October 2024: Difference between revisions
Jump to navigation
Jump to search
(Created page with " Return to Meeting Minutes ==In Attendance== Andrew, Colin, Colleen, Brian, Winter ==Report of the Co-Chair (Colin)== *Colin discussed the maze gate initiative with the Langley committee who hopes for similar success.") |
No edit summary |
||
Line 6: | Line 6: | ||
==Report of the Co-Chair (Colin)== |
==Report of the Co-Chair (Colin)== |
||
*Colin discussed the maze gate initiative with the Langley committee who hopes for similar success. |
*Colin discussed the maze gate initiative with the Langley committee who hopes for similar success. |
||
==New Business== |
|||
=Presentation - Seaview/Glenayre Cycling Improvements = |
|||
*Presentation by Brian and Winter |
|||
*Noted 50% of students walk to Ecole Glenayre but the other 50% drive despite relatively close catchment for non-French immersion students |
|||
*Brian and Winter noted the following infrastructure challenges: |
|||
**Lack of curb drop from Seaview turning southbound onto Glenayre protected bike lane |
|||
**Lack of curb drop from Angela turning southbound onto Glenayre protected bike lane |
|||
**No curbdrop at entrance to Heritage Woods Secondary on David/Heritage Mountain Drive |
|||
**Lack of bike infrastructure on Cecile Drive north/south near Seaview Elementary despite wide roads |
|||
**Potential for bidirectional infrastructure on College Park Way between Cardiff Way gate south to Seaview Elementary |
|||
Next Steps: |
|||
#Brian & Winter to prepare map for letdown improvements for HUB to use in lobbying |
|||
#Brian to submit delegation request form for Council |
Latest revision as of 04:14, 8 October 2024
In Attendance
Andrew, Colin, Colleen, Brian, Winter
Report of the Co-Chair (Colin)
- Colin discussed the maze gate initiative with the Langley committee who hopes for similar success.
New Business
Presentation - Seaview/Glenayre Cycling Improvements
- Presentation by Brian and Winter
- Noted 50% of students walk to Ecole Glenayre but the other 50% drive despite relatively close catchment for non-French immersion students
- Brian and Winter noted the following infrastructure challenges:
- Lack of curb drop from Seaview turning southbound onto Glenayre protected bike lane
- Lack of curb drop from Angela turning southbound onto Glenayre protected bike lane
- No curbdrop at entrance to Heritage Woods Secondary on David/Heritage Mountain Drive
- Lack of bike infrastructure on Cecile Drive north/south near Seaview Elementary despite wide roads
- Potential for bidirectional infrastructure on College Park Way between Cardiff Way gate south to Seaview Elementary
Next Steps:
- Brian & Winter to prepare map for letdown improvements for HUB to use in lobbying
- Brian to submit delegation request form for Council