Meeting Summary: September 10, 2015: Difference between revisions
Jump to navigation
Jump to search
imported>Peter Scholefield No edit summary |
imported>Peter Scholefield No edit summary |
||
Line 1: | Line 1: | ||
# Attendance: Tony (chair), Peter, Dennis, Heather, Don Piercy |
# Attendance: Tony (chair), Peter, Dennis, Heather, Don Piercy |
||
# Minutes Review |
# Minutes Review |
||
#* no comments |
|||
# Car Free Day Follow up |
# Car Free Day Follow up |
||
#* |
#* Heather showed the survey responses and results from 16 people and said we got 3 names for the Yahoo group and two joined HUB. |
||
#* |
#* Dots were put on new laminated maps at locations from the survey. |
||
#* will post survey results and map with dots on the wiki |
#* Heather will post survey results and map with dots on the wiki |
||
# |
# Ironworker's Memorial Bridge ramps safety improvements - response from Jay Porter |
||
#* From Jay Porter on 4 September: "A temporary bike fence was installed at the south west end of the bridge. Fabrication of the new fence is taking longer than expected but a new longer bike fence will be installed at that location in 2 weeks. The bike fence for Dollarton and Main sidewalks are also being fabrication and will be installed later this month. The improvements planned at the south east end of the bridge was on hold until the west sidewalk opened because the work will require closure of the east sidewalk for 1-2 days, the pole relocation should occur in 1-2 weeks with the levelling and repaving to follow soon after. Lastly the paint bars with “slow down” will be installed at 3 of 4 bridge exits next week weather permitting, the 4th is the south east side which will be installed once the improvement works are completed there" |
#* From Jay Porter on 4 September: "A temporary bike fence was installed at the south west end of the bridge. Fabrication of the new fence is taking longer than expected but a new longer bike fence will be installed at that location in 2 weeks. The bike fence for Dollarton and Main sidewalks are also being fabrication and will be installed later this month. The improvements planned at the south east end of the bridge was on hold until the west sidewalk opened because the work will require closure of the east sidewalk for 1-2 days, the pole relocation should occur in 1-2 weeks with the levelling and repaving to follow soon after. Lastly the paint bars with “slow down” will be installed at 3 of 4 bridge exits next week weather permitting, the 4th is the south east side which will be installed once the improvement works are completed there" |
||
#* need to improve |
#* need to improve connections at each end of the bridge |
||
# BTWW Organization |
# BTWW Organization |
||
#* Oct 27 1600-1800 at north end of the |
#* A North Shore HUB committee BTWW station will be set up on Oct 27 1600-1800 at north end of the Ironworker's Memorial Bridge. |
||
#* We will need get sponsors and a bike repair facility for the event. |
|||
# HUB-NS outreach package review |
# HUB-NS outreach package review |
||
#* we like it and put it on the wiki |
|||
#* We like what Dennis produced and decide that it should be put it on the wiki. |
|||
#* |
#* It was also suggested to get a double sided laminated copy for events. |
||
# Municipality Engagement Strategies (CNV, DNV, DWV - Rides & Keith Road?) |
# Municipality Engagement Strategies (CNV, DNV, DWV - Rides & Keith Road?) |
||
#* 3-4 people monitoring each |
#* Tony suggested 3-4 people monitoring cycling issues in each of the three municipality including monitoring council meetings |
||
#* |
#* Tony is arranging to meet the City of north van mayor and Doug Pope from Tranportation department |
||
#* |
#* Peter to try to get John Calimente to come to October meeting. |
||
#* working with Antje to get delegation to the city |
#* Tony is working with Antje to get a delegation presentation to the city |
||
# Plans for a group assessment ride along the Spirit Trail |
# Plans for a group assessment ride along the Spirit Trail |
||
#* doodle poll to get a date |
#* Peter will initiate a doodle poll to get a date for a ride from 13th Street in Ambleside to Bewicke starting at 5:30 pm. |
||
# Coho Festival September 13th from 11 a.m. - 6 p.m. at Ambleside Park, West Vancouver (Peter 5 min) |
# Coho Festival September 13th from 11 a.m. - 6 p.m. at Ambleside Park, West Vancouver (Peter 5 min) |
||
# Licence plate covers |
# Licence plate covers |
||
#* A design was displayed and there was a suggestion about the size and location of the HUB logo. |
|||
#* have a design but no pricing yet |
|||
#* |
#* Tony will work with HUB HQ re financing |
||
#* |
#* Wehn finalized it was suggested to put it onto the HUB website. |
||
# |
# Bike theft workshop on 16 September |
||
#* Tony will post details to Yahoo list. |
|||
# Next meeting is planned for 8 October |
# Next meeting is planned for 8 October |
Revision as of 21:49, 14 September 2015
- Attendance: Tony (chair), Peter, Dennis, Heather, Don Piercy
- Minutes Review
- no comments
- Car Free Day Follow up
- Heather showed the survey responses and results from 16 people and said we got 3 names for the Yahoo group and two joined HUB.
- Dots were put on new laminated maps at locations from the survey.
- Heather will post survey results and map with dots on the wiki
- Ironworker's Memorial Bridge ramps safety improvements - response from Jay Porter
- From Jay Porter on 4 September: "A temporary bike fence was installed at the south west end of the bridge. Fabrication of the new fence is taking longer than expected but a new longer bike fence will be installed at that location in 2 weeks. The bike fence for Dollarton and Main sidewalks are also being fabrication and will be installed later this month. The improvements planned at the south east end of the bridge was on hold until the west sidewalk opened because the work will require closure of the east sidewalk for 1-2 days, the pole relocation should occur in 1-2 weeks with the levelling and repaving to follow soon after. Lastly the paint bars with “slow down” will be installed at 3 of 4 bridge exits next week weather permitting, the 4th is the south east side which will be installed once the improvement works are completed there"
- need to improve connections at each end of the bridge
- BTWW Organization
- A North Shore HUB committee BTWW station will be set up on Oct 27 1600-1800 at north end of the Ironworker's Memorial Bridge.
- We will need get sponsors and a bike repair facility for the event.
- HUB-NS outreach package review
- We like what Dennis produced and decide that it should be put it on the wiki.
- It was also suggested to get a double sided laminated copy for events.
- Municipality Engagement Strategies (CNV, DNV, DWV - Rides & Keith Road?)
- Tony suggested 3-4 people monitoring cycling issues in each of the three municipality including monitoring council meetings
- Tony is arranging to meet the City of north van mayor and Doug Pope from Tranportation department
- Peter to try to get John Calimente to come to October meeting.
- Tony is working with Antje to get a delegation presentation to the city
- Plans for a group assessment ride along the Spirit Trail
- Peter will initiate a doodle poll to get a date for a ride from 13th Street in Ambleside to Bewicke starting at 5:30 pm.
- Coho Festival September 13th from 11 a.m. - 6 p.m. at Ambleside Park, West Vancouver (Peter 5 min)
- Licence plate covers
- A design was displayed and there was a suggestion about the size and location of the HUB logo.
- Tony will work with HUB HQ re financing
- Wehn finalized it was suggested to put it onto the HUB website.
- Bike theft workshop on 16 September
- Tony will post details to Yahoo list.
- Next meeting is planned for 8 October