Difference between revisions of "2021-02-04 Agenda"

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
imported>Sibylle
Line 92: Line 92:
 
=== District of North Vancouver - Sibylle/Fred ===
 
=== District of North Vancouver - Sibylle/Fred ===
 
* 2021 Plan:
 
* 2021 Plan:
  +
** Met with Ingrid on January 19 to go over HUB priorities. The DNV will be expediting improvements to the Mountain Hwy corridor to Lynn Valley town centre to address cycling impediments.
 
** Tatlow+W15th
 
** Tatlow+W15th
 
*** A DVV priority. Requires engagement with local residents. Connection from Marine Drive to 15th needs attention.
 
*** A DVV priority. Requires engagement with local residents. Connection from Marine Drive to 15th needs attention.
** Ruffus/Kirkstone and Brooksbank to connect to Casano/Loutet overpass
+
** Rufus/Kirkstone and Brooksbank to connect to Casano/Loutet overpass
 
*** DNV feels that existing road network is adequate (low traffic volumes) and are not planning on changes at this time.
 
*** DNV feels that existing road network is adequate (low traffic volumes) and are not planning on changes at this time.
 
** Hunter street bridge in Lynn Creek TC
 
** Hunter street bridge in Lynn Creek TC
 
*** design has started, construction start in summer. DNV will share design with HUB when appropriate.
 
*** design has started, construction start in summer. DNV will share design with HUB when appropriate.
 
** Steep MUP from Deep Cove to Parkgate via Indian River neighbourhood
 
** Steep MUP from Deep Cove to Parkgate via Indian River neighbourhood
*** Funds for this are only in the $100,000 range. Goal is to upgrade parts of the existing trail. Nothing difinitive at this stage.
+
*** Funds for this are only in the $100,000 range. Goal is to upgrade parts of the existing trail. Nothing definite at this stage.
 
** Upper LV Road (Phase I) from TC to Peters Road in 2021. Peters to Dempsey planned for 2022 but may be included in Phase I.
 
** Upper LV Road (Phase I) from TC to Peters Road in 2021. Peters to Dempsey planned for 2022 but may be included in Phase I.
** Upper LVR improvements contingent on obtaining third party infrastructure funding. Assuming funding is successful it means the "DNV will be spending 50% of the transportation budget on active transportation according to Mayor Little."
+
*** Upper LVR improvements contingent on obtaining third party infrastructure funding. Assuming funding is successful it means the "DNV will be spending 50% of the transportation budget on active transportation according to Mayor Little."
** Met with Ingrid on January 19 to go over HUB priorities. The DNV will be expiditing improvememts to the Mountain Hwy corridor to Lynn Valley town centre to address cycling impediments.
+
** Met with Ingrid January 26 on upper Lynn Valley Rd cycling paths. Uphill protected bike path currently in the design stage. HUB has been asked to provide input. In general terms there will be a protected bike lane on both sides of Lynn Valley Rd as part of phase I. (Mountain Hwy to Peters Rd.)
 
**Meeting with Ingrid February 5 to provide HUB comments on LVR design (Mtn. Hwy to Peters Road.). Will need to make sure that design meshes with plans for LV TC bike plans.
** Met with Ingrid January 26 on upper Lynn Valley Rd cyling paths. Uphill protected bike path currently in the design stage. HUB has been asked to provide input. In general terms there will be a protected bike lane on both sides of Lynn Valley Rd as part of phase I. (Mountain Hwy to Peters Rd.)
 
**Meeting with Ingrid February 5 to provide HUB comments on VR design (Mtn Hwy to Peters Road.)
 
 
* also ask about budget for missing Wayfinding signage
 
* also ask about budget for missing Wayfinding signage
   
 
*Other
 
*Other
** DNV did not buy bike path sweeper in 2020 due to Covid, but not sure if it is in the 2021 budget request.
+
** DNV did not buy bike path sweeper in 2020 due to COVID-19, but not sure if it is in the 2021 budget request.
 
** Started discussion of adding protection to bike lanes on Mountain south of the Hwy Overpass
 
** Started discussion of adding protection to bike lanes on Mountain south of the Hwy Overpass
** Draft designs for a MUP on east and west side of Mountian Hwy north of the overpass.
+
** Draft designs for a MUP on east and west side of Mountain Hwy north of the overpass.
   
 
===District of West Vancouver - Paul/Peter/Mike===
 
===District of West Vancouver - Paul/Peter/Mike===

Revision as of 20:54, 3 February 2021

Starting in February 2021 HUB North Shore Committee regular meetings will change to the first Thursday of every month, still at at 6:30pm - 8:30pm. Everybody is welcome. Online conference call at https://join.me/HUBCyclingLC You can also phone in (audio only) at +1.778.654.8779,,859-185-641 #

  • Agenda additions
  • Introductions

General

  • 2020 New Infrastructure - List & map - Don
  • Schedule Meetings with North Shore MLAs
    • Topics to cover
      • Over view of HUB and North Shore committee's Goals & Activities
      • Updating the MVA to a Safe Roads Act.
      • Incentives for e-Bikes
      • Current NS MoTI projects


Goals & Objectives



City of North Vancouver - Erika

  • Esplanade Update
    • Community engagement has ended with 91 responses on Let's Talk CNV. Phase 2 (winter 2020) is "share what we heard and gather feedback." In spring 2021 they will present the final design, summarize Phase 2 feedback and then report back to council including the construction timeline. Construction to begin in summer/fall 2021. Project page: https://letstalk.cnv.org/esplanade-complete-street
  • e-Bike share pilot
    • Applications for operators are open until Feb 17
  • Be my co-pilot
    • Heather has moved on to a communications role. Thank you Heather! Erika needs a new co-pilot or two!
  • City Priority Routes
    • Phase 1
      • 1st Street (almost complete)
      • Casano-Loutet overpass (construction starts in the spring)
      • Jones
    • Phase 2
      • Esplanade
      • Midtown Connector to Casano Loutet bridge - 13th to Boulevard then up to 17th?
      • Upper Levels Greenway East
    • Phase 3
      • St. Davids
      • Chesterfield 13th down
      • Upper Levels Greenway West
  • ITC - Dana & Jonathan

District of North Vancouver - Sibylle/Fred

  • 2021 Plan:
    • Met with Ingrid on January 19 to go over HUB priorities. The DNV will be expediting improvements to the Mountain Hwy corridor to Lynn Valley town centre to address cycling impediments.
    • Tatlow+W15th
      • A DVV priority. Requires engagement with local residents. Connection from Marine Drive to 15th needs attention.
    • Rufus/Kirkstone and Brooksbank to connect to Casano/Loutet overpass
      • DNV feels that existing road network is adequate (low traffic volumes) and are not planning on changes at this time.
    • Hunter street bridge in Lynn Creek TC
      • design has started, construction start in summer. DNV will share design with HUB when appropriate.
    • Steep MUP from Deep Cove to Parkgate via Indian River neighbourhood
      • Funds for this are only in the $100,000 range. Goal is to upgrade parts of the existing trail. Nothing definite at this stage.
    • Upper LV Road (Phase I) from TC to Peters Road in 2021. Peters to Dempsey planned for 2022 but may be included in Phase I.
      • Upper LVR improvements contingent on obtaining third party infrastructure funding. Assuming funding is successful it means the "DNV will be spending 50% of the transportation budget on active transportation according to Mayor Little."
    • Met with Ingrid January 26 on upper Lynn Valley Rd cycling paths. Uphill protected bike path currently in the design stage. HUB has been asked to provide input. In general terms there will be a protected bike lane on both sides of Lynn Valley Rd as part of phase I. (Mountain Hwy to Peters Rd.)
    • Meeting with Ingrid February 5 to provide HUB comments on LVR design (Mtn. Hwy to Peters Road.). Will need to make sure that design meshes with plans for LV TC bike plans.
  • also ask about budget for missing Wayfinding signage
  • Other
    • DNV did not buy bike path sweeper in 2020 due to COVID-19, but not sure if it is in the 2021 budget request.
    • Started discussion of adding protection to bike lanes on Mountain south of the Hwy Overpass
    • Draft designs for a MUP on east and west side of Mountain Hwy north of the overpass.

District of West Vancouver - Paul/Peter/Mike

  • Input to the DWV 2021 budget
    • Mike, Paul and Peter have been in contact with the DWV Councillor individually concerning the budget.
    • [1] 31 January response to Paul from Jenn Moller with her comments on HUB-NS priorities -
    • 2 February zoom discussion between Don, Paul, Peter and Mike.
    • [2] 3 February response to Jenn Moller from Paul.
    • [3] 3 February input of comments on the budget by Peter to the District website -
  • Widening of the south sidewalk on the Welch Street Bridge over the Capilano River
    • Park Royal has signed the contract for the work and Vice President Rick Amantea has provided us with the engineering drawings.
    • [4] Engineering drawings
    • The project is expected to be completed by the end of June.

MOTI - Antje/Don

  • Lower Lynn - Monthly meeting
    • Mountain Hwy Interchange
      • HUB feedback to action items from active transportation safety audit - most items are good, but the consultant missed a few issues
      • 4m MUP along westbound Mtn Hwy offramp problematic as shown in design - to discuss in our next meeting
  • BC Economic Recovery funding - for MoTI
    • started in Nov, must be spend by March!
    • HUB provided feedback to design team (Parsons) on early design of Lynn Valley Rd underpass and Capilano Rd interchange
    • 3 North Shore Projects:
      • Lynn Valley Rd Underpass - Design only (ready to put out to tender) - currently early draft
        • 2m bikeway next to 2m pedestrian path, less thought underpass
        • Congested section N of underpass due to property line and future crossing of new greenway
        • Requested removal of slip lanes, or making them more orthogonal to improve sightlines & safety.
      • Capilano Road interchange - Design only (ready to put out to tender) - currently early draft
        • 4m MUP from EB Hwy to Cap Road - low priority
        • Asked them to add upgrading connection for North Intersection to North sidewalk and thus Hugo Ray in West van
        • 4m bi-directional bikelane + sidewalk from Cap rd to Keith
        • Improved South intersection crossings & islands (NB)
        • 2m Bikelane next to 2m sidewalk NB on Capilano Rd (1.8+1.8 north of bridge)
        • 2M Bikelane next to existing sidewalk SB on Capilano Rd
      • Lion Gate Bridge improvements - (Not just a design)
        • Still no details yet
  • Hwy 1 North Shore Corridor Study Lynn Valley to Horseshoe Bay
    • Still waiting for draft report

Communications & Outreach - Heather/Antje/Giacomo/Paul

  • We are working on a communications plan



Developers - Fred/Paul & Peter

  • Currently active:
    • West Van ????