HUB Maple Ridge/Pitt Meadows letters/e-mails to developers: Difference between revisions
Jump to navigation
Jump to search
MapleRidge (talk | contribs) No edit summary |
MapleRidge (talk | contribs) No edit summary |
||
Line 6: | Line 6: | ||
*[[Media:MRPM_202203_Email_20278+20292 Patterson Ave.pdf | 2022Mar21 Email to Bissky Architecture re 20278 and 20292 Patterson Ave; 2018-489-RZ; bike parking]] |
*[[Media:MRPM_202203_Email_20278+20292 Patterson Ave.pdf | 2022Mar21 Email to Bissky Architecture re 20278 and 20292 Patterson Ave; 2018-489-RZ; bike parking]] |
||
== 2019 == |
== 2019 == |
||
*[[Media: |
*[[Media:MRPM_2019June_e-mail_bike_lanes_227_St.pdf | 2022May23 letter to Aquilini re industrial development at 11310 Kingston Street; 2018-458-RZ]] |
Revision as of 19:55, 23 May 2022
2022
- 2022May23 Email 10320 & 10350 Slatford Pl, 10337 & 10309 240 St.; 2018-289-RZ; pathway on south side
- 2022May16 Email to Aplin Martin; 2021-324-RZ; 20660, 20670 123 Ave & 20679 Tyner Ave; re connecting pathway
- 2022Apr25 Email to Lovick Scott re 2021-341-RZ, 22108-22164 Lougheed Hwy; bike parking
- 2022Apr14 Email to WestUrban Developments re 21783 Lougheed Hwy; 2021-061-RZ; connecting path and bike parking
- 2022Mar21 Email to Bissky Architecture re 20278 and 20292 Patterson Ave; 2018-489-RZ; bike parking