Tri-Cities Upcoming Projects: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 21: | Line 21: | ||
2023: |
2023: |
||
⚫ | |||
*Gatensbury Street multi-use path from the Port Moody border to Regan Street |
*Gatensbury Street multi-use path from the Port Moody border to Regan Street |
||
⚫ | |||
*Signage through the Sumiqwuelu site (formerly Riverview) |
*Signage through the Sumiqwuelu site (formerly Riverview) |
||
*Lougheed Highway multi-use path between Pinetree Way and Westwood Street on the north side of the roadway |
*Lougheed Highway multi-use path between Pinetree Way and Westwood Street on the north side of the roadway |
||
⚫ | |||
⚫ | |||
*New Strategic Transportation Plan |
*New Strategic Transportation Plan |
||
*United Boulevard multi-use path from King Edward Overpass west to existing terminus near New Westminster |
*United Boulevard multi-use path from King Edward Overpass west to existing terminus near New Westminster |
||
⚫ | |||
⚫ | |||
⚫ | |||
2024: |
2024: |
||
⚫ | |||
⚫ | |||
*Fremont Connector and adjacent multi-use path |
*Fremont Connector and adjacent multi-use path |
||
*Guildford Way protected bike lanes from Johnson Street to Pinetree Way |
*Guildford Way protected bike lanes from Johnson Street to Pinetree Way |
||
⚫ | |||
'''Port Moody''' |
'''Port Moody''' |
Revision as of 04:02, 23 March 2023
Return to Tri-Cities Committee Wiki
Click the map to get to an interactive version!
Please note: this list only covers projects funded by municipalities and governments. Projects built through property redevelopment are not shown on this list. For information on all civic projects, please check municipal websites. In addition, due to changing project schedules, projects are often subject to delay
- 2023 projects are in purple
- 2024 projects are in black
- 2026 projects are in royal blue
Coquitlam
2023:
- Cedar Drive multi-use path from 4180 Cedar Drive to Gilley's Trail
- Gatensbury Street multi-use path from the Port Moody border to Regan Street
- Guildford Way protected bike lanes from Johnson Street to the Port Moody border
- Signage through the Sumiqwuelu site (formerly Riverview)
- Lougheed Highway multi-use path between Pinetree Way and Westwood Street on the north side of the roadway
- Maillardville Greenway along Cartier Avenue from Schoolhouse Street to Marmont Street, then down Marmont Street to Quadling Avenue and west to Nelson Street
- New Strategic Transportation Plan
- United Boulevard multi-use path from King Edward Overpass west to existing terminus near New Westminster
2024:
- Barnet Highway eastbound protected bike lane from Falcon Drive to Bond Street
- Fremont Connector and adjacent multi-use path
- Guildford Way protected bike lanes from Johnson Street to Pinetree Way
- Pipeline Road multi-use path from David Avenue to Guildford Way along the west side, with new pedestrian lighting
Port Moody
2023:
- St Johns Street multi-use pathway from Moody Street to Barnet Highway
- Trail Network Plan, including expansion, classification, standardization of signage, and more
Port Coquitlam
2023:
- Kingsway Avenue multi-use path between Tyner Street and Kebet Way
2024:
- Donald Street Pathway between Wilson Avenue and McAllister Avenue
- Fremont Connector and adjacent multi-use path
2025
- McAllister Avenue footbridge over the Coquitlam River (built to 4m width)
- Prairie Avenue multi-use path between Coast Meridian Road and Shaughnessy Street
Belcarra
No projects funded.
Anmore
2023:
- Sunnyside Road multi-use path between East Road and (roughly) 2014 Sunnyside Road
2024:
- East Road multi-use path between (roughly) 2285 East Road and Sunnyside Road
- Sunnyside Road multi-use path between East Road and Alpine Drive
2026:
- East Road multi-use path between (roughly) 2285 East Road and 1343 East Road