Difference between revisions of "Current Public Consultations"

From committees
Jump to navigation Jump to search
imported>Dpiercy
Line 5: Line 5:
 
''The Section titles below are linked to the surveys''.
 
''The Section titles below are linked to the surveys''.
 
<br/><br/>
 
<br/><br/>
==[https://www.dnv.org/streets-transportation/main-street-cycling-improvements '''Main Street - west of 2nd Narrows bridge''']==
 
*Main St westbound from Harbour Ave to Lynn Creek Bridge (CNV boundary). South of Canadian Tire mall.
 
* [https://www.dnv.org/streets-transportation/main-street-cycling-improvements Survey] now open until May 29th (5 mins, 4 pages with mostly multiple choice)
 
**Closing a '''critical gap''' on one of HUB North Shore's 3 '''top priority routes'''''
 
**The proposed solutions seems reasonable. We need the Short-term solution ASAP and Long-term when possible.
 
* Some things you may want to comment on:
 
**In the long term the bikelanes on Main Street should be connected to the bike lanes on lower Mountain Highway, and extended on to Phibbs Exchange/Iron Workers Memorial Bridge (avoiding the detour on Barrow).
 
**The bikelanes should be 2m wide where possible to allow passing.
 
**Consider a raised crossing for both the crosswalks and bikelane at the Mall entrance and Lynn Rd
 
**Improve Barrows St as well, as part of the short term fix.
 
<br/>
 
   
 
==[https://dnv.civilspace.io/en/projects/lynn-valley-road-active-transportation-phase-2/engagements/150 '''Upper Lynn Valley Road - Peters to Dempsey''']==
==[https://shapeyourcity.ca/stanley-park-mobility-study '''Stanley Park Mobility Survey''']==
 
  +
* Continuing the Safety improvements including bikelanes, that were installed on Lynn Valley Rd between the Town Centre (Mtn Hwy) and Peters Rd in 2022.
* [https://shapeyourcity.ca/stanley-park-mobility-study Survey] is open until June 1st (~? mins, ? pages with mostly multiple choice)
 
 
* [https://dnv.civilspace.io/en/projects/lynn-valley-road-active-transportation-phase-2/engagements/150 Survey] now open until June 5th, 2023 (~20 mins, x pages with mostly multiple choice)
** Stanley Park, and especially the causeway, provides a key connection between North Shore and the rest of Vancouver
 
* Some things you may want to comment on:
+
* Some things you may want to consider when completing the survey:
** TBD
+
**aaa
  +
**bbb
<br/>
 
  +
**ccc
 
==[https://www.dnv.org/streets-transportation/lynn-valley-road-active-transportation-phase-2 '''Upper Lynn Valley Road, Phase 2''']==
 
*Lynn Valley Road from Peters Rd to Dempsey (End-of-line Cafe)
 
* [https://www.dnv.org/streets-transportation/lynn-valley-road-active-transportation-phase-2 Survey] is open until June 6th (~10 mins, 4 pages with mostly multiple choice)
 
** Open House: Thursday, May 26, 3:30pm - 7:30pm, Karen Magnussen Community Recreation Centre, Eagle Room
 
* Some things you may want to comment on:
 
** To achieve the District's goals of increase use of Active transportation in this corridor, the route must provide a safe and desirable option for people to get to their destination (shop, school, work, recreation)
 
** Prioritize safety and options for active transportation over storage of private vehicles
 
* [https://www.dnv.org/streets-transportation/lynn-valley-road-active-transportation-–-phase-1 Upper Lynn Valley Rd Phase 1 from Mtn Hwy to Peters] will be built this summer.
 
<br/>
 
 
==[https://letstalk.cnv.org/theshipyards '''The Shipyards Strategy''']==
 
*[https://letstalk.cnv.org/theshipyards Survey] is now open until August 31st 4pm (it’s quick ~ 5 minutes. 1 open ended, rest are multiple choice/checkboxes).
 
*‘What could we do better?’. A few cycling related responses:
 
**More bike parking
 
**Better/clearer bike routes (wayfinding signage with destinations, pavement markings)
 
**Separation of walking & cycling
 
**Slower car speeds in the surrounding areas
 
**Bike valet at events
 
 
<br/>
 
<br/>

Revision as of 16:24, 18 May 2023

Public input is critical when Council and Staff make trade-offs and decisions.
Please make sure your voice is heard!!

The Section titles below are linked to the surveys.

Upper Lynn Valley Road - Peters to Dempsey

  • Continuing the Safety improvements including bikelanes, that were installed on Lynn Valley Rd between the Town Centre (Mtn Hwy) and Peters Rd in 2022.
  • Survey now open until June 5th, 2023 (~20 mins, x pages with mostly multiple choice)
  • Some things you may want to consider when completing the survey:
    • aaa
    • bbb
    • ccc