Meeting Agenda: Sept 6, 2018
Jump to navigation
Jump to search
HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).
Reference Items:
- Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info
- Letters sent sicne the last meeting on 12 July: Media:2018-08-05_CNV_BikeValets.pdf
Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf
Agenda:
- Introductions
- Agenda additions
- Events: (http://wiki.bikehub.ca/northshore/images/5/50/2018_Events_overview.pdf)
- Coho Festival on 9 Sept
- There is a HUB NS calendar which can be incorporated into a calendar program: https://calendar.google.com/calendar/ical/hub.ns.events%40gmail.com/public/basic.ics
- General Items
- transition to the replacement of our chair and vice-chair.
- Annual Action Plan for Committee - http://wiki.bikehub.ca/northshore/images/3/36/2018_future_DWV_cycling_infrastructure_projects.pdf
- 20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
- Update to North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf. The printed printed version should be available sometime in September.
- Status of Letter to send on NS Road Safety Act (Don P)
District of North Vancouver
- Results of 5 Sept meeting with Doug Hyde on Phibbs Exchange Designs
- Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf)
- Highway 1/Lower Lynn Improvements Project
- DNV Developments Updates (Fred Rathje)
- Lynn Valley Road improvements
District of West Vancouver
- status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
- DWV UnGapThemap updates:
- Wardance Bridge (Gap 515)
- Capilano Pacific Trail from Hwy 1 to Spirit Trail (Gap 513)
- Taylor Way from Marine Drive to Upper Levels Hwy (Gap 503)
- East end of Keith Road to 3rd Street
- Added a new gap (Marine Drive from 13th to Taylor Way to include an alternate route called the Ambleside-Park Royal Cycleway (running along the south section of Park Royal). This routing is currently marked as "informal bicycle route on the city's 2018 map", FYI.
City of North Vancouver
- Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.
- City of North Vancouver Traffic Engineering Contact and Construction Brochure - http://wiki.bikehub.ca/northshore/index.php?title=File:Bike_Construction_Brochure_final-1.pdf
- Marine Drive East between Fell and Bewicke
- Grand Boulevard Intersection connections
- Brian Patterson - Municipal Leaders Ride