HUB Tri-Cities Successes: Difference between revisions

From committees
Jump to navigation Jump to search
No edit summary
No edit summary
 
(41 intermediate revisions by the same user not shown)
Line 1: Line 1:
[[Tri-Cities_Committee_Wiki|Return to Tri-Cities Committee Wiki]]
[[Tri-Cities_Committee_Wiki|Return to Tri-Cities Committee Wiki]]


[[File:HUB_Achievements_2024-03-23.jpg| border | 500px | link=https://umap.openstreetmap.fr/en/map/hub-cycling-tri-cities-successes_1022290]]
This list is only partial.


This list is only partial. Please see our map at the link above, and a more formatted version of the below table [https://docs.google.com/spreadsheets/d/1H4zx0lWlLXFPT-r31TIEopCzW_NDMFzA/edit?usp=sharing&ouid=108744348386878199986&rtpof=true&sd=true at the link here]
King Albert Greenway from Porter Street to Hillcrest Street, connecting to the existing greenway from Porter Street to Blue Mountain Street, 2020


{| class="wikitable sortable"
Multi-use path built on Gatensbury Road linking Port Moody and Coquitlam and connecting schools, downtown Port Moody, a Skytrain station and the West Coast Express (2019 Infrastructure Improvement Award)
|+ HUB Cycling Tri-Cities Successes

|-
Riverview multi-use path connects Colony Farm in the south with Coquitlam Centre in the north (2019)
! Name !! Infrastructure Type !!City !! Route End !!Route Start !! Year

|-
Heritage Mountain extension completed with separated bicycle facilities from Turner Creek Drive to David Avenue (2019)
|-St. Johns St MUP||Multi-Use Pathway||Port Moody||Albert Street||Moody Street|| 2024

|-
Murray Street multi-use path extension completed from Electronic Avenue to Hugh Street (2019)
| [[Media:Murray_Bollard_Before_After.jpg|Murray Street Bollard Removal]] || Spot Improvement || Port Moody || NA ||NA ||2024

|-
Sheep Paddocks Trail reopened, connecting Pitt River Road to Colony Farm (2019)
| Maze Gate Removal - Coquitlam||Program||Coquitlam||City-Wide||City-Wide||2023-Present

|-
New access ramp connecting bike facilities on the Moody Street Overpass to the Moody Centre SkyTrain station (2019)
| Maze Gate Removal - Port Coquitlam||Program||Port Coquitlam||City-Wide||City-Wide||2023-Present

|-
Dogwood Fairview Citywide Greenway multi-use path built connecting Burquitlam and Lougheed neighbourhoods (2018)
| Gatensbury Multi-Use Pathway||Multi-Use Pathway||Coquitlam||Port Moody Border||Regan Avenue||2023

|-
Murray overpass, Port Moody (Ped/bike overpass to Rocky Point, completed March 2014)
| Guildford Greenway - Phase 1||Protected Bike Lane||Coquitlam||Johnson Street||Port Moody Border||2023

|-
United Boulevard from New West to King Edward (Sept 2013). MUP plus on road bike lanes.
| Lougheed Highway Multi-Use Pathway - North Side||Multi-Use Pathway||Coquitlam||Westwood Street||Pinetree Way||2023

|-
Lougheed bike lanes PMH1 (King Edward to Colony farms, completed August 2013)
| Lougheed Highway Multi-Use Pathway - South Side||Multi-Use Pathway||Coquitlam||Christmas Way||Barnet Highway||2023

|-
Regan Grover temporary MUP in Como Lake park (spring 2013). This is a temporary fix pending the creation the proposed Regan/Grover on-road bike route.
| Maze Gate Removal - Belcarra Regional Park||Program||Belcarra Regional Park||Belcarra Regional Park||Belcarra Regional Park||2023

|-
Guildford extension in Port Moody (fall 2012)
| Sumiqwuelu Pathway Signage & Chain Removal||On-Street Bikeway||Coquitlam||Colony Farm Road||Orchid Drive||2023

|-
Murray Avenue bike lane and MUP (fall 2012)
| United Boulevard Multi-Use Pathway||Multi-Use Pathway||Coquitlam||King Edward Street||15 King Edward Street||2023

|-
Broadway bike lanes, Port Coquitlam (2012)
| Watson Road Maze Gate Removal || Spot Improvement||Belcarra||Watson Road||Tatlow Trail||2023

|-
King Edward overpass bike lanes and MUP, Coquitlam (2012)
| Curb Ramp at David Place Coquitlam River Trailheads||Spot Improvement||Coquitlam||||||2022

|-
Poirier MUP, Coquitlam (2012)
| Prairie Avenue Multi-Use Pathway||Multi-Use Pathway||Port Coquitlam||Burns Road||Coast Meridian Road||2022

|-
David Avenue extension to Port Moody (2012)
| Coquitlam Bike Parking Minimums||Policy||Coquitlam||City-Wide||City-Wide||2021

|-
PoCo trail pedestrian signal at Shaughnessy (fall 2012)
| King Albert Greenway Multi-Use Pathway||Multi-Use Pathway||Coquitlam||Hillcrest Street||Blue Mountain Street||2021
|-
| Lougheed Highway Multi-Use Pathway - South Side||Multi-Use Pathway||Coquitlam||Westwood Street||Christmas Way||2020
|-
| Gatensbury Gasp Multi-Use Pathway||Multi-Use Pathway||Port Moody||Coquitlam Border||Henry Street||2019
|-
| Heritage Mountain Painted Bike Lane||Painted Bike Lane||Port Moody||Turner Creek Drive||Ioco Road||2019
|-
| Lougheed Greenway Multi-Use Pathway||Multi-Use Pathway||Coquitlam||Palm Terrace||Coquitlam Central Station||2019
|-
| Moody Centre Station Access Ramp||Multi-Use Pathway||Port Moody||Moody Centre Station Parking Lot||Moody Street||2019
|-
| Murray Street Protected Bike Lanes||Protected Bike Lane||Port Moody||Electronic Avenue||Moody Street||2019
|-
| Sheep Paddocks Trail Multi-Use Pathway||Multi-Use Pathway||Coquitlam||Mundy Creek Trail||Pitt River Road||2019
|-
| Dogwood-Fairview Greenway||On-Street Bikeway||Coquitlam||Brookmere Avenue||Morrison Avenue||2018
|-
| Moody Street Overpass Multi-Use Pathway||Multi-Use Pathway||Port Moody||Murray Street||Clarke Street||2014
|-
| Lougheed Highway Bike Lanes||Painted Bike Lane||Coquitlam||King Edward||Colony Farm Road||2013
|-
| Regan-Grover Tree Removal||Spot Improvement||Coquitlam||||||2013
|-
| United Boulevard Multi-Use Pathway||Multi-Use Pathway||Coquitlam||15 King Edward Street||New Westminster||2013
|-
| Broadway Bike Lanes||Painted Bike Lane||Port Coquitlam||Mary Hill Bypass||Kingsway Avenue||2012
|-
| David Avenue Multi-Use Pathway||Multi-Use Pathway||Coquitlam||Pinetree Way||Noons Creek Drive||2012
|-
| Guildford Way Painted Bike Lanes||Painted Bike Lane||Port Moody||Ioco Road||Coquitlam Border||2012
|-
| King Edward Overpass Multi-Use Pathway||Multi-Use Pathway||Coquitlam||United Boulevard||Lougheed Highway||2012
|-
| Murray Street Multi-Use Pathway||Multi-Use Pathway||Port Moody||Electronic Avenue||Ioco Road||2012
|-
| Poirer Street Multi-Use Pathway||Multi-Use Pathway||Coquitlam||King Albert Avenue||Regan Avenue||2012
|-
| Shaughnessy/Mary Hill Bike Signal||Spot Improvement||Port Coquitlam||||||2012
|}

Latest revision as of 06:58, 10 November 2024

Return to Tri-Cities Committee Wiki

HUB Achievements 2024-03-23.jpg

This list is only partial. Please see our map at the link above, and a more formatted version of the below table at the link here

HUB Cycling Tri-Cities Successes
Name Infrastructure Type City Route End Route Start Year
Murray Street Bollard Removal Spot Improvement Port Moody NA NA 2024
Maze Gate Removal - Coquitlam Program Coquitlam City-Wide City-Wide 2023-Present
Maze Gate Removal - Port Coquitlam Program Port Coquitlam City-Wide City-Wide 2023-Present
Gatensbury Multi-Use Pathway Multi-Use Pathway Coquitlam Port Moody Border Regan Avenue 2023
Guildford Greenway - Phase 1 Protected Bike Lane Coquitlam Johnson Street Port Moody Border 2023
Lougheed Highway Multi-Use Pathway - North Side Multi-Use Pathway Coquitlam Westwood Street Pinetree Way 2023
Lougheed Highway Multi-Use Pathway - South Side Multi-Use Pathway Coquitlam Christmas Way Barnet Highway 2023
Maze Gate Removal - Belcarra Regional Park Program Belcarra Regional Park Belcarra Regional Park Belcarra Regional Park 2023
Sumiqwuelu Pathway Signage & Chain Removal On-Street Bikeway Coquitlam Colony Farm Road Orchid Drive 2023
United Boulevard Multi-Use Pathway Multi-Use Pathway Coquitlam King Edward Street 15 King Edward Street 2023
Watson Road Maze Gate Removal Spot Improvement Belcarra Watson Road Tatlow Trail 2023
Curb Ramp at David Place Coquitlam River Trailheads Spot Improvement Coquitlam 2022
Prairie Avenue Multi-Use Pathway Multi-Use Pathway Port Coquitlam Burns Road Coast Meridian Road 2022
Coquitlam Bike Parking Minimums Policy Coquitlam City-Wide City-Wide 2021
King Albert Greenway Multi-Use Pathway Multi-Use Pathway Coquitlam Hillcrest Street Blue Mountain Street 2021
Lougheed Highway Multi-Use Pathway - South Side Multi-Use Pathway Coquitlam Westwood Street Christmas Way 2020
Gatensbury Gasp Multi-Use Pathway Multi-Use Pathway Port Moody Coquitlam Border Henry Street 2019
Heritage Mountain Painted Bike Lane Painted Bike Lane Port Moody Turner Creek Drive Ioco Road 2019
Lougheed Greenway Multi-Use Pathway Multi-Use Pathway Coquitlam Palm Terrace Coquitlam Central Station 2019
Moody Centre Station Access Ramp Multi-Use Pathway Port Moody Moody Centre Station Parking Lot Moody Street 2019
Murray Street Protected Bike Lanes Protected Bike Lane Port Moody Electronic Avenue Moody Street 2019
Sheep Paddocks Trail Multi-Use Pathway Multi-Use Pathway Coquitlam Mundy Creek Trail Pitt River Road 2019
Dogwood-Fairview Greenway On-Street Bikeway Coquitlam Brookmere Avenue Morrison Avenue 2018
Moody Street Overpass Multi-Use Pathway Multi-Use Pathway Port Moody Murray Street Clarke Street 2014
Lougheed Highway Bike Lanes Painted Bike Lane Coquitlam King Edward Colony Farm Road 2013
Regan-Grover Tree Removal Spot Improvement Coquitlam 2013
United Boulevard Multi-Use Pathway Multi-Use Pathway Coquitlam 15 King Edward Street New Westminster 2013
Broadway Bike Lanes Painted Bike Lane Port Coquitlam Mary Hill Bypass Kingsway Avenue 2012
David Avenue Multi-Use Pathway Multi-Use Pathway Coquitlam Pinetree Way Noons Creek Drive 2012
Guildford Way Painted Bike Lanes Painted Bike Lane Port Moody Ioco Road Coquitlam Border 2012
King Edward Overpass Multi-Use Pathway Multi-Use Pathway Coquitlam United Boulevard Lougheed Highway 2012
Murray Street Multi-Use Pathway Multi-Use Pathway Port Moody Electronic Avenue Ioco Road 2012
Poirer Street Multi-Use Pathway Multi-Use Pathway Coquitlam King Albert Avenue Regan Avenue 2012
Shaughnessy/Mary Hill Bike Signal Spot Improvement Port Coquitlam 2012