Meeting Summary: July 9, 2015: Difference between revisions
Jump to navigation
Jump to search
imported>Peter Scholefield No edit summary |
imported>Peter Scholefield No edit summary |
||
Line 9: | Line 9: | ||
# West Van cycling infrastructure update |
# West Van cycling infrastructure update |
||
#* Spirit Trail |
#* Spirit Trail |
||
#** Eagleridge Community Centre, west side of Marine Drive past Eagleridge school to Exit 0 by the end of August |
#** Eagleridge Community Centre, west side of Marine Drive past Eagleridge school to Exit 0 by the end of August. |
||
#** improvement to Orchill Road section as well |
#** improvement to Orchill Road section as well. |
||
#** Consultant to propose a route from Exit 0, to top of Royal Avenue then to Horseshoe followed by public consultation in September |
#** Consultant to propose a route from Exit 0, to top of Royal Avenue then to Horseshoe Bay followed by public consultation in September. |
||
#** Plan being developed to extend Spirit Trail in Ambleside from 13th to 19th along Argyle - part of a waterfront plan to go to Council |
#** Plan being developed to extend Spirit Trail in Ambleside from 13th to 19th along Argyle - part of a waterfront plan to go to Council. |
||
#** meeting later this month with Park Royal to see what their plans are for the Wardance Bridge |
#** meeting later this month with Park Royal to see what their plans are for the Wardance Bridge. |
||
#** Looking for possibilities to install sections of the Spirit Trail near or on Marine Drive between 25th St and Cranley Drive. |
#** Looking for possibilities to install sections of the Spirit Trail near or on Marine Drive between 25th St and Cranley Drive. |
||
#* North end of the Lions Gate Bridge |
#* North end of the Lions Gate Bridge |
||
#** Wayfinding signage still in planning and negotiating stage - could be installed in 3-4 weeks |
#** Wayfinding signage still in planning and negotiating stage - could be installed in 3-4 weeks. |
||
#** Trees have been cleared in a section of walkway on the south side of Marine Drive between Taylor Way and the Capilano Pacific Trail - could be improved for cyclists. |
#** Trees have been cleared in a section of walkway on the south side of Marine Drive between Taylor Way and the Capilano Pacific Trail - could be improved for cyclists. |
||
#* North side of highway 1 from Capilano River Bridge to 3rd Street may be done at the end of this fiscal year if funds are available if not, then in 2016. |
#* North side of highway 1 from Capilano River Bridge to 3rd Street may be done at the end of this fiscal year if funds are available if not, then in 2016. |
||
#* Grosvenor Ambleside 1300 block redevelopment - no cycling facilities shown on Grosvenor website (http://grosvenorambleside.com/homes/architecture)despite surrounded by designated bike routes. |
|||
#* 1100 block Keith Road - sidewalk to be installed on south side this summer - may paint a bike lane on the north side if there is enough room. |
|||
#* John Calimente would like names and contact info of cyclists in West Van who may wish to comment on cycling infrastructure plans. |
|||
# Ironworkers Memorial Bridge - suggested improvements to exit onto Dollarton (10 min) |
# Ironworkers Memorial Bridge - suggested improvements to exit onto Dollarton (10 min) |
||
# Possible response to Transportation Plebiscite results (Peter 10 min) |
# Possible response to Transportation Plebiscite results (Peter 10 min) |
Revision as of 00:22, 10 July 2015
- Attendance: Peter, Dennis, Dianne, Devan, Nelson, Don M., Rob, Erika, Fiona, Amanda, Don P.
- Agenda approval/changes additions
- Minutes Review (Peter 2 min)
- North Shore Safe Routes Advocates (NSSRA) request for HUB funding (10 min)
- Mountain Highway exchange update (Devan 15 min)
- Car Free day August 22 (Heather 5 min)
- HUB-NS outreach package (Dennis 10 min)
- West Keith Road, North Van Open House (Rob 10 min)
- West Van cycling infrastructure update
- Spirit Trail
- Eagleridge Community Centre, west side of Marine Drive past Eagleridge school to Exit 0 by the end of August.
- improvement to Orchill Road section as well.
- Consultant to propose a route from Exit 0, to top of Royal Avenue then to Horseshoe Bay followed by public consultation in September.
- Plan being developed to extend Spirit Trail in Ambleside from 13th to 19th along Argyle - part of a waterfront plan to go to Council.
- meeting later this month with Park Royal to see what their plans are for the Wardance Bridge.
- Looking for possibilities to install sections of the Spirit Trail near or on Marine Drive between 25th St and Cranley Drive.
- North end of the Lions Gate Bridge
- Wayfinding signage still in planning and negotiating stage - could be installed in 3-4 weeks.
- Trees have been cleared in a section of walkway on the south side of Marine Drive between Taylor Way and the Capilano Pacific Trail - could be improved for cyclists.
- North side of highway 1 from Capilano River Bridge to 3rd Street may be done at the end of this fiscal year if funds are available if not, then in 2016.
- Grosvenor Ambleside 1300 block redevelopment - no cycling facilities shown on Grosvenor website (http://grosvenorambleside.com/homes/architecture)despite surrounded by designated bike routes.
- 1100 block Keith Road - sidewalk to be installed on south side this summer - may paint a bike lane on the north side if there is enough room.
- John Calimente would like names and contact info of cyclists in West Van who may wish to comment on cycling infrastructure plans.
- Spirit Trail
- Ironworkers Memorial Bridge - suggested improvements to exit onto Dollarton (10 min)
- Possible response to Transportation Plebiscite results (Peter 10 min)
- Plans for a group assessment ride along the Spirit Trail (Peter 10 min)
- Upcoming events including HUB picnic on 12 July (10 min)