Difference between revisions of "Meeting Summary: February 9, 2017"

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
(Created page with "*Introductions: *Review of prior meeting minutes *Sunrise Bike Ride next steps http://wiki.bikehub.ca/northshore/images/4/46/Sunrise_Bike.docx http://wiki.bikehub.ca/northshor...")
 
imported>Peter Scholefield
Line 1: Line 1:
  +
*Introductions: Peter S (Chair), Don P, Fred, Erika, Fiona, Antje, Dianne, Martyn, Paul, Kevin, Amelia, Giacomo
*Introductions:
 
 
*Review of prior meeting minutes
 
*Review of prior meeting minutes
 
*Sunrise Bike Ride next steps
 
*Sunrise Bike Ride next steps

Revision as of 18:14, 9 February 2017

  • Introductions: Peter S (Chair), Don P, Fred, Erika, Fiona, Antje, Dianne, Martyn, Paul, Kevin, Amelia, Giacomo
  • Review of prior meeting minutes
  • Sunrise Bike Ride next steps

http://wiki.bikehub.ca/northshore/images/4/46/Sunrise_Bike.docx http://wiki.bikehub.ca/northshore/images/c/c9/SUNRISEBIKE_-_CampagnaTour2015.pdf http://wiki.bikehub.ca/northshore/images/b/b8/SUNRISEBIKE_-_ReasonWhy_2016_ITA_%281%29.pdf http://wiki.bikehub.ca/northshore/images/0/05/SUNRISEBIKE_-_Sposorship_2016.pdf

  • UnGapTheMap
    • Workshop 2
    • Next steps
  • Recap: SLOW DOWN North Shore public forum Jan 26, 6:30pm
  • City of North Vancouver
  • West Vancouver
    • Results of 31 Jan meeting with DWV Engineering staff - What stood out for me at the meeting were the following:
      • John Calimente's presentation to us based on his proposed new West Vancouver Cycling Network map;
      • John Calimente said that, except for the proposed minor changes to the Cycling Network, all of the routes have been signed and now, in phase 4 of the Implementation Plan (2012), they will be focusing on cycling infrastructure and traffic calming on the Network;
      • Plans, as a trial, for separated bike lanes on Marine Drive between 26th and 30th Streets;
      • Plans to improve the connection between Cranley Drive and the Sea View Walk;
      • Plans to consult soon with MoTI to fix that section on the north side of Hwy1 between the bridge over the Capilano River and 3rd Street;
      • John Calimente's Lions Gate Bridge area bike signage plan and his request for feedback on it (I'll ask for a pdf version to circulate);
      • Vanessa seemed interested in some kind of established transportation committee but thought 6 people on it would be too many; and
      • Vanessa saying that she preferred that we communicate our ideas and concerns to her and her staff rather than the mayor and council.
    • Status of the plans to extend the Spirit Trail down into Horseshoe Bay Village (consider new development in Horseshoe Bay)
    • Traffic calming project around Eagle Harbour School
    • HUB delegation topics
    • Pedestrian Network Survey