Difference between revisions of "Meeting Summary: September 5, 2013"

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
imported>Peter Scholefield
Line 1: Line 1:
# Attendance: Antje, Peter, Fiona, Nelson, Dianne, Trent, Helen,
+
# Attendance: Antje, Peter, Fiona, Nelson, Dianne, Trent, Helen, and special guest Norm Wong, transportation engineer with the District of West Van
# Review of agenda, additional agenda items
 
 
# Monthly meeting location & time in 2014
 
# Monthly meeting location & time in 2014
 
#* start at 1830 on Thursday
 
#* start at 1830 on Thursday
#* lets look at possible options - Fiona will check in the city of NV
+
#* lets look at possible options - Fiona will check with the city of NV
 
# Roll and Stroll Bike/Walk Festival Edgmont Village October 5 (Mary Ellen, Erin, by email)
 
# Roll and Stroll Bike/Walk Festival Edgmont Village October 5 (Mary Ellen, Erin, by email)
 
#* We will be participating in this event on Saturday Oct 5th. The event runs 10-2pm.
 
#* We will be participating in this event on Saturday Oct 5th. The event runs 10-2pm.
Line 10: Line 9:
 
#* Send an email to Co-Event Coordinators Mary Ellen and Erin if you can help out on Oct 5th.
 
#* Send an email to Co-Event Coordinators Mary Ellen and Erin if you can help out on Oct 5th.
 
# Create "low hanging fruit" list for North Shore municipalities (Antje)
 
# Create "low hanging fruit" list for North Shore municipalities (Antje)
#* Danial Watson asked for one e.g curb drops - Annie Kim from DNV also interested - Trent will try to find a list - West Van Cyling plan technical committee made a list
+
#* Daniel Watson asked for one e.g curb drops
  +
#* Annie Kim from DNV is also interested
# get a list by next meeting on 3 October- antje will send out a link
 
  +
#* Trent will try to find a list from his time with JBAC
  +
#* Peter will review notes from the West Van Cycling Plan Technical Committee which had made a list
  +
#* Hope to get started on a list in time for the next meeting on 3 October
  +
#* Antje will send out a link
 
#* Inexpensive improvements such as paint, signage, curb drops
 
#* Inexpensive improvements such as paint, signage, curb drops
 
# Develop report card for North Shore municipalities (Antje)
 
# Develop report card for North Shore municipalities (Antje)
#* get finnacial expenditure data from each municipality
+
#* Antje attempted to get financial expenditure data on cycling infrastructure from each municipality which would be one possible component to include in a report card
  +
# Discussion with Norm Wong
# Keith Road, West Vancouver, upgrade (Peter)
+
#*Keith Road, West Vancouver, upgrade (Peter)
 
# Low Level Road cycling closure (Heather or Antje)
 
# Low Level Road cycling closure (Heather or Antje)
 
#* see Heather's email- off 3rd Street hill - they won't put signage, Port is difficult to work with
 
#* see Heather's email- off 3rd Street hill - they won't put signage, Port is difficult to work with

Revision as of 18:40, 6 September 2013

  1. Attendance: Antje, Peter, Fiona, Nelson, Dianne, Trent, Helen, and special guest Norm Wong, transportation engineer with the District of West Van
  2. Monthly meeting location & time in 2014
    • start at 1830 on Thursday
    • lets look at possible options - Fiona will check with the city of NV
  3. Roll and Stroll Bike/Walk Festival Edgmont Village October 5 (Mary Ellen, Erin, by email)
    • We will be participating in this event on Saturday Oct 5th. The event runs 10-2pm.
    • It is a family event with 1000-1500 people expected. HUB will be getting some sort of stamp as participants will have an event passport.
    • We will need some volunteers for the booth. Erin and most likely Mary Ellen will be volunteering, but they'd like a few more people. We can discuss shifts if people can't do the whole shift.
    • Send an email to Co-Event Coordinators Mary Ellen and Erin if you can help out on Oct 5th.
  4. Create "low hanging fruit" list for North Shore municipalities (Antje)
    • Daniel Watson asked for one e.g curb drops
    • Annie Kim from DNV is also interested
    • Trent will try to find a list from his time with JBAC
    • Peter will review notes from the West Van Cycling Plan Technical Committee which had made a list
    • Hope to get started on a list in time for the next meeting on 3 October
    • Antje will send out a link
    • Inexpensive improvements such as paint, signage, curb drops
  5. Develop report card for North Shore municipalities (Antje)
    • Antje attempted to get financial expenditure data on cycling infrastructure from each municipality which would be one possible component to include in a report card
  6. Discussion with Norm Wong
    • Keith Road, West Vancouver, upgrade (Peter)
  7. Low Level Road cycling closure (Heather or Antje)
    • see Heather's email- off 3rd Street hill - they won't put signage, Port is difficult to work with
  8. Meeting with North Van-Seymour MLA Jane Thornthwaite in July (Nelson, Antje)

Norm Wong

  1. DWV working with travelsmart to encourge walking tranist and cycling

fair at community centre 26 sep and sat 28 HUB NS

  1. keith road evelyn project to just east of 11th 4.3 lanes with sharrows will continue west to 11th

clyde-keith traffic calming project - open house on 6 June next open house on 10 Oct

  1. no speed bumps since 1988

bike implementation plan to be completed by 1 Oct

  1. connection two bridges over cap river
  2. Spirit trial west 3 zones wants input on exit zero and switchback to Chatham beside stairs
  3. long range plan for Spirit Trail but need cooperation of CN Rail
  4. repaving Marine Drive west of 21st Street

Fiona - emergency managment - went to Victoria for an exercise 40 cylists volunteered -cyclist transported items like bottles of water and 2 eggs - took 2 hours St John's Ambulance was there

    • could do a course in NV perhaps next summer - Saturday morning 0900-1200 NS emergency management