HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

  • Agenda additions
  • Introductions

2019 Objectives

  • 3 Top Priority Bikeways + Active Transportation Coordinator
    • Liaisons to prepare Agenda for meetings with Mayors & Councillors
  • How do we measure progress on these goals?


General


Events - Lora

  • Earth Day at Loutet Farm - Apr 27, 10:00-13:00 - need staff for booth
  • Bike to Work Week - May 27-Jun2 2019
  • BC Active Transportation Summit - June 17 & 18, New Westminister - BC Cycling Coalition.
  • 2019 plan


City of North Vancouver - Erika/Heather

  • Bike Valet - report to council
  • Highlights from Feb 11 meeting
  • ITC - Fiona
    • Casano – Loutet Overpass - detailed design 60% done, built in late 2019. requesting bike BC funding
    • Marine Dr Mosquito Creek Bridge - includes protected bike lanes at the sidewalks in two directions, start in March, finish in Fall
  • Next meeting -
    • B-Line changes to include 2 sections of off street bikepath: 1) On Third Street along Moodyville Park moving east on the south side 2) from Gladstone to Brooksbank on the southside only. Sent a Letter to Mayor, Council and Staff regarding support for B-Line in general, but also asking for safe bike routes. The route includes Esplanade which really needs fixing.
    • Don and Heather responded to a request for comment from CBC regarding the death of the person cycling along Esplanade. When we get the details, we will think about a HUB response.
    • We have requested monthly meetings with staff (but have not heard back)
    • Attended the INSTPP meeting with TransLink and MLA Bowinn Ma. Many pro-cycling people in the room.
  • CNV response re collision on Green Necklace - http://wiki.bikehub.ca/northshore/images/9/93/CNV_response_re_collision_on_Green_Necklace.pdf


District of North Vancouver - Antje/Jay/Giacomo

  • no February meeting
    • new wayfinding signage - receipt of comments acknowledged for LLTC to LVTC proposed routing and wayfinding - no ETA for staff completion
    • Cycling & Work Zones - receipt of comments acknowledged
    • NV Bike masterplan update - RFP for consultants released - to follow up
  • Provided comments on 1st / Mackay buffered bike lanes - to follow up
  • Bike BC funding support request re: 29th Avenue. Letter of support provided - to follow up with conditions for future requests to staff (i.e. must be AAA, preferred on our priority routes).
  • Next meeting - April


District of West Vancouver - Paul/Peter

  • B-Line controversy
  • Proposed Upper Level Multi-use Path
  • 2019/20 active transportation budget update
  • 13 Feb update from John Calimente, DWV Transportation Planning Analyst
    • North Shore e-bike share RFP underway - 1st pilot will be a docking system along Marine Drive corridor, Dundarave to and up Lonsdale, possibly also a dock at Grouse Mountain.
    • Hugo Ray connector - Capilano Bridge to 3rd Street on Hwy 1 - waiting for a permit from MoTI.
    • 3rd and Mathers ave to Taylor Way - draft design has been sent to MoTI.
    • Capilano Pacific Trail improvement up to Keith Road - draft design is with MoTI and Purchasing - TransLink funding - construction will take 3-4 weeks.
    • Wayfinding at the north end of Lions Gate Bridge - we will get to comment on the latest iteration.
    • Welch Street Bridge sidewalk widening - the plan is with Squamish Nation - Park Royal wants it finished before the busy summer season - widening will be completed before finalizing approach at the east end.
    • Royal Avenue Horseshoe Bay - on hold because only enough money for the 1st of 3 phases of the streetscape plan.
    • Bike racks for Ambleside and Dundarave - funds are available - design of the racks is being considered whether to adopt a standard or some kind of custom design.


Translink - Fred/Antje

  • e-Bikes on Buses - Update on HUB HQ discussions with TransLink
  • Bike parking at Exchanges: Space for future at Lonsdale Quay & Phibbs (also space for bike share)


MOTI - Giacomo/Antje

  • Fencing sidewalks to Lions Gate Bridge (north end)