Tri-Cities Upcoming Projects: Difference between revisions

From committees
Jump to navigation Jump to search
No edit summary
No edit summary
 
(37 intermediate revisions by the same user not shown)
Line 5: Line 5:
'''Click the map to get to an interactive version!'''
'''Click the map to get to an interactive version!'''


[[File:Upcoming_projects_No_bedwell_bay.jpg | border | 500px | link=https://www.google.com/maps/d/u/1/edit?mid=1AFXnV_S-5mQcAerJzc2CQkkQUeckspAU&usp=sharing]]


[[File:TC_Upcoming_Projects_2024-12-07.jpg| border | 500px | link=https://umap.openstreetmap.fr/en/map/hub-cycling-upcoming-projects_1020637]]
'''''Please note: this list only covers projects funded by municipalities and governments. Projects built through property redevelopment are not shown on this list. For information on all civic projects, please check municipal websites. In addition, due to changing project schedules, projects are often subject to delay'''''


'''''Please note: this list only covers projects funded by municipalities and governments. Projects built through property redevelopment are not shown on this list. For information on all civic projects, please check municipal websites. In addition, due to changing project schedules, projects are often subject to delay - often projects finish about a year later than projected.'''''
*2022 projects are in green


*2023 projects are in purple

*2024 projects are in black

*2026 projects are in royal blue


*2025 projects are in royal blue
*2026 projects are in pink
*2028 projects are in brown


'''Coquitlam'''
'''Coquitlam'''


2025:
2022:
*Guildford Greenway between Johnson St and Pinetree Way
*Gatensbury Street multi-use path from the Port Moody border to Regan Street
*Pipeline Road protected bike lanes between Guildford Way and Lincoln Avenue


2023:
*Regan Avenue multi-use path from Gatensbury Street to Wilmot Street
*Guildford Way interim protected bike lanes from Pinetree Way to the Port Moody border
*New Strategic Transportation Plan
*New Strategic Transportation Plan
*United Boulevard multi-use path from King Edward Overpass west to existing terminus near New Westminster
*Barnet Highway eastbound protected bike lane from Falcon Drive to Bond Street
*Barnet Highway eastbound protected bike lane from Falcon Drive to Bond Street
*Nelson Avenue between King Albert Avenue and Mackin Park
*Maillardville Greenway along Cartier Avenue from Schoolhouse Street to Marmont Street, then down Marmont Street to Quadling Avenue and west to Nelson Street
*King Albert Greenway between Hillcrest St and Mariner Way

2026
*Smith-Regan Greenway between Burquitlam Station and Mundy Park
*Ozada Avenue protected bike lanes from Pinetree Way to Coquitlam River Park
*Pipeline Road protected bike lanes from David Avenue to Guildford Way
*Cedar Drive multi-use path from 4180 Cedar Drive to Gilley's Trail
*Cedar Drive multi-use path from 4180 Cedar Drive to Gilley's Trail


2028
2024:
*Pipeline Road multi-use path from David Avenue to Guildford Way along the west side, with new pedestrian lighting
*Fremont Connector and adjacent multi-use path
*Fremont Connector and adjacent multi-use path



'''Port Moody'''
'''Port Moody'''


No projects funded.
2023:
*St Johns Street multi-use pathway from Moody Street to Barnet Highway
*Trail Network Plan, including expansion, classification, standardization of signage, and more



'''Port Coquitlam'''
'''Port Coquitlam'''


2025
2022:
*McAllister Avenue footbridge over the Coquitlam River (built to 4m width)
*Prairie Avenue multi-use path between Fremont Street and Burns Road
*Prairie Avenue multi-use path between Toronto Street and Coast Meridian Road

2023:
*Donald Street Pathway between Wilson Avenue and McAllister Avenue
*Kingsway Avenue multi-use path between Tyner Street and the dikes

2024:
*Prairie Avenue multi-use path between Coast Meridian Road and Shaughnessy Street
*Prairie Avenue multi-use path between Coast Meridian Road and Shaughnessy Street

2028:
*Fremont Connector and adjacent multi-use path
*Fremont Connector and adjacent multi-use path
*Lougheed Highway multi-use path on both sides, from Westwood Street to Shaughnessy Street

2025
*McAllister Avenue footbridge over the Coquitlam River (built to 4m width)




Line 70: Line 56:
'''Anmore'''
'''Anmore'''


2025:
2023:
*Sunnyside Road multi-use path between East Road and (roughly) 2014 Sunnyside Road
*East Road multi-use path between (roughly) 2285 East Road and 1343 East Road

2024:
*East Road multi-use path between (roughly) 2285 East Road and Sunnyside Road
*Sunnyside Road multi-use path between East Road and Alpine Drive
*Sunnyside Road multi-use path between East Road and Alpine Drive

2026:
*East Road multi-use path between (roughly) 2285 East Road and 1343 East Road

Latest revision as of 22:57, 7 December 2024

Return to Tri-Cities Committee Wiki


Click the map to get to an interactive version!


TC Upcoming Projects 2024-12-07.jpg

Please note: this list only covers projects funded by municipalities and governments. Projects built through property redevelopment are not shown on this list. For information on all civic projects, please check municipal websites. In addition, due to changing project schedules, projects are often subject to delay - often projects finish about a year later than projected.


  • 2025 projects are in royal blue
  • 2026 projects are in pink
  • 2028 projects are in brown

Coquitlam

2025:

  • Guildford Greenway between Johnson St and Pinetree Way
  • Pipeline Road protected bike lanes between Guildford Way and Lincoln Avenue
  • New Strategic Transportation Plan
  • Barnet Highway eastbound protected bike lane from Falcon Drive to Bond Street
  • Nelson Avenue between King Albert Avenue and Mackin Park
  • King Albert Greenway between Hillcrest St and Mariner Way

2026

  • Smith-Regan Greenway between Burquitlam Station and Mundy Park
  • Ozada Avenue protected bike lanes from Pinetree Way to Coquitlam River Park
  • Pipeline Road protected bike lanes from David Avenue to Guildford Way
  • Cedar Drive multi-use path from 4180 Cedar Drive to Gilley's Trail

2028

  • Fremont Connector and adjacent multi-use path

Port Moody

No projects funded.

Port Coquitlam

2025

  • McAllister Avenue footbridge over the Coquitlam River (built to 4m width)
  • Prairie Avenue multi-use path between Coast Meridian Road and Shaughnessy Street

2028:

  • Fremont Connector and adjacent multi-use path
  • Lougheed Highway multi-use path on both sides, from Westwood Street to Shaughnessy Street


Belcarra

No projects funded.


Anmore

2025:

  • East Road multi-use path between (roughly) 2285 East Road and 1343 East Road
  • Sunnyside Road multi-use path between East Road and Alpine Drive