Difference between revisions of "Meeting Agenda: Sept 6, 2018"

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
imported>Peter Scholefield
Line 20: Line 20:
 
**Update to North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf. The printed printed version should be available sometime in September.
 
**Update to North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf. The printed printed version should be available sometime in September.
 
** status of Letter to send on NS Road Safety Act (Don P)
 
** status of Letter to send on NS Road Safety Act (Don P)
**Family Streetwise Cycling courses in North Vancouver
 
 
***August 12th, 9:30-12:30 @ Parkgate Community Centre - link to register
 
https://bikehub.ca/civicrm/event/info?id=612&reset=1
 
 
   
 
'''District of North Vancouver'''
 
'''District of North Vancouver'''
  +
* Possible improvements to the east approach to the Hwy1 bridge over the Capilano River ()
 
*Highway 1/Lower Lynn Improvements Project
 
*Highway 1/Lower Lynn Improvements Project
 
*W 1st protected bike lane behind parking in front of water treatment plant - Tony to update
 
*W 1st protected bike lane behind parking in front of water treatment plant - Tony to update

Revision as of 18:26, 31 August 2018

HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

Reference Items:

Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf
Agenda:

  • Introductions
  • Agenda additions

District of North Vancouver

  • Possible improvements to the east approach to the Hwy1 bridge over the Capilano River ()
  • Highway 1/Lower Lynn Improvements Project
  • W 1st protected bike lane behind parking in front of water treatment plant - Tony to update
  • 2018 repaving list – (http://wiki.bikehub.ca/northshore/images/2/23/2018_paving_map.pdf)
  • DNV Developments Updates (Fred Rathje)
  • Lynn Valley Road slip lane bullets and letter for improvement

District of West Vancouver

  • status of proposed safety improvement to the Spirit Trail alongside Welch Street
  • DWV UnGapThemap updates

City of North Vancouver

  • Meeting with new transportation folks Carl and Kliment - when?
  • Results of July 15th meeting on plans for the new Harry Jerome Recreation (https://bikehub.ca/civicrm/event/info?id=611&reset=1)
  • Marine Drive East between Fell and Bewicke
  • Grand Boulevard Intersection connections
  • North Shore Bike Map back on the table - input on routes