Meeting Agenda: May 2018

From committees
Jump to navigation Jump to search

HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info

  • Introductions
  • Agenda additions
  • NSMBA - Tony note on mailing list. Date for coordination meeting to be confirmed. Anyone interested in supporting this subcommittee?

District of North Vancouver

  • Lower Lynn Interchanges
  • 2018 DNV repaving list / budget spend - received
    • Background: March 2018 DNV provided a preliminary list of paving projects to Tony. I have reviewed the list and compared them to the 2012 Bicycle Master Plan, BMP. All of the paving segments that are part of the BMP I have highlighted in red on the map. The ones that are not are in grey. The orange lines are cycle routes that are currently have an ongoing review/comment program.
    • Proposal: We should gather comments on the segments listed below using our yahoo group, and discuss/approval a draft at our May meeting and then submit them with a request to see the plans for cycle improvements to be included as part of these repaving projects.
    • Paving segments in the 2012 Bicycle Master Plan:
      • 29th Street – DNV currently has a comment open on there website. We should continue to encourage people to contribute. Also HUB NS should submit an official letter with our recommendations. http://www.dnv.org/news/share-your-thoughts-proposed-e29th-st-safety-improvements
      • Highlands Blvd – DNV currently has a pilot on this segment. HUB NS should submit an official letter with our recommendations. http://www.dnv.org/property-development/current-bike-lane-pilot-projects
      • Queens - DNV currently has a pilot on this segment. HUB NS should submit an official letter with our recommendations. http://www.dnv.org/property-development/current-bike-lane-pilot-projects
      • Mountain Hwy - 1250 Mtn Hwy to 14th St. Steep, narrow S turn on busy road. ask for protected bike lanes, to connect to new Mtn HWY overpass.
      • West 15th/Roosevelt St – 2 block segment Pemberton to McKay Creek(CNV), needs review, ask for protected bike lanes, to be extended later?
      • Spicer – 1 block on-road segment that connects 2 off-road segments, request protected bike lanes?
      • Arbourlynn Drive – short segment Hoskins to 20th, needs review, ask for protected bike lanes, to be extended later?
      • Philip – 1 block on residential street. Any improvements needed? Connection to the underpass?

http://wiki.bikehub.ca/northshore/images/2/23/2018_paving_map.pdf

District of West Vancouver

City of North Vancouver

  • 13th St E between Lonsdale and St. George's - southside development and Bike Master Plan Implementation update
  • W. 1st work to install sidewalks. Work does not include funding for bike lanes, but future work is possible additional consultation required.

Bowen Island

  • now on ungap the map and an area for growth

Ministry of Transportation and Infrastructure

  • Phibbs Exchange Update

Other Letters or Actions Required

  • 2012 Bike Masterplan Updates: 3rd Street / 2nd Street / Mahon -> Planned for 2018
  • HUB Structure and Sub-Committee Focus - discuss rotating chairs and note takers