Difference between revisions of "2022-04-07 Agenda"

From committees
Jump to navigation Jump to search
imported>Nadiaf
imported>Dpiercy
Line 108: Line 108:
   
 
=== District of North Vancouver - Fred/Don ===
 
=== District of North Vancouver - Fred/Don ===
*'''Meeting with staff''': Feb-24
 
** Marine Dr cycling link (south): DWV border – McGuire - Design spring, Build Winter 2022-23
 
** Mtn Hwy - Arborlynn connector: West 2022, East 2022 or 2023.
 
** Arborlynn corridor safety study (focused on vehicle speed and intersections)
 
** Spirit Trail planning (Concepts & plan for approval this summer, build over next 10 years)
 
** Wayfinding priorities (Requested area around 2nd narrows, Lower cap road, Pemberton height (23rd to Paisley and McKay))
 
*** Any others?
 
** Slow Streets: Safe Streets workshop Mar 28th
 
** Repaving Riverside Drive - asked for design and if bikelanes included.
 
 
 
*'''Upper Lynn Valley Rd'''
 
*'''Upper Lynn Valley Rd'''
 
** At Mar 7th council meeting:
 
** At Mar 7th council meeting:
*** Request approval to build Phase 1 this summer
+
** Council approved building Mtn. Hwy to Peters Road this summer
 
*** painted bikelanes on both sides, much of the parking removed. Protection at start of each block
*** Approval for public consultations for this spring
+
** Council approved for public consultations for Peters to Dempsey this spring
   
* 2022 Construction plans (to be confirmed):
+
* 2022 Construction plans:
  +
** Upper Lynn Valley Road
 
** Hunter Street Bridge
 
** Hunter Street Bridge
 
*** construction started, complete by Nov/Dec
 
*** construction started, complete by Nov/Dec
** Marine Drive connection (2022-23)
+
** Marine Dr cycling link (south): DWV border – McGuire - Design spring, Build Winter 2022-23
 
** Paisley Rd route - TBC
 
** Paisley Rd route - TBC
** Arborlynn connector - West side
+
** Arborlynn connector - West side in 2022, East side 2023
  +
 
*'''Meeting with staff''': later in April?
 
** Spirit Trail planning (Concepts & plan for approval this summer, build over next 10 years)
 
** Wayfinding priorities (Requested area around 2nd narrows, Lower cap road, Pemberton height (23rd to Paisley and McKay))
 
** Slow Streets: Safe Streets workshop planned for Mar 28th
 
** Repaving Riverside Drive - asked for design and if bikelanes included.
  +
 
<!--
 
<!--
 
*'''Arborlyn Connector'''
 
*'''Arborlyn Connector'''
 
** requested schedule update
 
** requested schedule update
 
*'''Lynn Valley Rd - Mtn. Hwy to Peters Road'''
 
** Reviewed design in May - painted bikelanes on both sides, much of the parking removed. Protection at start of each block
 
** Peters to Dempsey planing in for 2022
 
** Upper LVR improvements contingent on obtaining third party infrastructure funding.
 
 
*'''Capilano Rd/Highway Underpass MOTI project'''
 
** budget request for a joint design with MoTI in 2022
 
** Investigating replace the barriers in Phillips tunnel with fence at south end (on DNV roadway) to make entry to Phillips Ave safer
 
   
 
*'''Rufus/Kirkstone and Brooksbank'''
 
*'''Rufus/Kirkstone and Brooksbank'''

Revision as of 15:35, 3 April 2022

HUB North Shore Committee regular meetings will be held online using Zoom, on the first Thursday of every month at 6:30pm - 8:30pm. Everybody is welcome.

Online conference call at https://us06web.zoom.us/j/85326713256?pwd=UUNtTGx4NVBSL2FXcFVXY1dVS1pNZz09

By phone: call 778-907-2071, Meeting ID: 853 2671 3256, Passcode: 406068
One tap mobile: +17789072071,,85326713256#,,,,*406068#

General

  • Agenda additions
  • Introductions
  • North Shore MLAs
    • set up meeting with MLAs - Don


Public Input/Consultations

  • Public input is critical when Council and Staff make trade-offs and decisions. Please make sure your voice is heard!!
    • Are there any currently open????


Goals & Objectives

  • 2021 Goals Setting
  • 2022
    • Implementation of 3 top priority Bikeways
    • Establish communications with community stakeholders re Bikeways.
    • Recruit more committee members


Events

  • Outdoor Safety and Emergency Preparedness - May 7th, 11-2pm, Argyle
  • Go By Bike Week - May 30 - June 3, 2022


City of North Vancouver - Nadia

CNV Key Contacts & Staff Meetings

  • HUB’s primary contact: Brandon Green
  • Next meeting with staff: April 27. Do you have any questions for the CNV? Seeking updates on the following:
    • Carson Graham School Area Active Transportation Improvements
    • Forbes & 3rd
    • Bike storage designs (came up during Mobility Strategy discussion)
    • Community Wellbeing Strategy
    • E-bike share program
    • E-scooter pilot program

E-scooter Pilot

The Shipyards Strategy

  • https://letstalk.cnv.org/theshipyards
  • Survey is now open until August 31st 4pm (it’s quick ~ 5 minutes. 1 open ended, rest are multiple choice/checkboxes).
  • ‘What could we do better?’. A few cycling related responses:
    • More bike parking
    • Better/clearer bike routes (wayfinding signage with destinations, pavement markings)
    • Separation of walking & cycling
    • Slower car speeds in the surrounding areas
  • Connected to the Waterfront Transportation Network Survey? (December 2021)

Esplanade Complete Street

CNV Mobility Strategy (no update)

St Andrews Safety Improvements (no update)

  • The following are now complete:
    • New sidewalks on the east side
    • Bumpout & yellow delineators (at 9th)
    • Raised crosswalks (at 8th and 9th)
  • Due to a national road paint shortage, the road has not yet been repainted to narrow the travel lane and provide an uphill parking protected bike lane.
  • Once complete, counts will follow to measure changes to volume and speed.
  • Signage:
    • Signage typical on CNV bike routes will be added, confirming users are on the route.
    • Destination based bicycle wayfinding is not included in this project, as it will be delivered once the City develops a broader wayfinding strategy.
  • https://www.cnv.org/-/media/City-of-North-Vancouver/Images/Image-Panels/Streets-and-Transportation/St-Andrews-road-maps.ashx

ITC - Dana & Jonathan


District of North Vancouver - Fred/Don

  • Upper Lynn Valley Rd
    • At Mar 7th council meeting:
    • Council approved building Mtn. Hwy to Peters Road this summer
      • painted bikelanes on both sides, much of the parking removed. Protection at start of each block
    • Council approved for public consultations for Peters to Dempsey this spring
  • 2022 Construction plans:
    • Upper Lynn Valley Road
    • Hunter Street Bridge
      • construction started, complete by Nov/Dec
    • Marine Dr cycling link (south): DWV border – McGuire - Design spring, Build Winter 2022-23
    • Paisley Rd route - TBC
    • Arborlynn connector - West side in 2022, East side 2023
  • Meeting with staff: later in April?
    • Spirit Trail planning (Concepts & plan for approval this summer, build over next 10 years)
    • Wayfinding priorities (Requested area around 2nd narrows, Lower cap road, Pemberton height (23rd to Paisley and McKay))
    • Slow Streets: Safe Streets workshop planned for Mar 28th
    • Repaving Riverside Drive - asked for design and if bikelanes included.


District of West Vancouver - Paul/Peter/Mike

Liaison Meeting and Group Ride

  • On 23 February Paul and Peter and Mike met at the Crema coffee shop for a meeting, then went for a bike ride to Park Royal afterward.
  • We discussed some draft comments that Paul had prepared on the engineer drawings that DWV staff had sent us for comment on proposed plans for improving Westmount Road down to 31st and Marine Drive.
  • This was not the first time that we have commented on the plans and our main concern remains the fact that the proposed uphill bike lanes, some with buffers, are not consistent along the whole route.
  • We also suggested speed cushions on Westmount Road (https://wiki.bikehub.ca/sites/northshore/images/5/5a/Speed_cushions_on_15th_St_east_of_Pemberton_Ave_2022-01-21_IMG_3697_01.JPG) instead of speed humps which are more comfortable and safer for cyclists to ride through.
  • After our meeting in the coffee shop, we rode our bikes on our proposed route for a separated bikeway between Ambleside and Park Royal and discussed possible options for a required new bridge across the Pound Road wetland.

New path on Welch Street Bridge

Planned 3 March meeting with DWV Director of Parks, Culture & Community Services

  • Paul prepared an agenda for our first meeting with Sue Ketler, Director of Parks, Culture & Community Services, which focuses on possible improved bike infrastructure in the vicinity of the parks at Ambleside and at Horseshoe Bay.
  • We will also mention the need for more bike racks in the Ambleside parks including the two artificial playing fields.


MOTI - Don/Jonathan

  • Lower Lynn Interchanges
    • Mountain Hwy Interchange
      • Protection for Northbound on Mtn-Hwy at south intersection - MoTI will add spring 2022.
    • Main-Dollarton interchange
      • New access ramps to existing tunnel on north side, completed but path ends with fence at Phibbs
  • Small projects - maintenance issues
    • Meet with MoTI's Operations Mgr Oct 14th
    • Phillips ave Tunnel barriers - looking to make changes, but best option will require DNV and local resident buy in.
    • Will consider Repairs to Paths between Cap bridg , North interchange and Phillips tunnel in 2022
    • Cypress Bowl Road - MoTI are gathering information. We and others have suggested reallocation of 1 uphill lane during non-ski season.
    • HSB & Exit 0


Communications & Outreach - Heather/Antje/Giacomo/Paul

  • Communications = Paul, Antje, Giacomo, Heather
    • Send Antje photos of new or existing good infrastructure on the North Shore or tag @hubnorthshore on Twitter
    • let us know if there is something we should communicate about - blocked bike lanes, new infrastructure, etc.


Schools -

  • Several folks have expressed interest in working on Bike Educations and encouraging kids to ride to school
  • If a few people are willing to champion this this could be a 2022 goal


Developers - Fred, Paul & Peter

  • Currently active:
    • West Van
      • ????
    • CNV
      • ????
    • DNV
      • ????


RCMP -

  • Ask them about slow streets?