Meeting Summary: September 5, 2013: Difference between revisions
Jump to navigation
Jump to search
imported>Peter Scholefield No edit summary |
imported>Peter Scholefield No edit summary |
||
Line 23: | Line 23: | ||
#* WV Cycling Implementation Plan phase 1 to be completed by 1 October |
#* WV Cycling Implementation Plan phase 1 to be completed by 1 October |
||
#* plan to improve the section of the Capilano Pacific Trail between the two bridges over the Capilano River to connect to the Spirit Trail is in a negotiation phase to get approval to proceed |
#* plan to improve the section of the Capilano Pacific Trail between the two bridges over the Capilano River to connect to the Spirit Trail is in a negotiation phase to get approval to proceed |
||
#* Spirit Trial west - 3 zones: 1.Seaview Walk to remain essentially unchanged; 2. trail behind Gleneagles Community Centre and in front to Gleneagles school to traffic circle; and 3. traffic circle to Horseshoe Bay village - Open house on phases 1 and 2 to be held at Gleneagles Golf Course clubhouse on September - Norm wants our input on his proposal for phase 3 to widen the sidewalk on Exit 0 down to the stairway that leads to Chatham Street and construct a switchback path beside the stairway down to Chatham Street then continue west on Chatham Street then south on Royal Avenue into Horseshoe Bay village |
|||
connection two bridges over cap river |
|||
⚫ | |||
⚫ | |||
# Low Level Road cycling closure (Heather or Antje) |
# Low Level Road cycling closure (Heather or Antje) |
||
#* see Heather's email- off 3rd Street hill - they won't put signage, Port is difficult to work with |
#* see Heather's email- off 3rd Street hill - they won't put signage, Port is difficult to work with |
||
Line 39: | Line 41: | ||
bike implementation plan to be completed by 1 Oct |
bike implementation plan to be completed by 1 Oct |
||
# |
# |
||
# Spirit trial west 3 zones wants input on exit zero and switchback to Chatham beside stairs |
|||
⚫ | |||
⚫ | |||
Fiona - emergency managment - went to Victoria for an exercise 40 cylists volunteered -cyclist transported items like bottles of water and 2 eggs - took 2 hours St John's Ambulance was there |
Fiona - emergency managment - went to Victoria for an exercise 40 cylists volunteered -cyclist transported items like bottles of water and 2 eggs - took 2 hours St John's Ambulance was there |
Revision as of 05:51, 7 September 2013
- Attendance: Antje, Peter, Fiona, Nelson, Dianne, Trent, Helen, and special guest Norm Wong, transportation engineer with the District of West Van
- Monthly meeting location & time in 2014
- start at 1830 on Thursdays
- lets look at possible options - Fiona will check with the city of NV
- Roll and Stroll Bike/Walk Festival Edgemont Village October 5 (Mary Ellen, Erin, by email)
- We will be participating in this event on Saturday Oct 5th. The event runs 10-2pm.
- It is a family event with 1000-1500 people expected. HUB will be getting some sort of stamp as participants will have an event passport.
- We will need some volunteers for the booth. Erin and most likely Mary Ellen will be volunteering, but they'd like a few more people. We can discuss shifts if people can't do the whole shift.
- Send an email to Co-Event Coordinators Mary Ellen and Erin if you can help out on Oct 5th.
- Create "low hanging fruit" list for North Shore municipalities (Antje)
- Daniel Watson asked for one e.g. curb drops
- Annie Kim from DNV is also interested
- Trent will try to find a list from his time with JBAC
- Peter will review notes from the West Van Cycling Plan Technical Committee which had made a list
- Hope to get started on a list in time for the next meeting on 3 October
- Antje will send out a link
- Inexpensive improvements such as paint, signage, curb drops
- Develop report card for North Shore municipalities (Antje)
- Antje attempted to get financial expenditure data on cycling infrastructure from each municipality which would be one possible component to include in a report card
- Discussion with Norm Wong
- Keith Road: Evelyn development section repaved with sidewalk and sharrows - DWV will continue similar upgrade west to 11th Street - 11th to 13th including Clyde Ave traffic calming project is in a planning stage with the next open house scheduled 10 October
- TravelSmart, DWV and WV Community Centre Fair - to encourage people to walk, bicycle or use public transit -Thursday 26 September and Saturday 28 September - HUB-NS invited to have a booth - contact Emily Willobee at 604 921-2178
- WV Cycling Implementation Plan phase 1 to be completed by 1 October
- plan to improve the section of the Capilano Pacific Trail between the two bridges over the Capilano River to connect to the Spirit Trail is in a negotiation phase to get approval to proceed
- Spirit Trial west - 3 zones: 1.Seaview Walk to remain essentially unchanged; 2. trail behind Gleneagles Community Centre and in front to Gleneagles school to traffic circle; and 3. traffic circle to Horseshoe Bay village - Open house on phases 1 and 2 to be held at Gleneagles Golf Course clubhouse on September - Norm wants our input on his proposal for phase 3 to widen the sidewalk on Exit 0 down to the stairway that leads to Chatham Street and construct a switchback path beside the stairway down to Chatham Street then continue west on Chatham Street then south on Royal Avenue into Horseshoe Bay village
- long range plan for Spirit Trail but need cooperation of CN Rail
- repaving Marine Drive west of 21st Street
- Low Level Road cycling closure (Heather or Antje)
- see Heather's email- off 3rd Street hill - they won't put signage, Port is difficult to work with
- Meeting with North Van-Seymour MLA Jane Thornthwaite in July (Nelson, Antje)
Norm Wong
- DWV working with travelsmart to encourge walking tranist and cycling
fair at community centre 26 sep and sat 28 HUB NS
- keith road evelyn project to just east of 11th 4.3 lanes with sharrows will continue west to 11th
clyde-keith traffic calming project - open house on 6 June next open house on 10 Oct
- no speed bumps since 1988
bike implementation plan to be completed by 1 Oct
Fiona - emergency managment - went to Victoria for an exercise 40 cylists volunteered -cyclist transported items like bottles of water and 2 eggs - took 2 hours St John's Ambulance was there
- could do a course in NV perhaps next summer - Saturday morning 0900-1200 NS emergency management