Meeting Agenda: Sept 6, 2018: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
No edit summary
imported>Peter Scholefield
No edit summary
Line 25: Line 25:
*Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf)
*Possible improvements to the east approach to the Hwy1 bridge over the Capilano River (http://wiki.bikehub.ca/northshore/images/7/72/EB_Bikes_on_North_Side_of_Cap_River_Hwy_Bridge.pdf)
*Highway 1/Lower Lynn Improvements Project
*Highway 1/Lower Lynn Improvements Project

*DNV Developments Updates (Fred Rathje)
*DNV Developments Updates (Fred Rathje)
*Lynn Valley Road slip lane bullets and letter for improvement
*Lynn Valley Road slip lane bullets and letter for improvement
Line 36: Line 35:
*Results of meeting between HUB-NS and City of North Vancouver Traffic Engineering
*Results of meeting between HUB-NS and City of North Vancouver Traffic Engineering
*Results of July 15th meeting on plans for the new Harry Jerome Recreation (https://bikehub.ca/civicrm/event/info?id=611&reset=1)
*Results of July 15th meeting on plans for the new Harry Jerome Recreation (https://bikehub.ca/civicrm/event/info?id=611&reset=1)
*Lynn Valley Road improvements.
*Marine Drive East between Fell and Bewicke
*Marine Drive East between Fell and Bewicke
*Grand Boulevard Intersection connections
*Grand Boulevard Intersection connections

Revision as of 01:47, 1 September 2018

HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

Reference Items:

Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf
Agenda:

  • Introductions
  • Agenda additions

District of North Vancouver

District of West Vancouver

City of North Vancouver

  • Results of meeting between HUB-NS and City of North Vancouver Traffic Engineering
  • Results of July 15th meeting on plans for the new Harry Jerome Recreation (https://bikehub.ca/civicrm/event/info?id=611&reset=1)
  • Lynn Valley Road improvements.
  • Marine Drive East between Fell and Bewicke
  • Grand Boulevard Intersection connections
  • North Shore Bike Map back on the table - input on routes