** Hiring a consultant to do the connection on Marine between Capilano Rd and Garden, Hope to build next spring.
 
** Hiring a consultant to do the connection on Marine between Capilano Rd and Garden, Hope to build next spring.
   
*Barriers at Keith at Cloverly
+
*'''Barriers at Keith at Cloverly'''
 
** Antje to send info to Fred and Don with map.
 
** Antje to send info to Fred and Don with map.
   
<!--
 
'''Rufus/Kirkstone and Brooksbank'''
 
*DNV connection to Casano/Loutet overpass
 
*DNV feels that existing road network is adequate (low traffic volumes) and are not planning on changes at this time
 
 
'''Steep MUP from Deep Cove to Parkgate via Indian River neighbourhood'''
 
*Funds for this are only in the $100,000 range.
 
*Goal is to upgrade parts of the existing trail.
 
*Nothing definite at this stage.
 
 
 
 
 
*'''barriers in Phillips tunnel '''
 
*'''barriers in Phillips tunnel '''
 
** Ingrid to discuss with MoTI in Sept.
 
** Ingrid to discuss with MoTI in Sept.
 
 
'''Other'''
 
*Need to ask about budget for missing Wayfinding signage
 
*DNV did not buy bike path sweeper in 2020 due to COVID-19, but not sure if it is in the 2021 budget request.
 
*Started discussion of adding protection to bike lanes on Mountain Highway south of the Hwy Overpass. DNV however is adverse to providing protection, pointing out that there are alternative safe routes when MoTI project is completed.
 
 
 
<br/>
 
<br/>
   

Revision as of 12:18, 4 October 2021

HUB North Shore Committee regular meetings was be held online using Zoom, on Sep 2th at 6:30pm - 8:30pm.

Attendees: Don P, Mike C, Antje W, Fred R

General

  • Agenda additions
  • Introductions
  • Return to in person meetings?
    • Probably too soon, but in new year?
    • Mike suggested a social event, perhaps at shipyards -
    • Some liked convenience of virtual meetings, can continue them when we resume physical ones.
  • Recruiting:
    • will discuss next meeting. Need some more people for 2021


Upcoming Events

  • Happy Go By Bike Week!! - Sep 21 to Oct 1 -
    • Tuesday 29th 4-6pm - 1st and Welch St (CNV) - Peter & Don to attend
    • Decided too much work to sponsor one at 2nd Narrows

City of North Vancouver - Erika/Nadia

CNV Teams & Key Contacts

Kings Mill Walk master plan

  • Protected bike detour on Harbourside for duration of construction (1+ year)

Flexible Posts

  • Keith/Heywood: Paint & delineators have been installed

ITC - Dana & Jonathan No updates


District of North Vancouver - Fred/Don

    • Upper LV Road (Phase I) from TC to Peters Road in 2021. - on hold
  • Arborlyn Connector
    • Provided comments on Draft designs for a MUP on west/north side of Mountain Hwy north of the overpass.
      • Plan to build this fall
    • Waiting for design on East/south side - build in spring 2022?
  • Tatlow + W15th
    • Construction should be underway
    • Hiring a consultant to do the connection on Marine between Capilano Rd and Garden, Hope to build next spring.
  • Barriers at Keith at Cloverly
    • Antje to send info to Fred and Don with map.
  • barriers in Phillips tunnel
    • Ingrid to discuss with MoTI in Sept.


District of West Vancouver - Paul/Peter/Mike

  • Bike to shop day on 7 August
    • Don and I volunteered at the both set up by HUB, located at the atrium in Park Royal South which was not a location attractive for people on bicycles.
    • Don and I invited passing pedestrians to the booth and we counted over 100.
    • Only two cyclists showed up at the booth and it was at the end of the 2-hour period.
    • Apparently ADBI had been approached to participate but did want to pay the participation fees to HUB.
  • 26 August phone call with Jenn Moller, director of Engineering and Transportation
    • Ciclovia
      • West Vancouver Active Family Day on Sunday, 26 September may not occur as planned due to concerns expressed by ADBI about their responsibility in organizing and paying for the event.
      • Jenn has canvassed interested parties for a 30-minute meeting with ADBIA next week.
      • I sense a concern about who will fund the event - Jenn says she is willing to contribute $12,00 but doesn't have the money in her budget.
      • It seems likely to me that the event will be postponed until next spring.
    • Lack of bike racks in Ambleside parks
    • In response to the photo of 23 bikes strewn over the lawn in John Lawson Park, Jenn said that there was a 2020 plan for bike racks in the parks but it didn't happen due to COVID-19.
    • Plans for bike lanes on Westmount Road
  • DWV Capital Planning
    • Jenn said her deadline for input is the end of September and she would like to meet with us before then to discuss her input.
  • Strategic Transportation plan update
    • Preparation is behind schedule and it is planned to have technical conditions and milestones for the project by the end of August.
    • The timing for consulting with stakeholders has not yet been determined.
  • Protected bike lane on Marine Drive east of the LGB
    • DNV has the lead on this project and DWV will provide input with the project due for completion in 2022.
  • Lime bike share
    • Implementation issues in North Van have delayed setting up in West Van.

MOTI - Don/Jonathan

  • Lower Lynn Interchanges
    • Mountain Hwy Interchange
      • 4m MUP along the north side westbound Mtn Hwy offramp will have 10 "refuges", so the hill will be a series of 10m 15% pitches with 2m flats (refuge). Should open in mid-Sep.
      • Have asked for protection for Northbound on Mtn-Hwy at south intersection
    • Mt Seymour parkway/Keith Interchange
      • bike detour in place until Mid-sept (to demolish old bridge and complete south side of new one)
    • Main-Dollarton interchange
      • onramp to IWMB west sidewalk closed until Nov (detour via east sidewalk)
      • new 4m MUP on south side of main-dollarton open but unfinished, Mid September hopefully
        • New wider(was 2m, new 4m) island at East intersection is under construction
      • new access ramps to existing tunnel on north side will be rebuild from Mid-Sept to late Oct.
    • Phibbs exchange upgrade
      • Construction could start in spring 2022 at earliest
      • moving bus stops to Oxford & Main Street for duration of construction
  • Cycling Gaps project
    • Consultant still working on list, 450 gaps. Prioritization of them will be another project.
  • BC Economic Recovery funding -
    • HUB provided feedback to design team (Parsons) on near final design of Lynn Valley Rd underpass and Capilano Rd interchange
    • have asked to see and share final designs - no word back yet
  • Lane Control upgrades on Lions Gate Bridge & Causeway
    • Minimal impact on cyclists, most of the work will be at night and won't block the path.
  • Hwy 1 North Shore Corridor Study: Lynn Valley to Horseshoe Bay
    • Still waiting for draft report - seems to be on hold