*Introductions: Tony (chair), Peter, Don P, Fred, Erika, Fiona, Antje, Dianne, Martyn, Paul, Kevin, Amelia, Giacomo and invited guests from the DNV: Cormac Linehan, Justin Pedley and Nick
+
*Introductions: Tony (chair), Peter S, Don P, Fred, Erika, Fiona, Antje, Dianne, Martyn, Paul, Kevin, Amelia, Giacomo and invited guests from the DNV: Cormac Linehan, Justin Pedley and Nick (design engineer)
 
 
 
*Lynn Valley Road Underpass Project Presentation
 
*Lynn Valley Road Underpass Project Presentation
**Cormac, the Project Manager for the Lynn Valley Road Underpass Project, led the presentation with detailed charts projected onto a screen.
+
** Cormac, the Project Manager for the Lynn Valley Road Underpass Project, led the presentation with detailed charts projected onto a screen.
 
** The project is being jointly planned by DNV, CNV and MoTI and Donna Howes, a transportation consultant, is involved.
 
** The project is being jointly planned by DNV, CNV and MoTI and Donna Howes, a transportation consultant, is involved.
 
** The project plan begins from the end of the southbound separated bike lane on Lynn Valley Road, that runs between Mollie Nye Way and Morgan Road.
 
** The project plan begins from the end of the southbound separated bike lane on Lynn Valley Road, that runs between Mollie Nye Way and Morgan Road.
Line 11: Line 11:
 
** It was also suggested that cyclist-activated flashing lights be considered like the ones on the Stanley Park Causeway bike path.
 
** It was also suggested that cyclist-activated flashing lights be considered like the ones on the Stanley Park Causeway bike path.
 
** We wonder if the the traffic signal at 21st St would be pedestrian activated. They will find out.
 
** We wonder if the the traffic signal at 21st St would be pedestrian activated. They will find out.
** There is a lightly used bus stop at Sutherland and the bus shelter could be a problem for cyclists.
+
** There is a lightly used bus stop at Sutherland and the bus shelter could be a visibility problem for cyclists approaching the intersection.
** They will look into the possibility of adding a green painted bike lane and suggested a letter with our suggestion to the DNV and CNV by 30 January would be helpful.
+
** They will look into the possibility of adding a green painted bike lane and suggested a letter with our suggestions to the DNV and CNV by 30 January would be helpful.
 
** it is planned to start construction in May/June and it will take 4-6 months to complete.
 
** it is planned to start construction in May/June and it will take 4-6 months to complete.
 
*Review of prior meeting minutes
 
*Review of prior meeting minutes
 
** Tony's presentation to the DNV on 21 November was viewed online and discussed and several suggestions for letters have been subsequently written.
 
** Tony's presentation to the DNV on 21 November was viewed online and discussed and several suggestions for letters have been subsequently written.
* Sunrise Bike Ride next steps
+
* Sunrise Bike Ride next steps (Not discussed at this meeting)
 
* UnGapTheMap Workshop
 
* UnGapTheMap Workshop
 
** Peter and/or Fiona may be available to represent HUB-NS. It will depend on the date which is being determined by a Doodle Poll.
 
** Peter and/or Fiona may be available to represent HUB-NS. It will depend on the date which is being determined by a Doodle Poll.
 
** Antje got a call about our input to the map.
 
** Antje got a call about our input to the map.
 
* SLOW DOWN NORTH SHORE public forum Jan 26, 6:30pm
 
* SLOW DOWN NORTH SHORE public forum Jan 26, 6:30pm
** Tony will be on the panel and others are encourage to attend.
+
** Tony will be on the panel and others are encouraged to attend.
 
*City of North Vancouver Update
 
*City of North Vancouver Update
 
** Jones to Grand Boulevard letter has been sent.
 
** Jones to Grand Boulevard letter has been sent.
** Despite the request, it was decided not to submit a letter of support for the Green Necklace section from Jones to Lonsdale rather indicate that we do not consider it cycling infrastructure that we can support because it is only 3m wide. Nonetheless, we are not against the project.
+
** Despite the request, it was decided not to submit a letter of support for this section of the Green Necklace from Jones to Lonsdale rather let them know that we do not consider it cycling infrastructure that we can support because it is only 3m wide. Nonetheless, we should let them know that we are not against the project.
 
** West Keith/13th St. letter has been sent.
 
** West Keith/13th St. letter has been sent.
 
*District of North Vancouver Update
 
*District of North Vancouver Update
**Letters have been prepared re:Maplewood; Low Hanging Fruit projects; and the Financial Plan 2017-2021
+
** Letters have been prepared re:Maplewood; Low Hanging Fruit projects; and the Financial Plan 2017-2021.
  +
** There is another plan for the Lynn Creek town centre development which involves a pedestrian bridge across a creek which will be part of the Spirit Trail. Antje got an email from a community planner inviting her to meet to discuss plans.
 
*West Vancouver Update
 
*West Vancouver Update
** It is planned that Heather Johnston and Neil Winklemann will meet with District engineering staff on 30 January to discuss the status of the plans to extend the Spirit Trail down into Horseshoe Bay Village from Exit 0 and the traffic calming project around Eagle Harbour School.
+
** It is planned that Heather Johnston and Neil Winkelmann will meet with District engineering staff on 30 January to discuss the status of the plans to extend the Spirit Trail down into Horseshoe Bay Village from Exit 0 and the traffic calming project around Eagle Harbour School. Heather sent an email report for us to consider at the meeting and would like some feedback.
  +
** They may also discuss possible ways to improve safety for cyclists on Marine Drive through all of West Van, which is the busiest cycling route on the North Shore.
** Concern was expressed that they intend to represent HUB-NS but there has been no opportunity for us to share our views on the projects, so Tony will try to arrange for a few of us to meet with them before the 30th.
+
** Concern was expressed that they intend to represent HUB-NS but there has been no opportunity for us to share and discuss our views on the projects, so Tony will try to arrange for a few of us to meet with them before the 30th. This occurred on January 18th.
** Peter has drafted a delegation request and sent an email to Raymond Fung to see what he thinks about our delegation including a proposal for the District to form a Transportation Consultation Committee.
+
** Peter has drafted a delegation to Council request and sent an email to Raymond Fung to see what he thinks about our delegation including a proposal for the District to form a Transportation Consultation Committee.
 
** Peter has drafted a HUB letter congratulating the District on separating pedestrians and cyclists on the Spirit Trail through Ambleside.
 
** Peter has drafted a HUB letter congratulating the District on separating pedestrians and cyclists on the Spirit Trail through Ambleside.
 
 
 
 
 
2017 JAN 12
 
 
Peter, tony, Martyn, fred, Nick, Justin, Amelia, Kevin Hay, Don erika, Fred, Cormack, Fiona, AntjeGiacmo, Paul
 
Dianne
 
Lynn Valley Road bike route ciMoti dnv and cnv in project
 
add a lane and a 4m wide mup narrowing to 3.3 m at southerlands and 21st
 
drop down from mup to existing southbound bike lane
 
21st crossing prblematic because of curve better if it was straghter
 
add flahing lanes
 
add a separate green lane across intersection
 
 
Danger by Design fiona
 
 
Trnaportation consultatnt – Donna Howes
 
 
east side is a cnv project
 
 
a letter from us would be helpful by 30 january to CNV and DNV – they will inormal
 
is a lightly used bus stop at Southreland -shelter is a problem for us
 
CNV owns 2 lots
 
they will see about green paint and let downs at this intersection
 
 
pedestrian controll crosswalk at 21st? They will check.
 
 
Start may/june will take 4-6 months
 
 
fence separating traffic uner Hwy 1 underpass.
 
Bollards on gree bike land north of underpass.
 
 
Ungapthemap workshop who
 
Antje got a HUB HQ re the map.
 
Fiona and I
 
 
slow down punliv forum tony will be there on the panel– vision 0
 
 
CNV
 
 
letter on green necklace
 
want letter on supporting green l necklance form 21st and Jones to Lonsdale
 
it is a greeway let call them and tell them wecant support this section
 
 
DNV
 
 
letters sent re maplewood
 
also lowhanging fruit letter
 
planner liked it and will add to their list
 
finacial plan letter
 
 
Lynn creek town centre – anoterh development -pedestrian bridge across creek spirit trail
 
got emai from community planner and invited Antje to meet to discuss plans
 
 
lisa Muri talkeing on cbc 13 people
 

Latest revision as of 15:48, 21 January 2017

  • Introductions: Tony (chair), Peter S, Don P, Fred, Erika, Fiona, Antje, Dianne, Martyn, Paul, Kevin, Amelia, Giacomo and invited guests from the DNV: Cormac Linehan, Justin Pedley and Nick (design engineer)
  • Lynn Valley Road Underpass Project Presentation
    • Cormac, the Project Manager for the Lynn Valley Road Underpass Project, led the presentation with detailed charts projected onto a screen.
    • The project is being jointly planned by DNV, CNV and MoTI and Donna Howes, a transportation consultant, is involved.
    • The project plan begins from the end of the southbound separated bike lane on Lynn Valley Road, that runs between Mollie Nye Way and Morgan Road.
    • It is planned to add a traffic lane and a 4m wide above grade multi-use-path under the Hwy 1 underpass which narrows to 3.3 m at Sutherland Ave. and continues southward across 21st Street to join the existing bike lane on Crescent Boulevard.
    • Some kind of fencing is being considered to separate the MUP from traffic under the Hwy 1 underpass which could possibly be like the fencing along the Stanley Park Causeway.
    • Our main concern was the planned crossing at Sutherland Ave. and 21st St. where at Sutherland Ave, the MUP curved slightly westward on each side of the intersection to allow a shorter crossing for pedestrians.
    • We pointed out that this would not suit cyclists, so suggested a separate green-painted bike lanes straight across the intersections.
    • It was also suggested that cyclist-activated flashing lights be considered like the ones on the Stanley Park Causeway bike path.
    • We wonder if the the traffic signal at 21st St would be pedestrian activated. They will find out.
    • There is a lightly used bus stop at Sutherland and the bus shelter could be a visibility problem for cyclists approaching the intersection.
    • They will look into the possibility of adding a green painted bike lane and suggested a letter with our suggestions to the DNV and CNV by 30 January would be helpful.
    • it is planned to start construction in May/June and it will take 4-6 months to complete.
  • Review of prior meeting minutes
    • Tony's presentation to the DNV on 21 November was viewed online and discussed and several suggestions for letters have been subsequently written.
  • Sunrise Bike Ride next steps (Not discussed at this meeting)
  • UnGapTheMap Workshop
    • Peter and/or Fiona may be available to represent HUB-NS. It will depend on the date which is being determined by a Doodle Poll.
    • Antje got a call about our input to the map.
  • SLOW DOWN NORTH SHORE public forum Jan 26, 6:30pm
    • Tony will be on the panel and others are encouraged to attend.
  • City of North Vancouver Update
    • Jones to Grand Boulevard letter has been sent.
    • Despite the request, it was decided not to submit a letter of support for this section of the Green Necklace from Jones to Lonsdale rather let them know that we do not consider it cycling infrastructure that we can support because it is only 3m wide. Nonetheless, we should let them know that we are not against the project.
    • West Keith/13th St. letter has been sent.
  • District of North Vancouver Update
    • Letters have been prepared re:Maplewood; Low Hanging Fruit projects; and the Financial Plan 2017-2021.
    • There is another plan for the Lynn Creek town centre development which involves a pedestrian bridge across a creek which will be part of the Spirit Trail. Antje got an email from a community planner inviting her to meet to discuss plans.
  • West Vancouver Update
    • It is planned that Heather Johnston and Neil Winkelmann will meet with District engineering staff on 30 January to discuss the status of the plans to extend the Spirit Trail down into Horseshoe Bay Village from Exit 0 and the traffic calming project around Eagle Harbour School. Heather sent an email report for us to consider at the meeting and would like some feedback.
    • They may also discuss possible ways to improve safety for cyclists on Marine Drive through all of West Van, which is the busiest cycling route on the North Shore.
    • Concern was expressed that they intend to represent HUB-NS but there has been no opportunity for us to share and discuss our views on the projects, so Tony will try to arrange for a few of us to meet with them before the 30th. This occurred on January 18th.
    • Peter has drafted a delegation to Council request and sent an email to Raymond Fung to see what he thinks about our delegation including a proposal for the District to form a Transportation Consultation Committee.
    • Peter has drafted a HUB letter congratulating the District on separating pedestrians and cyclists on the Spirit Trail through Ambleside.