November 2023

From committees
Revision as of 22:13, 11 November 2023 by HUBCyclingTriCities (talk | contribs) (Created page with "==In attendance== Andrew, Dragana, Colin, Leon, Vince, Cathy (HUB Central), David (Port Coquitlam) ==Report of the Co-Chair (Andrew)== *Construction on the St. John's St MUP...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

In attendance

Andrew, Dragana, Colin, Leon, Vince, Cathy (HUB Central), David (Port Coquitlam)

Report of the Co-Chair (Andrew)

  • Construction on the St. John's St MUP is well underway. The entire south sidewalk between Albert St at Moody St has been removed in anticipation of construction. This has hindered access to bus stops.
  • Action item: Andrew to confirm Moody St connection to the overpass is within the project scope

Report of the Co-Chair (Colin)

  • Nothing new. Disappointing delays of Guildford Greenway project.


Other Items

  1. Noted Aaron Dixon has left the City of Coquitlam for a job with TransLink. Payvand will serve as our contact in the interim until a replacement for Aaron is hired.
  2. Dragana suggests Nelson St could be added as a new gap following completion of some existing HUB gaps in the near future.
  3. Cathy notes HUB Central will be hosting a meeting on effective community advocacy. Workshop likely to take place January 15.