Difference between revisions of "Meeting Agenda: Oct 11, 2018"

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
imported>Dpiercy
 
(5 intermediate revisions by 2 users not shown)
Line 4: Line 4:
 
*Agenda additions
 
*Agenda additions
 
*Guest staff member from HUB's new office at 312 Main Street (2nd Floor), Vancouver
 
*Guest staff member from HUB's new office at 312 Main Street (2nd Floor), Vancouver
**Transition to the replacement of our chair and vice-chair
+
*Transition to the replacement of our chair and vice-chair
**Results of 20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
+
*Results of 20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
**Status of printed version of the new (July 2018) North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf.
+
*Status of printed version of the new (July 2018) North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf.
**HUB questions to North Shore municipal candidates
+
*HUB questions to North Shore municipal candidates
** updating the HUB UnGapTheMap list for the North Shore - http://wiki.bikehub.ca/northshore/images/9/97/Gap_Priority_List_Extract-_North_Shore_Fall_2018.pdf
+
*updating the HUB UnGapTheMap list for the North Shore - http://wiki.bikehub.ca/northshore/images/9/97/Gap_Priority_List_Extract-_North_Shore_Fall_2018.pdf
  +
  +
'''Events'''
  +
*Bike to Work Week - Tuesday Oct 30 4-6pm, 2nd Narrows with Obsession: Bikes
  +
*Forum on the Seniors Transit Campaign (https://westvancouver.ca/transportation-roads/blue-bus/55-plus-get-there-by-bus) Wednesday, Nov 14 from 12:30-3:30 pm at the West Van Seniors Activity Centre.
  +
  +
  +
'''HUB North Shore Goals'''
  +
*Involvement in updating the N Van Bike Masterplan - Bikeways
  +
*Regular meetings with CNV
  +
*Regular meetings with NVD
  +
*Updating NS Gap
  +
*other??
  +
 
'''City of North Vancouver'''
  +
*Lynn Valley Rd/Hwy1 slip lanes - letter sent -
  +
*Grand Blvd/19th Intersection - Don drafting letter
 
*Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.
   
 
'''District of North Vancouver'''
 
'''District of North Vancouver'''
*Phibbs Exchange Designs
+
*Phibbs Exchange Designs -
 
*Highway 1/Lower Lynn Improvements Project
 
*Highway 1/Lower Lynn Improvements Project
*Lynn Valley Road improvements
 
   
 
'''District of West Vancouver'''
 
'''District of West Vancouver'''
Line 19: Line 35:
 
*Update on sidewalk widening on the Welch Street bridge over the Capilano River
 
*Update on sidewalk widening on the Welch Street bridge over the Capilano River
 
*17 October meeting with District transportation staff
 
*17 October meeting with District transportation staff
 
'''City of North Vancouver'''
 
*Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.
 

Latest revision as of 09:39, 10 October 2018

HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

Events


HUB North Shore Goals

  • Involvement in updating the N Van Bike Masterplan - Bikeways
  • Regular meetings with CNV
  • Regular meetings with NVD
  • Updating NS Gap
  • other??

City of North Vancouver

  • Lynn Valley Rd/Hwy1 slip lanes - letter sent -
  • Grand Blvd/19th Intersection - Don drafting letter
  • Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.

District of North Vancouver

  • Phibbs Exchange Designs -
  • Highway 1/Lower Lynn Improvements Project

District of West Vancouver