HUB Delta Great Blue Heron Way sub-committee: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
[[File:April_2015_GBHW_Summary.pdf]] |
[[File:April_2015_GBHW_Summary.pdf]] |
||
Railway barrier |
Railway barrier |
||
Line 8: | Line 9: | ||
[[File:City_of_Delta_Deltaport_Way_27B_Avenue_Pedestrian_Overpass.pdf]] |
[[File:City_of_Delta_Deltaport_Way_27B_Avenue_Pedestrian_Overpass.pdf]] |
||
Funded bike infrastructure (The boardwalk connect to breakwater was officially opened Sept 23, 2016) |
|||
[[2015TRAN0114-001481_MoTI_funds_for_TFN_cycle_path.pdf]] |
Revision as of 23:35, 5 February 2019
Vision document
File:April 2015 GBHW Summary.pdf
Railway barrier
File:24 Oct 2018 Overcoming the railroad tracks at Deltaport TrailsBC.pdf
File:City of Delta Deltaport Way 27B Avenue Pedestrian Overpass.pdf
Funded bike infrastructure (The boardwalk connect to breakwater was officially opened Sept 23, 2016)