed from 13th and Marine Drive
      • we thought it important for a convenient pedestrian connection from the planned Keith Road sidewalk to Hollyburn School
      • a drawing showing a sidewalk and traffic configuration on Point Grey Road was shown as an example of what might be done on Clyde Ave. between 12th was 13th
    • Capilano Pacific Trail improvement
      • plan to improve dirt pathway for cyclists from the westbound bridge over the Capilano River south to the Spirit trail is progressing
    • Spirit Trail West
      • phase 1 plan has been finalized to basically maintain the Seaview Walk as it is with no improvement on the stairway path at the east end for cyclists to connect to Cranley Drive
      • phase 2 will continue the trail from SeaView Walk behind the Gleneagles Community Centre and west to the traffic circle on Marine Drive just past Gleneagles School.
      • phase 3 plans are still under discussion with the currently favoured option to use Exit 0 from Marine Drive to the ferry terminal parking lot
      • we suggested the southbound access from the Horseshoe Bay passenger terminal to Exit 0 for cyclists should be through the middle of the parking lot where there is currently an access for traffic.
  3. Bollard design issues in City of North Van and West Van
    • deferred to the next meeting
  4. Park Royal Capilano River bridge/Spirit Trail (Peter)
    • Park Royal VP, Rick Amantea, said an engineering firm has proposed a cantilever multi-purpose path on the south side of the War dance bridge which could be completed later this summer
    • we will be shown the plans when they are completed
  5. School bike rodeo program (Tom/North Shore Safety Council, 15min)
  6. Cycling Conference (Richard Campbell/VeloWorks Cycling Society, 10min)
  7. HUB participation in 2014 North Shore community events (Erin, 10min)
  8. Type of bike parking needed at Lonsdale Quay/SeaBus (Antje)
    • City of NV is planning to install bike racks at the SeaBus terminal and wants our input re secure racks - difficult to answer so suggestion is to proceed now to install more normal racks.
  9. Ironworkers Memorial bridge construction issues (Antje, 1min)
  10. Bike Day in Canada, Library cycling info session update (Fiona, 7min)