Meeting Summary: September 5, 2013: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
No edit summary
imported>Peter Scholefield
No edit summary
Line 1: Line 1:
# Attendance: Antje, Peter, Fiona, Nelson, Dianne, Trent, Helen, and special guest Norm Wong, transportation engineer with the District of West Van
# Attendance: Antje, Peter, Fiona, Nelson, Dianne, Trent, Helen, and special guest Norm Wong, transportation engineer with the District of West Van
# Monthly meeting location & time in 2014
# Monthly meeting location & time in 2014
#* start at 1830 on Thursday
#* start at 1830 on Thursdays
#* lets look at possible options - Fiona will check with the city of NV
#* lets look at possible options - Fiona will check with the city of NV
# Roll and Stroll Bike/Walk Festival Edgmont Village October 5 (Mary Ellen, Erin, by email)
# Roll and Stroll Bike/Walk Festival Edgemont Village October 5 (Mary Ellen, Erin, by email)
#* We will be participating in this event on Saturday Oct 5th. The event runs 10-2pm.
#* We will be participating in this event on Saturday Oct 5th. The event runs 10-2pm.
#* It is a family event with 1000-1500 people expected. HUB will be getting some sort of stamp as participants will have an event passport.
#* It is a family event with 1000-1500 people expected. HUB will be getting some sort of stamp as participants will have an event passport.
Line 9: Line 9:
#* Send an email to Co-Event Coordinators Mary Ellen and Erin if you can help out on Oct 5th.
#* Send an email to Co-Event Coordinators Mary Ellen and Erin if you can help out on Oct 5th.
# Create "low hanging fruit" list for North Shore municipalities (Antje)
# Create "low hanging fruit" list for North Shore municipalities (Antje)
#* Daniel Watson asked for one e.g curb drops
#* Daniel Watson asked for one e.g. curb drops
#* Annie Kim from DNV is also interested
#* Annie Kim from DNV is also interested
#* Trent will try to find a list from his time with JBAC
#* Trent will try to find a list from his time with JBAC
#* Peter will review notes from the West Van Cycling Plan Technical Committee which had made a list
#* Peter will review notes from the West Van Cycling Plan Technical Committee which had made a list
#* Hope to get started on a list in time for the next meeting on 3 October
#* Hope to get started on a list in time for the next meeting on 3 October
#* Antje will send out a link
#* Antje will send out a link
#* Inexpensive improvements such as paint, signage, curb drops
#* Inexpensive improvements such as paint, signage, curb drops
Line 19: Line 19:
#* Antje attempted to get financial expenditure data on cycling infrastructure from each municipality which would be one possible component to include in a report card
#* Antje attempted to get financial expenditure data on cycling infrastructure from each municipality which would be one possible component to include in a report card
# Discussion with Norm Wong
# Discussion with Norm Wong
#*Keith Road: Evelyn development section repaved with sidewalk and sharrows - DWV will continue similar upgrade west to 11th Street - 11th to 13th including Clyde Ave traffic calming project is in a planning stage with the next open house scheduled 10 October
#*Keith Road, West Vancouver, upgrade (Peter)
#*TravelSmart, DWV and WV Community Centre Fair - to encourage people to walk, bicycle or use public transit -Thursday 26 September and Saturday 28 September - HUB-NS invited to have a booth - contact Emily Willobee at 604 921-2178
#* WV Cycling Implementation Plan phase 1 to be completed by 1 October
#* plan to improve the section of the Capilano Pacific Trail between the two bridges over the Capilano River to connect to the Spirit Trail is in a negotiation phase to get approval to proceed
connection two bridges over cap river
# Low Level Road cycling closure (Heather or Antje)
# Low Level Road cycling closure (Heather or Antje)
#* see Heather's email- off 3rd Street hill - they won't put signage, Port is difficult to work with
#* see Heather's email- off 3rd Street hill - they won't put signage, Port is difficult to work with
Line 34: Line 38:
# no speed bumps since 1988
# no speed bumps since 1988
bike implementation plan to be completed by 1 Oct
bike implementation plan to be completed by 1 Oct
#
# connection two bridges over cap river
# Spirit trial west 3 zones wants input on exit zero and switchback to Chatham beside stairs
# Spirit trial west 3 zones wants input on exit zero and switchback to Chatham beside stairs
# long range plan for Spirit Trail but need cooperation of CN Rail
# long range plan for Spirit Trail but need cooperation of CN Rail

Revision as of 02:05, 7 September 2013

  1. Attendance: Antje, Peter, Fiona, Nelson, Dianne, Trent, Helen, and special guest Norm Wong, transportation engineer with the District of West Van
  2. Monthly meeting location & time in 2014
    • start at 1830 on Thursdays
    • lets look at possible options - Fiona will check with the city of NV
  3. Roll and Stroll Bike/Walk Festival Edgemont Village October 5 (Mary Ellen, Erin, by email)
    • We will be participating in this event on Saturday Oct 5th. The event runs 10-2pm.
    • It is a family event with 1000-1500 people expected. HUB will be getting some sort of stamp as participants will have an event passport.
    • We will need some volunteers for the booth. Erin and most likely Mary Ellen will be volunteering, but they'd like a few more people. We can discuss shifts if people can't do the whole shift.
    • Send an email to Co-Event Coordinators Mary Ellen and Erin if you can help out on Oct 5th.
  4. Create "low hanging fruit" list for North Shore municipalities (Antje)
    • Daniel Watson asked for one e.g. curb drops
    • Annie Kim from DNV is also interested
    • Trent will try to find a list from his time with JBAC
    • Peter will review notes from the West Van Cycling Plan Technical Committee which had made a list
    • Hope to get started on a list in time for the next meeting on 3 October
    • Antje will send out a link
    • Inexpensive improvements such as paint, signage, curb drops
  5. Develop report card for North Shore municipalities (Antje)
    • Antje attempted to get financial expenditure data on cycling infrastructure from each municipality which would be one possible component to include in a report card
  6. Discussion with Norm Wong
    • Keith Road: Evelyn development section repaved with sidewalk and sharrows - DWV will continue similar upgrade west to 11th Street - 11th to 13th including Clyde Ave traffic calming project is in a planning stage with the next open house scheduled 10 October
    • TravelSmart, DWV and WV Community Centre Fair - to encourage people to walk, bicycle or use public transit -Thursday 26 September and Saturday 28 September - HUB-NS invited to have a booth - contact Emily Willobee at 604 921-2178
    • WV Cycling Implementation Plan phase 1 to be completed by 1 October
    • plan to improve the section of the Capilano Pacific Trail between the two bridges over the Capilano River to connect to the Spirit Trail is in a negotiation phase to get approval to proceed
connection two bridges over cap river 
  1. Low Level Road cycling closure (Heather or Antje)
    • see Heather's email- off 3rd Street hill - they won't put signage, Port is difficult to work with
  2. Meeting with North Van-Seymour MLA Jane Thornthwaite in July (Nelson, Antje)

Norm Wong

  1. DWV working with travelsmart to encourge walking tranist and cycling

fair at community centre 26 sep and sat 28 HUB NS

  1. keith road evelyn project to just east of 11th 4.3 lanes with sharrows will continue west to 11th

clyde-keith traffic calming project - open house on 6 June next open house on 10 Oct

  1. no speed bumps since 1988

bike implementation plan to be completed by 1 Oct

  1. Spirit trial west 3 zones wants input on exit zero and switchback to Chatham beside stairs
  2. long range plan for Spirit Trail but need cooperation of CN Rail
  3. repaving Marine Drive west of 21st Street

Fiona - emergency managment - went to Victoria for an exercise 40 cylists volunteered -cyclist transported items like bottles of water and 2 eggs - took 2 hours St John's Ambulance was there

    • could do a course in NV perhaps next summer - Saturday morning 0900-1200 NS emergency management