2022-06-02 Agenda: Difference between revisions
imported>Dpiercy |
imported>Peter Scholefield |
||
(29 intermediate revisions by 4 users not shown) | |||
Line 3: | Line 3: | ||
'''In-person''' at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor). |
'''In-person''' at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor). |
||
Or Online, Zoom conference call: [https://us06web.zoom.us/j/81789523337?pwd=ZitLVHVoRmpQVFh3YjdpWi8wNVNTQT09 https://us06web.zoom.us/j/81789523337?pwd=ZitLVHVoRmpQVFh3YjdpWi8wNVNTQT09] |
'''Or Online''', Zoom conference call: [https://us06web.zoom.us/j/81789523337?pwd=ZitLVHVoRmpQVFh3YjdpWi8wNVNTQT09 https://us06web.zoom.us/j/81789523337?pwd=ZitLVHVoRmpQVFh3YjdpWi8wNVNTQT09] |
||
<span style="color:#FF3333">NOTE: this is a new zoom link</span> |
<span style="color:#FF3333">NOTE: this is a new zoom link</span> |
||
Line 31: | Line 31: | ||
*[https://shapeyourcity.ca/stanley-park-mobility-study '''Stanley Park Mobility Survey'''] |
*[https://shapeyourcity.ca/stanley-park-mobility-study '''Stanley Park Mobility Survey'''] |
||
** [https://shapeyourcity.ca/stanley-park-mobility-study Survey] is open until June 1st (~? mins, ? pages with mostly multiple choice) |
** [https://shapeyourcity.ca/stanley-park-mobility-study Survey] is open until June 1st (~? mins, ? pages with mostly multiple choice) |
||
***Stanley Park, especially the causeway provides a key connection between North Shore and the rest of Vancouver |
|||
** Some things you may want to comment on: |
** Some things you may want to comment on: |
||
*** TBD |
*** TBD |
||
<br/> |
<br/> |
||
[https://www.dnv.org/streets-transportation/lynn-valley-road-active-transportation-phase-2 '''Upper Lynn Valley Road, Phase 2'''] |
*[https://www.dnv.org/streets-transportation/lynn-valley-road-active-transportation-phase-2 '''Upper Lynn Valley Road, Phase 2'''] |
||
**Lynn Valley Road from Peters Rd to Dempsey (End-of-line Cafe) |
**Lynn Valley Road from Peters Rd to Dempsey (End-of-line Cafe) |
||
** '''Open House: Thursday, May 26, 3:30pm - 7:30pm''', Karen Magnussen Community Recreation Centre, Eagle Room |
|||
** [https://www.dnv.org/streets-transportation/lynn-valley-road-active-transportation-phase-2 Survey] is open until June 6th (~10 mins, 4 pages with mostly multiple choice) |
** [https://www.dnv.org/streets-transportation/lynn-valley-road-active-transportation-phase-2 Survey] is open until June 6th (~10 mins, 4 pages with mostly multiple choice) |
||
*** Open House: Thursday, May 26, 3:30pm - 7:30pm, Karen Magnussen Community Recreation Centre, Eagle Room |
|||
** Some things you may want to comment on: |
** Some things you may want to comment on: |
||
*** To achieve the District's goals of increase use of Active transportation in this corridor, the route must provide a safe and desirable option for people to get to their destination (shop, school, work, recreation) |
*** To achieve the District's goals of increase use of Active transportation in this corridor, the route must provide a safe and desirable option for people to get to their destination (shop, school, work, recreation) |
||
*** Prioritize safety and options for active transportation over storage of private vehicles |
*** Prioritize safety and options for active transportation over storage of private vehicles |
||
<br/> |
<br/> |
||
*[https://letstalk.cnv.org/theshipyards '''The Shipyards Strategy'''] |
*[https://letstalk.cnv.org/theshipyards '''The Shipyards Strategy'''] |
||
**Survey is now open until August 31st 4pm (it’s quick ~ 5 minutes. 1 open ended, rest are multiple choice/checkboxes). |
**Survey is now open until August 31st 4pm (it’s quick ~ 5 minutes. 1 open ended, rest are multiple choice/checkboxes). |
||
Line 51: | Line 53: | ||
***Bike valet at events |
***Bike valet at events |
||
<br/> |
<br/> |
||
* |
|||
===Goals & Objectives === |
===Goals & Objectives === |
||
Line 83: | Line 84: | ||
'''CNV Key Contacts & Staff Meetings''' |
'''CNV Key Contacts & Staff Meetings''' |
||
*HUB’s primary contact: Brandon Green |
*HUB’s primary contact: Brandon Green |
||
* |
*Next meeting with staff: TBD (likely late summer) |
||
''' |
'''Upper Levels Greenway''' |
||
*Submitted a letter to express our comments: [[File:CNV_UpperLevelsGreenway_052422.pdf]] |
|||
'''Summary of current/upcoming CNV projects - this year & beyond''' |
|||
*Esplanade Complete Street (construction underway, estimated completion: Summer 2022) |
|||
*Upper Levels Greenway (final design/route selection expected: Fall 2022) |
|||
*Mobility Strategy (implementation of some strategies to commence this year, e.g. zoning bylaw updates re new developments and bike storage) |
|||
*Carson Graham School - AT improvements (some sidewalk gaps to be addressed this year, most changes part of next year's budget) |
|||
*Kings Mill (detailed park design underway, construction to begin: Spring 2023) |
|||
*Cotton/Main St bridge (preliminary designs underway, construction is dependent on funding) |
|||
*Casano-Loutet Overpass (construction anticipated in 2023) |
|||
*Forbes & 3rd (long term, 2+ years away) |
|||
'''E-Bike Share''' |
|||
*Lime is working to add helmets to all bikes in the fleet. This will continue to occur as they receive parts/helmets to retrofit the fleet. Expect to see the percentage of bikes with helmets increase over the summer. |
|||
*Working on getting ridership data publicly available |
|||
<!--'''CNV Mobility Strategy''' |
|||
*Final Mobility Strategy unanimously approved by Council |
*Final Mobility Strategy unanimously approved by Council |
||
*HUB North Shore Letter of Support: [[File:2022-04-18_CNV-mobility-strategy.pdf]] |
*HUB North Shore Letter of Support: [[File:2022-04-18_CNV-mobility-strategy.pdf]] |
||
Line 102: | Line 120: | ||
*Taking on some research over the summer re new developments (including on/off street bike parking). Will engage HUB on guidelines this summer/fall. |
*Taking on some research over the summer re new developments (including on/off street bike parking). Will engage HUB on guidelines this summer/fall. |
||
*Sent this document to Brandon to share with the team: https://bikehub.ca/sites/default/files/hub_cycling_amenities_report.pdf |
*Sent this document to Brandon to share with the team: https://bikehub.ca/sites/default/files/hub_cycling_amenities_report.pdf |
||
'''E-Bike Share''' |
|||
*Going well, ridership has been strong & feedback has been positive |
|||
*Last summer, ~6000 rides/month with ~2.5 rides/bikes/day |
|||
*Ridership declined over the winter, but starting to creep up again |
|||
*In the process of addressing: providing helmets with the bikes, equity programs, additional groves across the city |
|||
*Working on getting ridership data publicly available |
|||
'''Casano-Loutet Overpass''' |
'''Casano-Loutet Overpass''' |
||
Line 115: | Line 126: | ||
*Scope is two-fold: need to conduct a bridge inspection + putting forward a business case to widen the bridge |
*Scope is two-fold: need to conduct a bridge inspection + putting forward a business case to widen the bridge |
||
*No detailed plans/designs yet; will engage HUB for input at a later stage |
*No detailed plans/designs yet; will engage HUB for input at a later stage |
||
*Need to wait for federal funding as it is going to be costly. |
*Need to wait for federal funding as it is going to be costly. --> |
||
<!--'''E-scooter Pilot (no update)''' |
<!--'''E-scooter Pilot (no update)''' |
||
*Bylaws received final adoption at Council in early March. Pilot runs until April 2024. |
*Bylaws received final adoption at Council in early March. Pilot runs until April 2024. |
||
Line 155: | Line 166: | ||
*** Public consultations for Peters to Dempsey (Phase 2) |
*** Public consultations for Peters to Dempsey (Phase 2) |
||
**Main St Cycling Link |
**Main St Cycling Link |
||
***discussed 2 options A=straight $$$, 5+years, b=weaves around, pinch points=$, next couple years |
|||
***3 Options for crossing main from Barrows |
|||
** Arborlynn connector |
** Arborlynn connector |
||
***West side in 2022 |
***West side in 2022 |
||
**** Design done, Waiting for Metro Van approval to start construction |
**** Design done, Waiting for Metro Van approval to start construction |
||
***East side |
***East side |
||
**** |
**** Consultant working on detailed design fall 2022? build 2023? |
||
** Marine Drive - Bridge to Tatlow |
** Marine Drive - Bridge to Tatlow |
||
*** Consultant to be hired detailed design this fall |
|||
** Kirkstone-Rufus-Brooksbank-SalopTrail |
** Kirkstone-Rufus-Brooksbank-SalopTrail |
||
*** Issues with design of crossing at Kirstone Rd |
|||
* '''Other 2022 Construction plans''': |
* '''Other 2022 Construction plans''': |
||
** Hunter Street Bridge |
** Hunter Street Bridge |
||
*** construction started, complete by Nov/Dec |
*** construction started, complete by Nov/Dec |
||
<!-- |
|||
* '''Spirit Trail, East of Seymour''' planning: |
* '''Spirit Trail, East of Seymour''' planning: |
||
** Initial Concepts & timeline will be shared with this summer |
** Initial Concepts & timeline will be shared with this summer |
||
Line 175: | Line 190: | ||
** DNV will share new Lower Lynn & Brooksbank designs by end of April |
** DNV will share new Lower Lynn & Brooksbank designs by end of April |
||
** Also requested some for Lower cap road, Pemberton heights (23rd to Paisley and McKay) |
** Also requested some for Lower cap road, Pemberton heights (23rd to Paisley and McKay) |
||
--> |
|||
* Safe Streets (was slow streets) - Council workshop on May 16th |
* Safe Streets (was slow streets) - Council workshop on May 16th |
||
** most cashes with serious injuries at collector/arterial intersections. 21 top sites. |
** most cashes with serious injuries at collector/arterial intersections. 21 top sites. |
||
Line 185: | Line 201: | ||
===District of West Vancouver - Paul/Peter/Mike=== |
===District of West Vancouver - Paul/Peter/Mike=== |
||
<!-- |
|||
'''9 March Liaison Meeting on Westmount Road''' |
|||
*Paul and Mike met with DWV Engineering staff on-site to review HUB concerns over proposed improvements planned for a 1.6km stretch of route between Marine Drive and Hwy 1/Westmount Dr Interchange. The stretch includes Westmount Drive, Thompson Cst, Mathers Ave and 31st St. HUB has raised concerns over inconsistent bike lane/shared lane arrangements planned along this steep OCP-designated bike route, as well as urging suitable traffic calming and speed control measures. An application for TransLink funding of the improvements was reportedly rejected on the grounds of low design standard. |
|||
*The current Westmount roadway is a two-lane configuration incorporating traffic calming measures installed at the request of residents concerned at excessive traffic speeds. The proposed improvements were planned some years ago (prior to the publication of the BC Active Transportation Design Guidelines) as part of road reinstatement following the installation of a major storm sewer along this route in 2020 to serve the Five Creeks development area above the Highway. The storm sewer is not yet in service pending delayed completion of its Hwy 1 crossing, and we were informed that a sanitary sewer may also be installed along this route which would require space in the adjoining landscaped boulevard. At that time, it may be possible given an increased width of roadway, to adopt a buffered bike lane consistently throughout for uphill travel. However, the budget allocation for the storm sewer reinstatement is firmly scheduled to be used before end-2022. |
|||
*The currently lightly used Westmount/31st route is not a high priority for HUB although it can be seen as a logical extension towards Horseshoe Bay of the HUB priority Marine-to-Main bike arterial. While HUB would urge DWV to adopt a high standard bike facility along this route when road space can be made available, the present proposals (with several minor changes) could be acceptable as a temporary arrangement in view of the current funding limitation. HUB has not yet been informed of any decision by DWV. |
|||
''' |
'''Go by Bike week Celebration stations''' |
||
*On 31 May, Peter volunteered at the Welch Street and Spirit trail location in North Van and counted a total of 148 riders including 36 on e-bikes (https://wiki.bikehub.ca/sites/northshore/images)/0/04/2022-05-31_Go_by_Bike_Week_tally_sheet_at_Spirit_Trail_and_Welch.pdf). |
|||
*There are 10 new sharrows on the bridge and they are a good size, very visible, properly located near the centre of the traffic lanes and they conform to the BC Active Transportation Design Guide. Unfortunately, they seem to be misunderstood by some as indicating that people on bicycles should ride in the traffic lanes rather than on the new widened path. |
|||
*On 1 June, I think that Mike volunteered on the Spirit Trail at 14th and Argyle in West Vancouver. |
|||
*There are shared pathway signs at each end of the bridge like those in the BC Active Transportation Design Guide, but they are so small that you have to be right up close to them to see the bicycle and pedestrian symbols. The one at the approach to the west end of the bridge has been installed in an appropriate location beside the new widened path, but the one at the approach to the east end of the bridge is nowhere near the new path. |
|||
*The following photo at: https://wiki.bikehub.ca/sites/northshore/index.php?title=File:Welch_St_Bridge_east-end_approach_zoomed_2022-04-01_IMG_3820.jpg shows how difficult it is to see the very small "SHARED PATHWAY" sign at the approach to the east end of the bridge. It is located on the north side of the westbound traffic lane by the pedestrian stairway leading to the RV park. |
|||
*To make it clear to cyclists that they can ride on the new widened path, these "SHARED PATHWAY" signs need to be much larger, with the bicycle and pedestrian symbols being about the same size as those same two symbols on the orange and black sign mounted to the post with the flashing lights at the north side of the raised crossing. It is suggested that an appropriate location for the one at the approach to the east end of the bridge would be on the post with the flashing lights at the south side of the raised crossing. |
|||
'''Deadly hazard at 13th and Bellevue intersection''' |
|||
*A senior was struck by a driver around 1:25 p.m. Wednesday (Jan. 19) in the crosswalk where 13th Street and Bellevue Avenue meet. |
|||
*At the time, police said the driver, a 56-year-old West Vancouver man, was turning his Ford Raptor onto 13th when he struck a 71-year-old North Vancouver woman in the crosswalk who did not survive the crash. |
|||
*This tragic incident and the deadly one at 17th and Bellevue caused Neil Winkelmann to suggest making 14th Street from Marine Drive to the railway tracks a pedestrian zone to prevent rat-running by motorists. |
|||
--> |
|||
'''7 April meeting with the Mayor and TransLink CEO Kevin Quinn''' |
|||
*Peter was invited and is attending this West Van Chamber of Commerce annual meeting with the mayor where transportation will be a major topic discussed. |
|||
<br/> |
|||
'''Park Royal Mico Units''' |
|||
=== MOTI - Don/Jonathan=== |
|||
*On 17 May, Paul and Peter met with Rick Amantea at the Park Royal boardroom for one hour where Rick described the project with a number of slides (https://wiki.bikehub.ca/sites/northshore/images/f/fd/2022-05-17_Park_Royal_micro_units.pdf). |
|||
*'''Lower Lynn Interchanges''' |
|||
** ''Mountain Hwy Interchange'' |
|||
*** Protection for Northbound on Mtn-Hwy at south intersection - MoTI will add spring 2022. |
|||
** ''Keith/MSP interchange'' |
|||
*** MoTI working on solution to blind merge created by the sound barrier at the SW end of the overpass where the Orwell MUP connects. |
|||
*** DNV has put up some new wayfinding signage, but not all. |
|||
** ''Main-Dollarton interchange'' |
|||
*** New access ramps to existing tunnel on north side, completed but path ends with fence at Phibbs |
|||
*** Rating for response from MoTI |
|||
** ''Phibbs Exchange'' |
|||
*** Start delayed until summer |
|||
'''Cypress Village''' |
|||
* '''[https://www2.gov.bc.ca/gov/content/transportation/transportation-reports-and-reference/reports-studies/lower-mainland#northshore Hwy 1 North Shore Corridor Study: Lynn Valley to Horseshoe Bay]''' |
|||
*On 31 May, Peter was invited to the Cypress pop-up village for a one-hour briefing on the 22 Aprril 2022 Draft Area Development Plan for Cypress Village and Eagleridge which was accepted by Council. |
|||
** Don to request what the next steps are. |
|||
*Here is the Cypress Village Cycling Network map: https://wiki.bikehub.ca/sites/northshore/images/a/a7/2022-05-31_Cypress_Villlage_Cycling_Network_map.jpg. |
|||
<!-- |
|||
* '''Lynn Valley & Capilano road Interchanges, Cycling improvement designs''' - |
|||
** have asked to see and share final designs, nothing so far |
|||
--> |
|||
* '''Cycling Gaps project''' |
|||
** Provided comments on draft of MoTI's Gap's list. |
|||
** Next phase will be prioritization, no dates yet. |
|||
'''Making a case for Cycling Highways in Metro Vancouver''' |
|||
* '''Small projects''' - maintenance issues |
|||
*Here is a copy of the highlights from the lengthy report: https://wiki.bikehub.ca/sites/northshore/images/d/df/2022-06-01_Making_a_case_for_cycle_highways_in_Metro_Vancouver_cycle_hub_4pp_rgb_pdf.pdf. |
|||
** Don to follow up this month |
|||
*Mike has suggested to circulate this to the DWV Engineering staff and perhaps we could also include the mayor and councillors. |
|||
<!-- |
|||
** Meet with MoTI's Operations Mgr Oct 14th |
|||
'''Rotary Ride for Rescue on 11 June''' |
|||
** Phillips ave Tunnel barriers - looking to make changes, but best option will require DNV and local resident buy in. |
|||
*Shall we put this following article up on the HUB-NS listserve: https://wiki.bikehub.ca/sites/northshore/images/6/61/Rotary_Ride_for_Rescue_on_11_June_2022.jpg |
|||
** Will consider Repairs to Paths between Cap bridg , North interchange and Phillips tunnel in 2022 |
|||
** Cypress Bowl Road - MoTI are gathering information. We and others have suggested reallocation of 1 uphill lane during non-ski season. |
|||
'''Welch Street Bridge''' |
|||
** HSB & Exit 0 |
|||
*Closed to automobiles till August but MUP remains open |
|||
--> |
|||
*Better share-the-path signage is needed to encourage cyclists to ride on the MUP rather than the automobile traffic lanes. |
|||
<br/> |
|||
===Communications & Outreach - Antje/Paul/Heather=== |
===Communications & Outreach - Antje/Paul/Heather=== |
||
Line 264: | Line 249: | ||
===Schools - Paul Janzen=== |
===Schools - Paul Janzen=== |
||
* no updates from last month; however, it’s worth repeating the last item from May: |
|||
*April 27 webinar on Active School travel: |
|||
**Hosted by Kulvir Mann. |
|||
**Outlined the process for closing streets around the school to promote AT. "School Streets" program. |
|||
**Rose Gardner with HUB outlined our education programs for those unaware. |
|||
**Alyshia Burak (formerly HUB) outlined City of Van trial "School Streets" from 2021. |
|||
**Faye Willickfrom DASH BC outlined their efforts to promote AT in BC. |
|||
*Update from HUB HQ on North Shore school involvement: |
|||
**CNV funds all schools. |
|||
**DNV funding 7 schools in 2022 up from 4 in 2021, 0 in 2020. |
|||
**West Van funds 0/nada/zilch/nuttin schools for bike ed. Do they have someone from the municipality that works on this issue? |
|||
**Does anyone have a connection with one or more of the following schools - Eastview, Capilano, Ross road, Carisbrooke and .or Westview elementary? We have $ for their program. |
**Does anyone have a connection with one or more of the following schools - Eastview, Capilano, Ross road, Carisbrooke and .or Westview elementary? We have $ for their program. |
||
<br/> |
<br/> |
Latest revision as of 02:54, 3 June 2022
HUB North Shore Committee regular meetings are held on the first Thursday of every month at 6:30pm - 8:30pm. Everybody is welcome.
In-person at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).
Or Online, Zoom conference call: https://us06web.zoom.us/j/81789523337?pwd=ZitLVHVoRmpQVFh3YjdpWi8wNVNTQT09 NOTE: this is a new zoom link
By phone: call 778-907-2071, Meeting ID: 81789523337, Passcode: 354518
One tap mobile: +17789072071,,81789523337#,,,,*354518#
General
- Agenda additions
- Introductions
- set up meeting with MLAs - Don
Public Input/Consultations
- Public input is critical when Council and Staff make trade-offs and decisions. Please make sure your voice is heard!!
- Stanley Park Mobility Survey
- Survey is open until June 1st (~? mins, ? pages with mostly multiple choice)
- Stanley Park, especially the causeway provides a key connection between North Shore and the rest of Vancouver
- Some things you may want to comment on:
- TBD
- Survey is open until June 1st (~? mins, ? pages with mostly multiple choice)
- Upper Lynn Valley Road, Phase 2
- Lynn Valley Road from Peters Rd to Dempsey (End-of-line Cafe)
- Survey is open until June 6th (~10 mins, 4 pages with mostly multiple choice)
- Open House: Thursday, May 26, 3:30pm - 7:30pm, Karen Magnussen Community Recreation Centre, Eagle Room
- Some things you may want to comment on:
- To achieve the District's goals of increase use of Active transportation in this corridor, the route must provide a safe and desirable option for people to get to their destination (shop, school, work, recreation)
- Prioritize safety and options for active transportation over storage of private vehicles
- The Shipyards Strategy
- Survey is now open until August 31st 4pm (it’s quick ~ 5 minutes. 1 open ended, rest are multiple choice/checkboxes).
- ‘What could we do better?’. A few cycling related responses:
- More bike parking
- Better/clearer bike routes (wayfinding signage with destinations, pavement markings)
- Separation of walking & cycling
- Slower car speeds in the surrounding areas
- Bike valet at events
Goals & Objectives
- 2022
- Implementation of 3 top priority Bikeways
- Establish communications with community stakeholders re Bikeways.
- Recruit more committee members
- Poster/Display for Bike Stores, Libraries, ...
- To connect with "Interested but concerned" cyclists
- Poster to catch attention and give overview (~8.5x11)
- with tray for Cycle Maps and new "Join HUB North Shore" business cards.
Events
- Outdoor Safety and Emergency Preparedness - May 7th, 11-2pm, Argyle
- Don, Duncan and Anthony talked to lots of people and ran out of maps
- Go By Bike Week - May 30 - June 3, 2022
- Wed, May 31 8-10am, W 1st and Welch (DNV)
- Dana, Peter
- Wed, June 1 8-10am, Lions Gate Hospital in North Van (Coastal Health?)
- Paul J, Don
- Wed, June 1 12-2pm, Shipyards District in North Van (CNV)
- Don, Erika, Anthony
- Wed, June 1 4-6pm, 13th and Argyle in West Van (DWV)
- Paul S, Mike
- Wed, May 31 8-10am, W 1st and Welch (DNV)
City of North Vancouver - Nadia
CNV Key Contacts & Staff Meetings
- HUB’s primary contact: Brandon Green
- Next meeting with staff: TBD (likely late summer)
Upper Levels Greenway
- Submitted a letter to express our comments: File:CNV UpperLevelsGreenway 052422.pdf
Summary of current/upcoming CNV projects - this year & beyond
- Esplanade Complete Street (construction underway, estimated completion: Summer 2022)
- Upper Levels Greenway (final design/route selection expected: Fall 2022)
- Mobility Strategy (implementation of some strategies to commence this year, e.g. zoning bylaw updates re new developments and bike storage)
- Carson Graham School - AT improvements (some sidewalk gaps to be addressed this year, most changes part of next year's budget)
- Kings Mill (detailed park design underway, construction to begin: Spring 2023)
- Cotton/Main St bridge (preliminary designs underway, construction is dependent on funding)
- Casano-Loutet Overpass (construction anticipated in 2023)
- Forbes & 3rd (long term, 2+ years away)
E-Bike Share
- Lime is working to add helmets to all bikes in the fleet. This will continue to occur as they receive parts/helmets to retrofit the fleet. Expect to see the percentage of bikes with helmets increase over the summer.
- Working on getting ridership data publicly available
ITC - Dana & Jonathan
- May meeting postponed to end of month (no updates)
District of North Vancouver - Fred/Don
- Meeting with Staff - today, June 2.
- Upper Lynn Valley Rd
- Council approved building Mtn. Hwy to Peters Road (Phase 1) this summer
- Public consultations for Peters to Dempsey (Phase 2)
- Main St Cycling Link
- discussed 2 options A=straight $$$, 5+years, b=weaves around, pinch points=$, next couple years
- 3 Options for crossing main from Barrows
- Arborlynn connector
- West side in 2022
- Design done, Waiting for Metro Van approval to start construction
- East side
- Consultant working on detailed design fall 2022? build 2023?
- West side in 2022
- Marine Drive - Bridge to Tatlow
- Consultant to be hired detailed design this fall
- Kirkstone-Rufus-Brooksbank-SalopTrail
- Issues with design of crossing at Kirstone Rd
- Upper Lynn Valley Rd
- Other 2022 Construction plans:
- Hunter Street Bridge
- construction started, complete by Nov/Dec
- Hunter Street Bridge
- Safe Streets (was slow streets) - Council workshop on May 16th
- most cashes with serious injuries at collector/arterial intersections. 21 top sites.
- Propose to focus will on 5 high crash areas that do not currently have improvements underway or planned.
- Repaving Riverside Drive - asked for design and if bikelanes included.
District of West Vancouver - Paul/Peter/Mike
Go by Bike week Celebration stations
- On 31 May, Peter volunteered at the Welch Street and Spirit trail location in North Van and counted a total of 148 riders including 36 on e-bikes (https://wiki.bikehub.ca/sites/northshore/images)/0/04/2022-05-31_Go_by_Bike_Week_tally_sheet_at_Spirit_Trail_and_Welch.pdf).
- On 1 June, I think that Mike volunteered on the Spirit Trail at 14th and Argyle in West Vancouver.
Park Royal Mico Units
- On 17 May, Paul and Peter met with Rick Amantea at the Park Royal boardroom for one hour where Rick described the project with a number of slides (https://wiki.bikehub.ca/sites/northshore/images/f/fd/2022-05-17_Park_Royal_micro_units.pdf).
Cypress Village
- On 31 May, Peter was invited to the Cypress pop-up village for a one-hour briefing on the 22 Aprril 2022 Draft Area Development Plan for Cypress Village and Eagleridge which was accepted by Council.
- Here is the Cypress Village Cycling Network map: https://wiki.bikehub.ca/sites/northshore/images/a/a7/2022-05-31_Cypress_Villlage_Cycling_Network_map.jpg.
Making a case for Cycling Highways in Metro Vancouver
- Here is a copy of the highlights from the lengthy report: https://wiki.bikehub.ca/sites/northshore/images/d/df/2022-06-01_Making_a_case_for_cycle_highways_in_Metro_Vancouver_cycle_hub_4pp_rgb_pdf.pdf.
- Mike has suggested to circulate this to the DWV Engineering staff and perhaps we could also include the mayor and councillors.
Rotary Ride for Rescue on 11 June
- Shall we put this following article up on the HUB-NS listserve: https://wiki.bikehub.ca/sites/northshore/images/6/61/Rotary_Ride_for_Rescue_on_11_June_2022.jpg
Welch Street Bridge
- Closed to automobiles till August but MUP remains open
- Better share-the-path signage is needed to encourage cyclists to ride on the MUP rather than the automobile traffic lanes.
Communications & Outreach - Antje/Paul/Heather
- let us know if there is something we should communicate about - blocked bike lanes, new infrastructure, etc.
- Twitter
- Account now run by Antje and Rueben
- Rueben is documenting Esplanade construction and has created a list of other locations for regular posting of infrastructure on Twitter
Schools - Paul Janzen
- no updates from last month; however, it’s worth repeating the last item from May:
- Does anyone have a connection with one or more of the following schools - Eastview, Capilano, Ross road, Carisbrooke and .or Westview elementary? We have $ for their program.
RCMP -
- Ask them about slow streets?