Difference between revisions of "Meeting Agenda: Sept 6, 2018"

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
imported>Peter Scholefield
Line 29: Line 29:
   
 
'''District of West Vancouver'''
 
'''District of West Vancouver'''
* status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
+
*Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
* DWV UnGapThemap updates:
+
*DWV UnGapThemap updates:
 
**Wardance Bridge (Gap 515)
 
**Wardance Bridge (Gap 515)
 
**Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513)
 
**Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513)
Line 39: Line 39:
 
'''City of North Vancouver'''
 
'''City of North Vancouver'''
 
*Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.
 
*Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.
*City of North Vancouver Traffic Engineering Contact and Construction Brochure - http://wiki.bikehub.ca/northshore/index.php?title=File:Bike_Construction_Brochure_final-1.pdf
+
*City of North Vancouver Engineering Department Bike Route Construction Brochure - http://wiki.bikehub.ca/northshore/index.php?title=File:Bike_Construction_Brochure_final-1.pdf
 
*Marine Drive East between Fell and Bewicke
 
*Marine Drive East between Fell and Bewicke
 
*Grand Boulevard Intersection connections
 
*Grand Boulevard Intersection connections

Revision as of 09:07, 1 September 2018

HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

Reference Items:

Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf
Agenda:

  • Introductions
  • Agenda additions

District of North Vancouver

District of West Vancouver

  • Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
  • DWV UnGapThemap updates:
    • Wardance Bridge (Gap 515)
    • Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513)
    • Taylor Way from Marine Drive to Upper Levels Hwy (Gap 503)
    • East end of Keith Road to 3rd Street
    • Added a new gap (Marine Drive from 13th to Taylor Way to include an alternate route called the Ambleside-Park Royal Cycleway (running along the south section of Park Royal). This routing is currently marked as "informal bicycle route on the city's 2018 map", FYI.

City of North Vancouver