Difference between revisions of "Meeting Agenda: Sept 6, 2018"

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
imported>Peter Scholefield
 
(8 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
Reference Items:
 
Reference Items:
 
*Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info
 
*Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info
*Letters sent sicne the last meeting on 12 July: [[Media:2018-08-05_CNV_BikeValets.pdf]]<Br>
+
*Letters sent since the last meeting on 12 July: [[Media:2018-08-05_CNV_BikeValets.pdf]]<Br> and [[Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf]]<Br>
[[Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf]]<Br>
 
 
Agenda:
 
Agenda:
 
*Introductions
 
*Introductions
 
*Agenda additions
 
*Agenda additions
  +
*Guest staff member from HUB's new office at 312 Main Street (2nd Floor), Vancouver
 
 
*Events: (http://wiki.bikehub.ca/northshore/images/5/50/2018_Events_overview.pdf)
 
*Events: (http://wiki.bikehub.ca/northshore/images/5/50/2018_Events_overview.pdf)
 
**Coho Festival on 9 Sept
 
**Coho Festival on 9 Sept
Line 14: Line 13:
   
 
*General Items
 
*General Items
** transition to the replacement of our chair and vice-chair.
+
**Transition to the replacement of our chair and vice-chair
  +
**Greg Robins, candidate for council in the District of North Vancouver’s 2018 elections, want to be called (604-561-4971) about improving biking in the District
  +
**Input to HUB AGM on Saturday, September 8, 2018, at Surrey City Centre Library (Meeting Room 418)- http://wiki.bikehub.ca/northshore/index.php?title=File:HUB_North_Shore_2018_AGM_Update_2_180904.pdf
 
**Annual Action Plan for Committee - http://wiki.bikehub.ca/northshore/images/3/36/2018_future_DWV_cycling_infrastructure_projects.pdf
 
**Annual Action Plan for Committee - http://wiki.bikehub.ca/northshore/images/3/36/2018_future_DWV_cycling_infrastructure_projects.pdf
 
**20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
 
**20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
Line 23: Line 24:
 
'''District of North Vancouver'''
 
'''District of North Vancouver'''
 
*Results of 5 Sept meeting with Doug Hyde on Phibbs Exchange Designs
 
*Results of 5 Sept meeting with Doug Hyde on Phibbs Exchange Designs
*Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf)
+
*Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf) and http://wiki.bikehub.ca/northshore/index.php?title=File:To_Ryan_Ross_from_Paul_Stott_re_Hwy1_bridge_over_Capilano_River.jpg
*Highway 1/Lower Lynn Improvements Project
+
*Highway 1/Lower Lynn Improvements Project - NSMBA letter to MoTI: http://wiki.bikehub.ca/northshore/images/6/63/NSMBA_letter_to_MoTI_on_Lower_Lynn_Interchanges_Aug_2018.pdf
 
*DNV Developments Updates (Fred Rathje)
 
*DNV Developments Updates (Fred Rathje)
 
*Lynn Valley Road improvements
 
*Lynn Valley Road improvements
   
 
'''District of West Vancouver'''
 
'''District of West Vancouver'''
* status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
+
*Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
* DWV UnGapThemap updates:
+
*DWV UnGapThemap updates:
 
**Wardance Bridge (Gap 515)
 
**Wardance Bridge (Gap 515)
 
**Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513)
 
**Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513)
Line 39: Line 40:
 
'''City of North Vancouver'''
 
'''City of North Vancouver'''
 
*Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.
 
*Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.
*City of North Vancouver Traffic Engineering Contact and Construction Brochure - http://wiki.bikehub.ca/northshore/index.php?title=File:Bike_Construction_Brochure_final-1.pdf
+
*City of North Vancouver Engineering Department Bike Route Construction Brochure - http://wiki.bikehub.ca/northshore/index.php?title=File:Bike_Construction_Brochure_final-1.pdf
 
*Marine Drive East between Fell and Bewicke
 
*Marine Drive East between Fell and Bewicke
 
*Grand Boulevard Intersection connections
 
*Grand Boulevard Intersection connections

Latest revision as of 17:25, 5 September 2018

HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

Reference Items:

Agenda:

District of North Vancouver

District of West Vancouver

  • Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
  • DWV UnGapThemap updates:
    • Wardance Bridge (Gap 515)
    • Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513)
    • Taylor Way from Marine Drive to Upper Levels Hwy (Gap 503)
    • East end of Keith Road to 3rd Street
    • Added a new gap (Marine Drive from 13th to Taylor Way to include an alternate route called the Ambleside-Park Royal Cycleway (running along the south section of Park Royal). This routing is currently marked as "informal bicycle route on the city's 2018 map", FYI.

City of North Vancouver