Meeting Agenda: Sept 6, 2018: Difference between revisions
Jump to navigation
Jump to search
imported>Peter Scholefield No edit summary |
imported>Peter Scholefield No edit summary |
||
Line 20: | Line 20: | ||
**Update to North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf. The printed printed version should be available sometime in September. |
**Update to North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf. The printed printed version should be available sometime in September. |
||
** status of Letter to send on NS Road Safety Act (Don P) |
** status of Letter to send on NS Road Safety Act (Don P) |
||
**Family Streetwise Cycling courses in North Vancouver |
|||
***August 12th, 9:30-12:30 @ Parkgate Community Centre - link to register |
|||
https://bikehub.ca/civicrm/event/info?id=612&reset=1 |
|||
'''District of North Vancouver''' |
'''District of North Vancouver''' |
||
* Possible improvements to the east approach to the Hwy1 bridge over the Capilano River () |
|||
*Highway 1/Lower Lynn Improvements Project |
*Highway 1/Lower Lynn Improvements Project |
||
*W 1st protected bike lane behind parking in front of water treatment plant - Tony to update |
*W 1st protected bike lane behind parking in front of water treatment plant - Tony to update |
Revision as of 01:26, 1 September 2018
HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).
Reference Items:
- Link for HUB Cycling NS mailing list: https://groups.yahoo.com/neo/groups/hub-nshore/info
- Letters sent sicne the last meeting on 12 July: Media:2018-08-05_CNV_BikeValets.pdf
Media:2018-07-28_MOTI_LowerLynnInterchange_Phase3.pdf
Agenda:
- Introductions
- Agenda additions
- Events: (http://wiki.bikehub.ca/northshore/images/5/50/2018_Events_overview.pdf)
- Coho Festival on 9 Sept
- There is a HUB NS calendar which can be incorporated into a calendar program: https://calendar.google.com/calendar/ical/hub.ns.events%40gmail.com/public/basic.ics
- General Items
- transition to the replacement of our chair and vice-chair.
- Annual Action Plan for Committee - http://wiki.bikehub.ca/northshore/images/3/36/2018_future_DWV_cycling_infrastructure_projects.pdf
- 20 in 20 Infrastructure Challenge - http://wiki.bikehub.ca/northshore/index.php?title=File:2018-_20_in_20_Infrastructure_Challenge_Backgrounder_(DRAFT-05-03).pdf
- Update to North Shore Bike Map - a link to the digital version is on our wiki in the Resources section and is here: http://wiki.bikehub.ca/northshore/images/a/a2/North_Shore_Bike_Map_July_2018.pdf. The printed printed version should be available sometime in September.
- status of Letter to send on NS Road Safety Act (Don P)
District of North Vancouver
- Possible improvements to the east approach to the Hwy1 bridge over the Capilano River ()
- Highway 1/Lower Lynn Improvements Project
- W 1st protected bike lane behind parking in front of water treatment plant - Tony to update
- 2018 repaving list – (http://wiki.bikehub.ca/northshore/images/2/23/2018_paving_map.pdf)
- DNV Developments Updates (Fred Rathje)
- Lynn Valley Road slip lane bullets and letter for improvement
District of West Vancouver
- status of proposed safety improvement to the Spirit Trail alongside Welch Street
- DWV UnGapThemap updates
City of North Vancouver
- Meeting with new transportation folks Carl and Kliment - when?
- Results of July 15th meeting on plans for the new Harry Jerome Recreation (https://bikehub.ca/civicrm/event/info?id=611&reset=1)
- Marine Drive East between Fell and Bewicke
- Grand Boulevard Intersection connections
- North Shore Bike Map back on the table - input on routes