Meeting Summary: May 10, 2018: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
No edit summary
imported>Peter Scholefield
No edit summary
Line 30: Line 30:
** Despite our call for a wider crossing, we have been told that in the engineering peer review it was found not to be possible so they are going to go ahead with a 3.5 m wide MUP.
** Despite our call for a wider crossing, we have been told that in the engineering peer review it was found not to be possible so they are going to go ahead with a 3.5 m wide MUP.
*752 Marine Drive Public hearing on 7 May - http://wiki.bikehub.ca/northshore/images/e/ee/752-Marine-Drive-West-Vancouver-Park-Royal-South_image.jpg.
*752 Marine Drive Public hearing on 7 May - http://wiki.bikehub.ca/northshore/images/e/ee/752-Marine-Drive-West-Vancouver-Park-Royal-South_image.jpg.
** In addition to the HUB letter Peter attended and spoke in support of the development at the public hearing shere a decision was delay until the next council meeting.
** In addition to the HUB letter, Peter attended and spoke in support of the development at the public hearing where a decision was delayed until the next council meeting.
*Results of the Horseshoe Bay BC Ferries terminal workshop on April 23 - survey at the project website at bcferries.com/about/hsbvision until May 31.
*Results of the Horseshoe Bay BC Ferries terminal workshop on April 23 - survey at the project website at bcferries.com/about/hsbvision until May 31.
** Fred attended the workshop and provided some cycling input.
** Fred attended the workshop and provided some cycling input.

Revision as of 06:29, 9 June 2018

District of North Vancouver

  • Highway 1/Lower Lynn Improvements Project
    • Results of information sessions on 14 and 17 April
  • 2018 repaving list – (http://wiki.bikehub.ca/northshore/images/2/23/2018_paving_map.pdf).
    • We should gather comments on the segments listed below using our yahoo group, and discuss/approval a draft at our May meeting and then submit them with a request to see the plans for cycle improvements to be included as part of these repaving projects.
    • Paving segments in the 2012 Bicycle Master Plan:
      • 29th Street – DNV currently has a comment open on there website. We should continue to encourage people to contribute. Also HUB NS should submit an official letter with our recommendations. http://www.dnv.org/news/share-your-thoughts-proposed-e29th-st-safety-improvements
      • Highlands Blvd – DNV currently has a pilot on this segment. HUB NS should submit an official letter with our recommendations. http://www.dnv.org/property-development/current-bike-lane-pilot-projects
      • Queens - DNV currently has a pilot on this segment. HUB NS should submit an official letter with our recommendations. http://www.dnv.org/property-development/current-bike-lane-pilot-projects
      • Mountain Hwy - 1250 Mtn Hwy to 14th St. Steep, narrow S turn on busy road. ask for protected bike lanes, to connect to new Mtn HWY overpass.
      • West 15th/Roosevelt St – 2 block segment Pemberton to McKay Creek(CNV), needs review, ask for protected bike lanes, to be extended later?
      • Spicer – 1 block on-road segment that connects 2 off-road segments, request protected bike lanes?
      • Arbourlynn Drive – short segment Hoskins to 20th, needs review, ask for protected bike lanes, to be extended later?
      • Philip – 1 block on residential street. Any improvements needed? Connection to the underpass?

District of West Vancouver

  • Welch St_Bridge_over Capilano River - Media:2018-04-23_DWV_WelchSt_Bridge_CapilanoRiver.pdf
    • Despite our call for a wider crossing, we have been told that in the engineering peer review it was found not to be possible so they are going to go ahead with a 3.5 m wide MUP.
  • 752 Marine Drive Public hearing on 7 May - http://wiki.bikehub.ca/northshore/images/e/ee/752-Marine-Drive-West-Vancouver-Park-Royal-South_image.jpg.
    • In addition to the HUB letter, Peter attended and spoke in support of the development at the public hearing where a decision was delayed until the next council meeting.
  • Results of the Horseshoe Bay BC Ferries terminal workshop on April 23 - survey at the project website at bcferries.com/about/hsbvision until May 31.
    • Fred attended the workshop and provided some cycling input.
    • Peter will draft a HUB letter.

Bowen Island

City of North Vancouver

  • 13th St E between Lonsdale and St. George's has been completed.
  • Results of open house on 26 April re the proposed new Harry Jerome Recreation Centre.
  • Update on Green Necklace.