Meeting Agenda: May 10, 2018: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Peter Scholefield
No edit summary
imported>Peter Scholefield
No edit summary
Line 1: Line 1:

Annual Action Plan for Committee
HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).
HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info
Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info

*Introductions
*Introductions
*Agenda additions
*Agenda additions
*Annual Action Plan for Committee
*20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
*20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
*Events: (http://wiki.bikehub.ca/northshore/images/5/50/2018_Events_overview.pdf)
*Events: (http://wiki.bikehub.ca/northshore/images/5/50/2018_Events_overview.pdf)
Line 39: Line 38:
*13th St E between Lonsdale and St. George's
*13th St E between Lonsdale and St. George's
*Results of open house on 26 April re the proposed new Harry Jerome Recreation Centre.
*Results of open house on 26 April re the proposed new Harry Jerome Recreation Centre.
**Update on Green Necklace.
**Update on Green Necklace.

*13th St E between Lonsdale and St. George's - southside development and Bike Master Plan Implementation update
*W. 1st work to install sidewalks. Work does not include funding for bike lanes, but future work is possible additional consultation required.
'''Ministry of Transportation and Infrastructure'''
*Lower Lynn Interchanges project update
*Phibbs Exchange Update
*BC Ferries Committee Formation [2](https://www.bcferries.com/about/hsbvision/)
'''Other Letters or Actions Required'''
*2012 Bike Masterplan Updates: 3rd Street / 2nd Street / Mahon -> Planned for 2018
*HUB Structure and Sub-Committee Focus - discuss rotating chairs and note takers

Revision as of 01:55, 9 May 2018

HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor). Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info

District of North Vancouver

  • Highway 1/Lower Lynn Improvements Project
    • Results of information sessions on 14 and 17 April
  • 2018 repaving list – (http://wiki.bikehub.ca/northshore/images/2/23/2018_paving_map.pdf).
    • We should gather comments on the segments listed below using our yahoo group, and discuss/approval a draft at our May meeting and then submit them with a request to see the plans for cycle improvements to be included as part of these repaving projects.
    • Paving segments in the 2012 Bicycle Master Plan:
      • 29th Street – DNV currently has a comment open on there website. We should continue to encourage people to contribute. Also HUB NS should submit an official letter with our recommendations. http://www.dnv.org/news/share-your-thoughts-proposed-e29th-st-safety-improvements
      • Highlands Blvd – DNV currently has a pilot on this segment. HUB NS should submit an official letter with our recommendations. http://www.dnv.org/property-development/current-bike-lane-pilot-projects
      • Queens - DNV currently has a pilot on this segment. HUB NS should submit an official letter with our recommendations. http://www.dnv.org/property-development/current-bike-lane-pilot-projects
      • Mountain Hwy - 1250 Mtn Hwy to 14th St. Steep, narrow S turn on busy road. ask for protected bike lanes, to connect to new Mtn HWY overpass.
      • West 15th/Roosevelt St – 2 block segment Pemberton to McKay Creek(CNV), needs review, ask for protected bike lanes, to be extended later?
      • Spicer – 1 block on-road segment that connects 2 off-road segments, request protected bike lanes?
      • Arbourlynn Drive – short segment Hoskins to 20th, needs review, ask for protected bike lanes, to be extended later?
      • Philip – 1 block on residential street. Any improvements needed? Connection to the underpass?

District of West Vancouver

Bowen Island

  • now on ungap the map and an area for growth

City of North Vancouver

  • 13th St E between Lonsdale and St. George's
  • Results of open house on 26 April re the proposed new Harry Jerome Recreation Centre.
    • Update on Green Necklace.