HUB Delta Great Blue Heron Way sub-committee: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 13: | Line 13: | ||
Funded bike infrastructure (The boardwalk connect to breakwater was officially opened Sept 23, 2016) |
Funded bike infrastructure (The boardwalk connect to breakwater was officially opened Sept 23, 2016) |
||
[[2015TRAN0114-001481_MoTI_funds_for_TFN_cycle_path.pdf]] |
[[File:2015TRAN0114-001481_MoTI_funds_for_TFN_cycle_path.pdf]] |
Revision as of 23:35, 5 February 2019
Vision document
File:April 2015 GBHW Summary.pdf
Railway barrier
File:24 Oct 2018 Overcoming the railroad tracks at Deltaport TrailsBC.pdf
File:City of Delta Deltaport Way 27B Avenue Pedestrian Overpass.pdf
Funded bike infrastructure (The boardwalk connect to breakwater was officially opened Sept 23, 2016)