Meeting Agenda: Oct 11, 2018: Difference between revisions
Jump to navigation
Jump to search
imported>Peter Scholefield (Created page with "HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City L...") |
imported>Peter Scholefield No edit summary |
||
Line 19: | Line 19: | ||
'''District of West Vancouver''' |
'''District of West Vancouver''' |
||
*Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf) |
*Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf) |
||
*DWV UnGapThemap updates: |
|||
*Update on sidewalk widening on the Welch Street bridge over the Capilano River |
*Update on sidewalk widening on the Welch Street bridge over the Capilano River |
||
*17 October meeting with District transportation staff **East end of Keith Road to 3rd Street |
|||
'''City of North Vancouver''' |
'''City of North Vancouver''' |
Revision as of 16:09, 5 October 2018
HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).
- Introductions
- Agenda additions
- Guest staff member from HUB's new office at 312 Main Street (2nd Floor), Vancouver
- Transition to the replacement of our chair and vice-chair
- Results of 20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
- Status of printed version of the new (July 2018) North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf.
- HUB questions to North Shore municipal candidates
- updating the HUB UnGapTheMap list for the North Shore
District of North Vancouver
- Phibbs Exchange Designs
- Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf) and http://wiki.bikehub.ca
- Highway 1/Lower Lynn Improvements Project
- Lynn Valley Road improvements
District of West Vancouver
- Status of proposed safety improvements to the Spirit Trail alongside Welch Street (http://wiki.bikehub.ca/northshore/images/1/1a/Spirit_Trail_Improvements_3-08-18.pdf)
- Update on sidewalk widening on the Welch Street bridge over the Capilano River
- 17 October meeting with District transportation staff **East end of Keith Road to 3rd Street
City of North Vancouver
- Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.