Difference between revisions of "Meeting Agenda: January 12, 2017"
Jump to navigation
Jump to search
imported>Peter Scholefield |
imported>Peter Scholefield |
||
Line 25: | Line 25: | ||
**HUB delegation topics |
**HUB delegation topics |
||
** Pedestrian Network Survey |
** Pedestrian Network Survey |
||
− | |||
− | |||
− | 2017 JAN 12 |
||
− | |||
− | Peter, tony, Martyn, fred, Nick, Justin, Amelia, Kevin Hay, Don erika, Fred, Cormack, Fiona, AntjeGiacmo, Paul |
||
− | Dianne |
||
− | Lynn Valley Road bike route ciMoti dnv and cnv in project |
||
− | add a lane and a 4m wide mup narrowing to 3.3 m at southerlands and 21st |
||
− | drop down from mup to existing southbound bike lane |
||
− | 21st crossing prblematic because of curve better if it was straghter |
||
− | add flahing lanes |
||
− | add a separate green lane across intersection |
||
− | |||
− | Danger by Design fiona |
||
− | |||
− | Trnaportation consultatnt – Donna Howes |
||
− | |||
− | east side is a cnv project |
||
− | |||
− | a letter from us would be helpful by 30 january to CNV and DNV – they will inormal |
||
− | is a lightly used bus stop at Southreland -shelter is a problem for us |
||
− | CNV owns 2 lots |
||
− | they will see about green paint and let downs at this intersection |
||
− | |||
− | pedestrian controll crosswalk at 21st? They will check. |
||
− | |||
− | Start may/june will take 4-6 months |
||
− | |||
− | fence separating traffic uner Hwy 1 underpass. |
||
− | Bollards on gree bike land north of underpass. |
||
− | |||
− | Ungapthemap workshop who |
||
− | Antje got a HUB HQ re the map. |
||
− | Fiona and I |
||
− | |||
− | slow down punliv forum tony will be there on the panel– vision 0 |
||
− | |||
− | CNV |
||
− | |||
− | letter on green necklace |
||
− | want letter on supporting green l necklance form 21st and Jones to Lonsdale |
||
− | it is a greeway let call them and tell them wecant support this section |
||
− | |||
− | DNV |
||
− | |||
− | letters sent re maplewood |
||
− | also lowhanging fruit letter |
||
− | planner liked it and will add to their list |
||
− | finacial plan letter |
||
− | |||
− | Lynn creek town centre – anoterh development -pedestrian bridge across creek spirit trail |
||
− | got emai from community planner and invited Antje to meet to discuss plans |
||
− | |||
− | lisa Muri talkeing on cbc 13 people |
Latest revision as of 19:54, 13 January 2017
The HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).
- Introductions:
- Lynn Valley Road Underpass Project Presentation -
- Review of prior meeting minutes
- Sunrise Bike Ride next steps
- UnGapTheMap Workshop Two
- SLOW DOWN NORTH SHORE public forum Jan 26, 6:30pm
- City of North Vancouver Update
- Jones to Grand Boulevard letter
- Discuss letter of support for the Green Necklace section from Jones to Lonsdale
- West Keith/13th letter
- District of North Vancouver Update
- Maplewood
- Low Hanging Fruit letter
- Financial Plan 2017-2021
- West Vancouver Update
- Status of the plans to extend the Spirit Trail down into Horseshoe Bay Village (consider new development in Horseshoe Bay)
- Traffic calming project around Eagle Harbour School
- HUB delegation topics
- Pedestrian Network Survey