HUB Tri-Cities Assessment Ride Reports: Difference between revisions

From committees
Jump to navigation Jump to search
No edit summary
No edit summary
Line 10: Line 10:


Main findings:
Main findings:

-several substandard sections of new bike lanes on Lougheed (PMH1 responsibility) More details to follow.
-several substandard sections of new bike lanes on Lougheed (PMH1 responsibility) More details to follow.


-very dangerous situation at Lougheed and Brunette where bike lane suddenly ends without warning and resumes a block dow the road.
-very dangerous situation at Lougheed and Brunette where bike lane suddenly ends without warning and resumes a block down the road.


Video here: http://www.youtube.com/watch?v=nGXd3AuOclc
Video here: http://www.youtube.com/watch?v=nGXd3AuOclc

Revision as of 01:44, 20 January 2014

2013 Assessment Rides

David Avenue bike lanes

Lougheed Highway

Lougheed Highway 7-Jan-2014

Ride covered portion of new PMH1 infrastructure between Colony farm road and ended up at intersection of Brunette and Lougheed (both directions).

Main findings:

-several substandard sections of new bike lanes on Lougheed (PMH1 responsibility) More details to follow.

-very dangerous situation at Lougheed and Brunette where bike lane suddenly ends without warning and resumes a block down the road.

Video here: http://www.youtube.com/watch?v=nGXd3AuOclc