Meeting Summary: Aug 10, 2017: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
No edit summary
imported>Peter Scholefield
No edit summary
Line 1: Line 1:
*Introductions: Antje, Dianne, Nelson, Nick Jones, Martyn, Fred, Fiona, Peter T, Erika, Don P, Peter S, Tony (chair), Giacomo
*Introductions: Keith (from near Deep Cove), Rob, Fred, Tony chair), Peter S, Giacomo, Erika, Paul
*Events - Only three people available for the Coho Fest so we will not participate.thshore/images/5/5f/2017_Events_overview.docx
*Agenda Additions
**Recap: West Van Bike to Shop Days 22 July
*Review of prior meeting minutes
***Paul, Peter, Martyn and Jeff Leigh led 28 (44 had signed up on the website) cyclists (in two groups) from Hornby and West Hasting through the Stanley Park causeway to Ambleside and Dundarave.

*Events - volunteers needed! http://wiki.bikehub.ca/northshore/images/5/5f/2017_Events_overview.docx
**Recap: West Van Bike to Shop Days 22 July (Peter)


'''City of North Vancouver'''
'''City of North Vancouver'''
Line 27: Line 25:
*Eagle Harbour Dropoff Area
*Eagle Harbour Dropoff Area
*Six sets of chicanes on Kings Ave bike route: http://wiki.bikehub.ca/northshore/images/9/97/Kings_Ave_mid-block_chicane_looking_east_2017-06-27_IMG_1595.JPG (REMOVED)
*Six sets of chicanes on Kings Ave bike route: http://wiki.bikehub.ca/northshore/images/9/97/Kings_Ave_mid-block_chicane_looking_east_2017-06-27_IMG_1595.JPG (REMOVED)


RKeith, ob, Fred, Tony, Peter,Giacomo, Erika,Paul

Events:

CNV: Mosquito Creek: Doug Pope tenders out construction in the fall

13th bike lane repainted – Tony to follwo up on 13th west to Lonsdale
2nd street in Moodyvillel we sent a letter park – lets ask if ther are plans for cycling - tony will send an email to dragana to find out what will cyclist do during constructio.

Keith rd section of bike lane and 21st Green Necklace under construction – Tony will enquire

DNV

East Keith Rd. Accident – ghost bike idea - a separate organization – perhps Martin and Erika
Rob suggest sharrow in mid lane on all downhill bike routes
Erika says a bike lane is being put in on Brooksbank
pilot bike lane on Highland blvd Ingrid contacted us
Lynee Valley Rd update- underpass construction under way
Erika concerned about a development block bike lane at Larson and Bewicke

Letters

1. Spirit trai baffles at Pemberton and Welch – need a video of a family with a bike trailer
2. Maplewood – Will Sherman started a letter whihc Tony displayed in slides – Tony met with him -we should turn this into a letter
DWV

Paul -

Tony path on Mathers near Mchenie Park could be improved for bikes

Revision as of 21:26, 23 August 2017

  • Introductions: Keith (from near Deep Cove), Rob, Fred, Tony chair), Peter S, Giacomo, Erika, Paul
  • Events - Only three people available for the Coho Fest so we will not participate.thshore/images/5/5f/2017_Events_overview.docx
    • Recap: West Van Bike to Shop Days 22 July
      • Paul, Peter, Martyn and Jeff Leigh led 28 (44 had signed up on the website) cyclists (in two groups) from Hornby and West Hasting through the Stanley Park causeway to Ambleside and Dundarave.

City of North Vancouver

  • Spirit Trail through Squamish Nation / Mosquito Creek
  • 2nd Street - Developments and bike space follow up
  • 13th East of Lonsdale protected bike lane repainted
  • Ministry of Transportation and Infrastructure
  • Lower Lynn Interchanges project update

District of North Vancouver

  • Reflection on East Keith Road
  • Pilot Bike lane on Highland Blvd
  • Lynn Valley Road - Follow Up
  • Series of Letters:
    • 1. Spirit trail / MUP designs (baffle at Pemberton/Spirit Trail, bollards and shared crossings. We can start with the DNV and perhaps later send similar letters to CNV and DWV)
    • 2. Proposed new DNV Policy - new construction = new infrastructure (Examples: Rec Centre Queens and Deep cove / Dollarton 90 units / Pemberton Ave repaving)
    • 3. Maplewood Issues - fix it


District of West Vancouver


RKeith, ob, Fred, Tony, Peter,Giacomo, Erika,Paul

Events:

CNV: Mosquito Creek: Doug Pope tenders out construction in the fall

13th bike lane repainted – Tony to follwo up on 13th west to Lonsdale 2nd street in Moodyvillel we sent a letter park – lets ask if ther are plans for cycling - tony will send an email to dragana to find out what will cyclist do during constructio.

Keith rd section of bike lane and 21st Green Necklace under construction – Tony will enquire

DNV

East Keith Rd. Accident – ghost bike idea - a separate organization – perhps Martin and Erika Rob suggest sharrow in mid lane on all downhill bike routes Erika says a bike lane is being put in on Brooksbank pilot bike lane on Highland blvd Ingrid contacted us Lynee Valley Rd update- underpass construction under way Erika concerned about a development block bike lane at Larson and Bewicke

Letters

1. Spirit trai baffles at Pemberton and Welch – need a video of a family with a bike trailer 2. Maplewood – Will Sherman started a letter whihc Tony displayed in slides – Tony met with him -we should turn this into a letter DWV

Paul -

Tony path on Mathers near Mchenie Park could be improved for bikes