Meeting Summary: September 10, 2015: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
No edit summary
imported>Peter Scholefield
No edit summary
Line 2: Line 2:
# Minutes Review (5 min)
# Minutes Review (5 min)
# Car Free Day Follow up
# Car Free Day Follow up
#* got survey responses and results from 16 people and 3 names for the Yahoo group
#* got survey responses and results from 16 people and 3 names for the Yahoo group and two joined HUB
#* had dots put on new laminated maps
#* had dots put on new laminated maps
will post survey results and map with dots on the wiki
#* will post survey results and map with dots on the wiki
# Ironworkers Memorial Bridge ramps safety improvements - response from Jay Porter
# Ironworkers Memorial Bridge ramps safety improvements - response from Jay Porter
#* From Jay Porter on 4 September: "A temporary bike fence was installed at the south west end of the bridge. Fabrication of the new fence is taking longer than expected but a new longer bike fence will be installed at that location in 2 weeks. The bike fence for Dollarton and Main sidewalks are also being fabrication and will be installed later this month. The improvements planned at the south east end of the bridge was on hold until the west sidewalk opened because the work will require closure of the east sidewalk for 1-2 days, the pole relocation should occur in 1-2 weeks with the levelling and repaving to follow soon after. Lastly the paint bars with “slow down” will be installed at 3 of 4 bridge exits next week weather permitting, the 4th is the south east side which will be installed once the improvement works are completed there"
#* From Jay Porter on 4 September: "A temporary bike fence was installed at the south west end of the bridge. Fabrication of the new fence is taking longer than expected but a new longer bike fence will be installed at that location in 2 weeks. The bike fence for Dollarton and Main sidewalks are also being fabrication and will be installed later this month. The improvements planned at the south east end of the bridge was on hold until the west sidewalk opened because the work will require closure of the east sidewalk for 1-2 days, the pole relocation should occur in 1-2 weeks with the levelling and repaving to follow soon after. Lastly the paint bars with “slow down” will be installed at 3 of 4 bridge exits next week weather permitting, the 4th is the south east side which will be installed once the improvement works are completed there"
#* need to improve connection at each end of the bridge
# BTWW Organization (Tony)
# BTWW Organization (Tony)
#* Oct 27 1600-1800 at north end of the IWMB
# HUB-NS outreach package review (10 min)
# HUB-NS outreach package review (10 min)
#*
# Municipality Engagement Strategies (CNV, DNV, DWV - Rides & Keith Road?)
# Municipality Engagement Strategies (CNV, DNV, DWV - Rides & Keith Road?)
# Plans for a group assessment ride along the Spirit Trail (Peter 10 min)
# Plans for a group assessment ride along the Spirit Trail (Peter 10 min)
# Coho Festival September 13th from 11 a.m. - 6 p.m. at Ambleside Park, West Vancouver (Peter 5 min)
# Coho Festival September 13th from 11 a.m. - 6 p.m. at Ambleside Park, West Vancouver (Peter 5 min)
# Licence plate covers
# Other business
#* have a design but no pricing yet
#* wiil work with HUB HQ re financing
#* will put HUB website
# Next meeting is planned for 8 October
# Next meeting is planned for 8 October

Revision as of 01:59, 11 September 2015

  1. Attendance: Tony (chair), Peter, Dennis, Dianne, Giacomo, Don McPherson, Rob, Fiona, Heather, Don Piercy
  2. Minutes Review (5 min)
  3. Car Free Day Follow up
    • got survey responses and results from 16 people and 3 names for the Yahoo group and two joined HUB
    • had dots put on new laminated maps
    • will post survey results and map with dots on the wiki
  4. Ironworkers Memorial Bridge ramps safety improvements - response from Jay Porter
    • From Jay Porter on 4 September: "A temporary bike fence was installed at the south west end of the bridge. Fabrication of the new fence is taking longer than expected but a new longer bike fence will be installed at that location in 2 weeks. The bike fence for Dollarton and Main sidewalks are also being fabrication and will be installed later this month. The improvements planned at the south east end of the bridge was on hold until the west sidewalk opened because the work will require closure of the east sidewalk for 1-2 days, the pole relocation should occur in 1-2 weeks with the levelling and repaving to follow soon after. Lastly the paint bars with “slow down” will be installed at 3 of 4 bridge exits next week weather permitting, the 4th is the south east side which will be installed once the improvement works are completed there"
    • need to improve connection at each end of the bridge
  5. BTWW Organization (Tony)
    • Oct 27 1600-1800 at north end of the IWMB
  6. HUB-NS outreach package review (10 min)
  7. Municipality Engagement Strategies (CNV, DNV, DWV - Rides & Keith Road?)
  8. Plans for a group assessment ride along the Spirit Trail (Peter 10 min)
  9. Coho Festival September 13th from 11 a.m. - 6 p.m. at Ambleside Park, West Vancouver (Peter 5 min)
  10. Licence plate covers
    • have a design but no pricing yet
    • wiil work with HUB HQ re financing
    • will put HUB website
  11. Next meeting is planned for 8 October