"Low hanging fruit" list
Jump to navigation
Jump to search
City of North Vancouver
- Signage
- Lynn Valley Road bypass from Sutherland to Lynn Valley Town Centre/Mall via 21st St, Rufus, Kirkstone Park (with DNV)
- From Westview to MOTI path along Hwy 1/Pemberton Heights
- Pavement markings
- Green Necklace bike/walk stencils
- Green Necklace crossbike at street crossings
- Queensbury at Keith: bike lane or at least sharrows
- East Keith Road bike lane, with separator (with DNV)
- 17th St around Lonsdale: diverter or other means to reduce traffic
- 13th St east of St Georges: fix bike stencils that are marked too close to parked cars
- Brooksbank at Cotton: mark bike box to allow cyclists coming from multi-use trail at MEC store to connect with eastbound bike lane on Cotton/Main
- Separators (to prevent vehicles from entering the bike lane)
- Low Level Rd
- 3rd St uphill bike lane
- Curb drops
- Other improvements
District of North Vancouver
- Signage
- Lynn Valley Road bypass from Sutherland to Lynn Valley Town Centre/Mall via 21st St, Rufus, Kirkstone Park (with CNV)
- Philip Ave connection between Pemberton Heights and Edgemont
- West Van-North Van connection via Hwy 1 Capilano River bridge (with MOTI, West Van)
- Pavement markings
- East Keith Road bike lane, with separator (with CNV)
- Separators (to prevent vehicles from entering the bike lane)
- Mount Seymour Parkway
- Curb drops
- Spirit Trail at Lloyd: widen curb drop to width of marked crosswalk
- Other improvements