HUB Tri-Cities Successes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
This list is only partial. |
This list is only partial. |
||
<iframe src="https://docs.google.com/spreadsheets/d/e/2PACX-1vRcKZgrHxjxFIv5PKu1vKmEt8EKqMZXss_0BH2C4dhe3aH5C2yONKz9QmosjHgkDg/pubhtml?widget=true&headers=false"></iframe> |
|||
*Maze gate removal, Coquitlam, Belcarra Regional Park, and Port Coquitlam (Ongoing) |
*Maze gate removal, Coquitlam, Belcarra Regional Park, and Port Coquitlam (Ongoing) |
Revision as of 20:13, 10 February 2024
Return to Tri-Cities Committee Wiki
This list is only partial.
<iframe src="https://docs.google.com/spreadsheets/d/e/2PACX-1vRcKZgrHxjxFIv5PKu1vKmEt8EKqMZXss_0BH2C4dhe3aH5C2yONKz9QmosjHgkDg/pubhtml?widget=true&headers=false"></iframe>
- Maze gate removal, Coquitlam, Belcarra Regional Park, and Port Coquitlam (Ongoing)
- Gatensbury multi-use pathway, Regan Ave to Port Moody, Coquitlam (2023)
- Lougheed Highway multi-use pathway, north side, Pinetree Way to Westwood St, Coquitlam (2023)
- Guildford Greenway, Phase 1 - Johnson to Port Moody, Coquitlam (2023)
- Sumiqwuelu (formerly Riverview) wayfinding signage & chain removal from pathway, Coquitlam (2023)
- Lougheed Highway multi-use pathway, south side, between Barnet Highway and Christmas Way, Coquitlam (2023)
- United Boulevard multi-use pathway, King Edward St intersection to 15 King Edward St, Coquitlam (2023)
- Prairie Avenue multi-use pathway between Coast Meridian Road and Burns Road, Port Coquitlam (2022)
- King Albert Greenway multi-use pathway from Blue Mountain Street to Hillcrest Street, Coquitlam (2021)
- Bike parking minimums, Coquitlam (2021)
- Lougheed Highway multi-use pathway, south side, between Christmas Way and Westwood St, Coquitlam (2020)
- Gatensbury Road multi-use pathway, Coquitlam border to Henry St, Port Moody (2019 Infrastructure Improvement Award)
- Lougheed Greenway multi-use pathway, ~Palm Terrace to Coquitlam Central Station, Coquitlam (2019)
- Heritage Mountain painted bike lanes from Turner Creek Drive to Ioco Road, Port Moody (2019)
- Murray Street protected bike lane extension from Electronic Avenue to Moody St, Port Moody (2019)
- Sheep Paddocks Trail reopened, connecting Pitt River Road to Colony Farm, Coquitlam (2019)
- New access ramp connecting bike facilities on the Moody Street Overpass to the Moody Centre SkyTrain station, Port Moody (2019)
- Dogwood-Fairview on-street bikeway, Morrison Avenue to Brookmere Avenue, Coquitlam (2018)
- Murray overpass multi-use pathway, Port Moody (March 2014)
- United Boulevard multi-use pathway from 15D United Blvd to King Edward, Coquitlam (Sept 2013).
- Lougheed bike lanes, King Edward to Colony farms, Coquitlam (August 2013)
- Regan Grover interim improvement at Como Lake park, Coquitlam (spring 2013)
- Guildford Way Bike Lanes, Ioco Road to Coquitlam Border, Port Moody (2012)
- Murray Avenue bike lane and MUP, Ioco Road to Electronic Avenue, Port Moody (fall 2012)
- Broadway bike lanes, Kingsway Avenue to Mary Hill Bypass, Port Coquitlam (2012)
- King Edward overpass bike lanes and MUP, Coquitlam (2012)
- Poirier Street multi-use pathway, Regan Avenue to King Albert Avenue, Coquitlam (2012)
- David Avenue multi-use pathway, Noons Creek Drive to Pinetree Way, Coquitlam(2012)
- PoCo trail pedestrian signal at Shaughnessy (fall 2012)