Meeting Summary: April 9, 2015: Difference between revisions
Jump to navigation
Jump to search
imported>Peter Scholefield No edit summary |
imported>Peter Scholefield No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 4: | Line 4: | ||
#* this item took up most of the meeting with discussion about the best bike routes into and through Lyn Valley. |
#* this item took up most of the meeting with discussion about the best bike routes into and through Lyn Valley. |
||
#* routes identified in the Lynn Valley Town Centre plans were discussed as were those routes identified on the bike master plan |
#* routes identified in the Lynn Valley Town Centre plans were discussed as were those routes identified on the bike master plan |
||
#* there were suggestion of other |
#* there were suggestion of other routes to consider, some of them off-street pathways |
||
#* It was agreed that there wasn't too much we could do about the Lynn Valley Town Centre routes as we have already made considerable input to the plans |
#* It was agreed that there wasn't too much we could do about the Lynn Valley Town Centre routes as we have already made considerable input to the plans |
||
#* It was decided that it would be a good idea to arrange a group ride so that we could become more familiar with some of the route options that were raised |
#* It was decided that it would be a good idea to arrange a group ride so that we could become more familiar with some of the route options that were raised |
||
Line 11: | Line 11: | ||
# North Shore Committee chair position open |
# North Shore Committee chair position open |
||
#* Antje formally announced that she was stepping down as Committee chair after this meeting |
#* Antje formally announced that she was stepping down as Committee chair after this meeting |
||
* Peter thanked Antje for the excellent work she had done as chair and the attendees responded with an an applause |
#* Peter thanked Antje for the excellent work she had done as chair and the attendees responded with an an applause |
||
* Peter said that he would chair the next meeting at which time nominations for a new chair would be accepted |
#* Peter said that he would chair the next meeting on 14 May at which time nominations for a new chair would be accepted |
||
# Bike BC provincial funding for cycling infrastructure |
# Bike BC provincial funding for cycling infrastructure |
||
#*attendees were encouraged to urge local municipal governments to take advantage of Bike BC funding |
#*attendees were encouraged to urge local municipal governments to take advantage of Bike BC funding |
||
# HUB library event March 16 recap |
# HUB library event March 16 recap |
||
#*Fiona is suggesting on 25 May we organize a similar event that was held last year to celebrate Canada Bike Day in the North Van City square |
|||
# West Van cycling |
# West Van cycling infrastructure issues |
||
* Hwy 1 north side paved shoulder west of Capilano River to 3rd Street |
#* Hwy 1 north side paved shoulder west of Capilano River to 3rd Street needs improvement now that the path down to Keith road has been improved with a packed gravel surface |
||
* War Dance Bridge |
|||
#* War Dance Bridge - Park Royal is still looking for another $500,000 to match their $500,000 to comppmlet the palnned project |
|||
* 1300 block Marine Drive redevelopment |
|||
#* 1300 block Marine Drive redevelopment - the 1300 block Bellevue bike route will be closed into June while construction begin on the Grosvenor 1300 block redevelopment project |
|||
* 1100 block Keith Road |
|||
#* 1100 block Keith Road - an open house was held in March concerning the proposed sidewalk on the south side but we would like a bike lane on the north side |
|||
* wayfinding signage |
|||
#* wayfinding signage - District engineer John Calimente has been consulting Antje and Peter about suggestion to install wayfinding signage on West Van bike routess |
Latest revision as of 06:19, 12 May 2015
- Attendance: Antje, Peter, Tony, Dennis, Nelson, Don, Rob, Erika, Giacomo, Sheldon, Andrew, Martyn, Fiona, Nick
- Lynn Valley bike network
- this item took up most of the meeting with discussion about the best bike routes into and through Lyn Valley.
- routes identified in the Lynn Valley Town Centre plans were discussed as were those routes identified on the bike master plan
- there were suggestion of other routes to consider, some of them off-street pathways
- It was agreed that there wasn't too much we could do about the Lynn Valley Town Centre routes as we have already made considerable input to the plans
- It was decided that it would be a good idea to arrange a group ride so that we could become more familiar with some of the route options that were raised
- Transit plebiscite - North Shore action
- flyers promoting a yes vote were distributed at the Lonsdale Quay on 30 March and at the Phibbs Exchange on 2 April
- North Shore Committee chair position open
- Antje formally announced that she was stepping down as Committee chair after this meeting
- Peter thanked Antje for the excellent work she had done as chair and the attendees responded with an an applause
- Peter said that he would chair the next meeting on 14 May at which time nominations for a new chair would be accepted
- Bike BC provincial funding for cycling infrastructure
- attendees were encouraged to urge local municipal governments to take advantage of Bike BC funding
- HUB library event March 16 recap
- Fiona is suggesting on 25 May we organize a similar event that was held last year to celebrate Canada Bike Day in the North Van City square
- West Van cycling infrastructure issues
- Hwy 1 north side paved shoulder west of Capilano River to 3rd Street needs improvement now that the path down to Keith road has been improved with a packed gravel surface
- War Dance Bridge - Park Royal is still looking for another $500,000 to match their $500,000 to comppmlet the palnned project
- 1300 block Marine Drive redevelopment - the 1300 block Bellevue bike route will be closed into June while construction begin on the Grosvenor 1300 block redevelopment project
- 1100 block Keith Road - an open house was held in March concerning the proposed sidewalk on the south side but we would like a bike lane on the north side
- wayfinding signage - District engineer John Calimente has been consulting Antje and Peter about suggestion to install wayfinding signage on West Van bike routess