2021-09-02 Summary
Jump to navigation
Jump to search
HUB North Shore Committee regular meetings was be held online using Zoom, on Sep 2th at 6:30pm - 8:30pm.
Attendees: Don P, Mike C, Antje W, Fred R
General
- Agenda additions
- Introductions
- Return to in person meetings?
- Probably too soon, but hopefully in 2021
- Mike suggested a social event, perhaps at shipyards
- Some liked convenience of virtual meetings. We will continue them when we resume physical ones.
- Recruiting:
- will discuss next meeting. Need some more people for 2021
Upcoming Events
- Happy Go By Bike Week!! - Sep 21 to Oct 1 -
- Tuesday 29th 4-6pm - 1st and Welch St (CNV) - Peter & Don to attend
- Decided too much work to sponsor one at 2nd Narrows
City of North Vancouver - Erika/Nadia
- Kings Mill Walk master plan
- Protected bike detour on Harbourside for duration of construction (1+ year)
- Flexible Posts
- Keith/Heywood: Paint & delineators have been installed
- ITC - Dana & Jonathan
- No updates
District of North Vancouver - Fred/Don
- Upper LV Road (Phase I) from TC to Peters Road
- on hold
- Arborlyn Connector
- Provided comments on Draft designs for a MUP on west/north side of Mountain Hwy north of the overpass.
- Plan to build this fall
- Waiting for design on East/south side - build in spring 2022?
- Provided comments on Draft designs for a MUP on west/north side of Mountain Hwy north of the overpass.
- Tatlow + W15th
- Construction should be underway
- Hiring a consultant to do the connection on Marine between Capilano Rd and Garden, Hope to build next spring.
- Barriers at Keith at Cloverly
- Antje to send info to Fred and Don with map.
- barriers in Phillips tunnel
- Ingrid to discuss with MoTI in Sept.
District of West Vancouver - Paul/Peter/Mike
- Bike to shop day on 7 August
- Don and I volunteered at the both set up by HUB, located at the atrium in Park Royal South which was not a location attractive for people on bicycles.
- Don and I invited passing pedestrians to the booth and we counted over 100.
- Only two cyclists showed up at the booth and it was at the end of the 2-hour period.
- Apparently ADBI had been approached to participate but did want to pay the participation fees to HUB.
- 26 August phone call with Jenn Moller, director of Engineering and Transportation
- Ciclovia
- West Vancouver Active Family Day on Sunday, 26 September may not occur as planned due to concerns expressed by ADBI about their responsibility in organizing and paying for the event.
- Jenn has canvassed interested parties for a 30-minute meeting with ADBIA next week.
- I sense a concern about who will fund the event - Jenn says she is willing to contribute $12,00 but doesn't have the money in her budget.
- It seems likely to me that the event will be postponed until next spring.
- Lack of bike racks in Ambleside parks
- In response to the photo of 23 bikes strewn over the lawn in John Lawson Park, Jenn said that there was a 2020 plan for bike racks in the parks but it didn't happen due to COVID-19.
- Plans for bike lanes on Westmount Road
- Jenn is awaiting grant funding and HUB-NS comments - I said that I was generally pleased with the engineer drawings.
- I have briefly discussed with Paul recommending speed pillows instead of speed humps on the route. I really like the ones recently installed on Roosevelt Cres east of Pemberton in DNV (http://wiki.bikehub.ca/northshore/index.php?title=File:Speed_pillows_on_Roosevelt_Cres_2021-08-20_IMG_3478.jpg).
- Ciclovia
- DWV Capital Planning
- Jenn said her deadline for input is the end of September and she would like to meet with us before then to discuss her input.
- Strategic Transportation plan update
- Preparation is behind schedule and it is planned to have technical conditions and milestones for the project by the end of August.
- The timing for consulting with stakeholders has not yet been determined.
- Protected bike lane on Marine Drive east of the LGB
- DNV has the lead on this project and DWV will provide input with the project due for completion in 2022.
- Lime bike share
- Implementation issues in North Van have delayed setting up in West Van.
MOTI - Don/Jonathan
- Lower Lynn Interchanges
- Mountain Hwy Interchange
- 4m MUP along the north side westbound Mtn Hwy offramp will have 10 "refuges", so the hill will be a series of 10m 15% pitches with 2m flats (refuge). Should open in mid-Sep.
- Have asked for protection for Northbound on Mtn-Hwy at south intersection
- Mt Seymour parkway/Keith Interchange
- bike detour in place until Mid-sept (to demolish old bridge and complete south side of new one)
- Main-Dollarton interchange
- onramp to IWMB west sidewalk closed until Nov (detour via east sidewalk)
- new 4m MUP on south side of main-dollarton open but unfinished, Mid September hopefully
- New wider(was 2m, new 4m) island at East intersection is under construction
- new access ramps to existing tunnel on north side will be rebuild from Mid-Sept to late Oct.
- Phibbs exchange upgrade
- Construction could start in spring 2022 at earliest
- moving bus stops to Oxford & Main Street for duration of construction
- Mountain Hwy Interchange
- Cycling Gaps project
- Consultant still working on list, 450 gaps. Prioritization of them will be another project.
- BC Economic Recovery funding -
- HUB provided feedback to design team (Parsons) on near final design of Lynn Valley Rd underpass and Capilano Rd interchange
- have asked to see and share final designs - no word back yet
- Lane Control upgrades on Lions Gate Bridge & Causeway
- Minimal impact on cyclists, most of the work will be at night and won't block the path.
- Hwy 1 North Shore Corridor Study: Lynn Valley to Horseshoe Bay
- Still waiting for draft report - seems to be on hold