Meeting Agenda: Sept 6, 2018: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
No edit summary
imported>Peter Scholefield
No edit summary
Line 19: Line 19:
***http://wiki.bikehub.ca/northshore/images/9/9b/2018-_20_in_20_Infrastructure_Challenge_Backgrounder_%2805-09%29.pdf http://wiki.bikehub.ca/northshore/images/8/89/DWV_list_of_20_quick_fixes_2018-07-10.jpg
***http://wiki.bikehub.ca/northshore/images/9/9b/2018-_20_in_20_Infrastructure_Challenge_Backgrounder_%2805-09%29.pdf http://wiki.bikehub.ca/northshore/images/8/89/DWV_list_of_20_quick_fixes_2018-07-10.jpg
**Update to North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf. The printed printed version should be available sometime in September.
**Update to North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf. The printed printed version should be available sometime in September.
** status of Letter to send on NS Road Safety Act (Don P)
**Status of Letter to send on NS Road Safety Act (Don P)


'''District of North Vancouver'''
'''District of North Vancouver'''
* Results of 5 Sept meeting with Doug Hyde on Phibbs Exchange Designs
*Results of 5 Sept meeting with Doug Hyde on Phibbs Exchange Designs
*Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf)
*Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf)
*Highway 1/Lower Lynn Improvements Project
*Highway 1/Lower Lynn Improvements Project
Line 33: Line 33:
'''City of North Vancouver'''
'''City of North Vancouver'''
*Brian Patterson - Municipal Leaders Ride
*Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.
*Results of meeting between HUB-NS and City of North Vancouver Engineering, Parks and Environment staff.
*City of North Vancouver Traffic Engineering Contact and Construction Brochure -
*City of North Vancouver Traffic Engineering Contact and Construction Brochure - http://wiki.bikehub.ca/northshore/index.php?title=File:Bike_Construction_Brochure_final-1.pdf
.
*Marine Drive East between Fell and Bewicke
*Marine Drive East between Fell and Bewicke
*Grand Boulevard Intersection connections
*Grand Boulevard Intersection connections
*Brian Patterson - Municipal Leaders Ride
*North Shore Bike Map back on the table - input on routes

Revision as of 15:50, 1 September 2018

HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

Reference Items:

Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf
Agenda:

  • Introductions
  • Agenda additions

District of North Vancouver

District of West Vancouver

City of North Vancouver