Difference between revisions of "Meeting Summary: February 9, 2017"

From committees
Jump to navigation Jump to search
imported>Antje Wahl
imported>Peter Scholefield
 
(5 intermediate revisions by one other user not shown)
Line 1: Line 1:
*Introductions: Peter S (Chair), Don P, Fred, Erika, Antje, Dianne, Martyn, Giacomo
+
*Introductions: Peter S (Chair), Don P, Fred, Erika, Antje, Dianne, Martyn, Giacomo, Peter
 
*Review of prior meeting minutes
 
*Review of prior meeting minutes
 
*Sunrise Bike Ride next steps
 
*Sunrise Bike Ride next steps
Line 7: Line 7:
 
**Workshop 2: Peter and Fiona want to attend
 
**Workshop 2: Peter and Fiona want to attend
 
**Next steps: Peter to find out when workshop takes place, Antje to add gaps in DNV, Peter to review West Van, Antje to ask Andrew to filter by municipality and MOTI
 
**Next steps: Peter to find out when workshop takes place, Antje to add gaps in DNV, Peter to review West Van, Antje to ask Andrew to filter by municipality and MOTI
*Recap: SLOW DOWN North Shore public forum Jan 26, 6:30pm: Discussed
+
*Recap: SLOW DOWN North Shore public forum Jan 26, 6:30pm: Several committee members attended. Discussed
  +
*HUB Bike Theft Prevention Committee: Dianne reported on progress with Project 529 and relation with HUB, Bike to Work Week stations.
   
 
*City of North Vancouver
 
*City of North Vancouver
**Green Necklace Jones to Grand Blvd: Should we follow up with City? 2nd Open House coming up, check dates and send to email list.
+
**Green Necklace Jones to Grand Blvd: Check with Tony, Heather about following up on a meeting. 2nd open house coming up, check dates and send to email list.
  +
**Safety education campaign by City for dooring, safe passing distance
   
 
*District of North Vancouver
 
*District of North Vancouver
 
**Lynn Valley Road underpass update: Tony sent input letter and additional email regarding connection to pathways
 
**Lynn Valley Road underpass update: Tony sent input letter and additional email regarding connection to pathways
 
**Hunter Street update https://www.dnv.org/1401-1479-hunter-street/481-497-mountain-highway
 
**Hunter Street update https://www.dnv.org/1401-1479-hunter-street/481-497-mountain-highway
  +
***Giacomo and Antje met with DNV community planner who explained development and surrounding plans including potential new bridges across Lynn Creek.
**Snow removal
 
  +
***Antje to draft feedback on Seylynn Park design and provide bike parking design guidelines to planner and circulate.
  +
**Snow removal: Tony and Disability Advisory Committee Chair met with Streets Manager about snow removal policy for sidewalks, paths and bike lanes. Tony to draft follow-up letter.
   
 
*West Vancouver
 
*West Vancouver
 
**Results of 31 Jan meeting with DWV Engineering staff - What stood out for me at the meeting were the following:
 
**Results of 31 Jan meeting with DWV Engineering staff - What stood out for me at the meeting were the following:
  +
***Heather J., Peter and Neil met with DWV Vanessa Garrett, Norm Wong and John Calimente
 
***John Calimente's presentation to us based on his proposed new West Vancouver Cycling Network map;
 
***John Calimente's presentation to us based on his proposed new West Vancouver Cycling Network map;
 
***John Calimente said that, except for the proposed minor changes to the Cycling Network, all of the routes have been signed and now, in phase 4 of the Implementation Plan (2012), they will be focusing on cycling infrastructure and traffic calming on the Network;
 
***John Calimente said that, except for the proposed minor changes to the Cycling Network, all of the routes have been signed and now, in phase 4 of the Implementation Plan (2012), they will be focusing on cycling infrastructure and traffic calming on the Network;
 
***Plans, as a trial, for separated bike lanes on Marine Drive between 26th and 30th Streets;
 
***Plans, as a trial, for separated bike lanes on Marine Drive between 26th and 30th Streets;
 
***Plans to improve the connection between Cranley Drive and the Sea View Walk;
 
***Plans to improve the connection between Cranley Drive and the Sea View Walk;
***Plans to consult soon with MoTI to fix that section on the north side of Hwy1 between the bridge over the Capilano River and 3rd Street;
+
***Plans to consult soon with MoTI to fix that section on the north side of Hwy 1 between the bridge over the Capilano River and 3rd Street;
 
***John Calimente's Lions Gate Bridge area bike signage plan and his request for feedback on it (I'll ask for a pdf version to circulate);
 
***John Calimente's Lions Gate Bridge area bike signage plan and his request for feedback on it (I'll ask for a pdf version to circulate);
***Vanessa seemed interested in some kind of established transportation committee but thought 6 people on it would be too many; and
 
***Vanessa saying that she preferred that we communicate our ideas and concerns to her and her staff rather than the mayor and council.
 
 
 
**Status of the plans to extend the Spirit Trail down into Horseshoe Bay Village (consider new development in Horseshoe Bay)
 
**Status of the plans to extend the Spirit Trail down into Horseshoe Bay Village (consider new development in Horseshoe Bay)
  +
***Did not discuss due to lack of update
**Traffic calming project around Eagle Harbour School
 
  +
**HUB delegation topics: We will provide update on HUB activities, successes in West Van. Peter to put in delegation request.
**HUB delegation topics
 
**Pedestrian Network Survey
 
   
 
*Province
 
*Province
 
**Hwy 1 - Lower Lynn Improvements - Public Information Sessions on 21 and 25 February http://wiki.bikehub.ca/northshore/index.php?title=File:Hwy-1_lower-lynn-improvement_round2_map_event_20170117.pdf
 
**Hwy 1 - Lower Lynn Improvements - Public Information Sessions on 21 and 25 February http://wiki.bikehub.ca/northshore/index.php?title=File:Hwy-1_lower-lynn-improvement_round2_map_event_20170117.pdf
  +
***Giacomo, Antje and Tony to meet with project manager for update on cycling infrastructure and present bike highway visuals

Latest revision as of 07:52, 10 February 2017

  • Introductions: Peter S (Chair), Don P, Fred, Erika, Antje, Dianne, Martyn, Giacomo, Peter
  • Review of prior meeting minutes
  • Sunrise Bike Ride next steps
    • Did not discuss, put on agenda for March when Tony is back
  • UnGapTheMap
    • Workshop 2: Peter and Fiona want to attend
    • Next steps: Peter to find out when workshop takes place, Antje to add gaps in DNV, Peter to review West Van, Antje to ask Andrew to filter by municipality and MOTI
  • Recap: SLOW DOWN North Shore public forum Jan 26, 6:30pm: Several committee members attended. Discussed
  • HUB Bike Theft Prevention Committee: Dianne reported on progress with Project 529 and relation with HUB, Bike to Work Week stations.
  • City of North Vancouver
    • Green Necklace Jones to Grand Blvd: Check with Tony, Heather about following up on a meeting. 2nd open house coming up, check dates and send to email list.
    • Safety education campaign by City for dooring, safe passing distance
  • District of North Vancouver
    • Lynn Valley Road underpass update: Tony sent input letter and additional email regarding connection to pathways
    • Hunter Street update https://www.dnv.org/1401-1479-hunter-street/481-497-mountain-highway
      • Giacomo and Antje met with DNV community planner who explained development and surrounding plans including potential new bridges across Lynn Creek.
      • Antje to draft feedback on Seylynn Park design and provide bike parking design guidelines to planner and circulate.
    • Snow removal: Tony and Disability Advisory Committee Chair met with Streets Manager about snow removal policy for sidewalks, paths and bike lanes. Tony to draft follow-up letter.
  • West Vancouver
    • Results of 31 Jan meeting with DWV Engineering staff - What stood out for me at the meeting were the following:
      • Heather J., Peter and Neil met with DWV Vanessa Garrett, Norm Wong and John Calimente
      • John Calimente's presentation to us based on his proposed new West Vancouver Cycling Network map;
      • John Calimente said that, except for the proposed minor changes to the Cycling Network, all of the routes have been signed and now, in phase 4 of the Implementation Plan (2012), they will be focusing on cycling infrastructure and traffic calming on the Network;
      • Plans, as a trial, for separated bike lanes on Marine Drive between 26th and 30th Streets;
      • Plans to improve the connection between Cranley Drive and the Sea View Walk;
      • Plans to consult soon with MoTI to fix that section on the north side of Hwy 1 between the bridge over the Capilano River and 3rd Street;
      • John Calimente's Lions Gate Bridge area bike signage plan and his request for feedback on it (I'll ask for a pdf version to circulate);
    • Status of the plans to extend the Spirit Trail down into Horseshoe Bay Village (consider new development in Horseshoe Bay)
      • Did not discuss due to lack of update
    • HUB delegation topics: We will provide update on HUB activities, successes in West Van. Peter to put in delegation request.