Spirit Trail 2023: Difference between revisions
Ruebenschulz (talk | contribs) (→Spirit Trail Photo Project: Add section B) |
Ruebenschulz (talk | contribs) |
||
(9 intermediate revisions by the same user not shown) | |||
Line 18: | Line 18: | ||
Leaving aside issues with MUPs (not so good for fast cycling, mixing people traveling at different speeds, etc), the trail provides a safe, connected, east/west route through the lower North Shore from Park and Tilford Mall to Ambleside Park. I know one person who will only bike on a fully protected lane like the Spirit Trail, and often see parents biking with their kids along it, often transporting them on cargo bikes. |
Leaving aside issues with MUPs (not so good for fast cycling, mixing people traveling at different speeds, etc), the trail provides a safe, connected, east/west route through the lower North Shore from Park and Tilford Mall to Ambleside Park. I know one person who will only bike on a fully protected lane like the Spirit Trail, and often see parents biking with their kids along it, often transporting them on cargo bikes. |
||
I broke the trail into 11 sections (A to K). Photos are from September 2023 and organized travelling from east to west. |
I broke the trail into 11 sections (labeled A to K). Photos are from September 2023 and organized travelling from east to west. |
||
[[File:0 Map2 east anotated.png|thumb|left|Map of the east end of the Spirit Trail, showing sections A to G.]] |
[[File:0 Map2 east anotated.png|thumb|left|Map of the east end of the Spirit Trail, showing sections A to G.]] |
||
Line 30: | Line 29: | ||
* [https://www.cnv.org/parks-recreation/parks-greenways/greenways/north-shore-spirit-trail City of North Vancouver - North Shore Spirit Trail] |
* [https://www.cnv.org/parks-recreation/parks-greenways/greenways/north-shore-spirit-trail City of North Vancouver - North Shore Spirit Trail] |
||
* [https://www.dnv.org/streets-transportation/spirit-trail-eastern-extension District of North Vancouver] |
* [https://www.dnv.org/streets-transportation/spirit-trail-eastern-extension District of North Vancouver - Spirit Trail Eastern Extension] |
||
* [https://westvancouver.ca/government-administration/major-projects/spirit-trail-horseshoe-bay-village-portion District of West Vancouver] |
|||
* [https://westvancouver.ca/government-administration/major-projects/spirit-trail-horseshoe-bay-village-portion District of West Vancouver - Spirit Trail Horseshoe Bay Village Portion] |
|||
==Rona to Bridge over 3rd Street== |
==Rona to Bridge over 3rd Street== |
||
Line 53: | Line 51: | ||
</tr> |
</tr> |
||
</table> |
</table> |
||
==Moodyville Park== |
==Moodyville Park== |
||
Section B. This section of the |
Section B. This section of the Spirit Trail crosses 3rd Street on a bridge and passes through Moodyville Park. It provides a safer alternative to the 3rd Street Hill or the Low Level Road. The bridge provides a view point for the train yard, Burnaby Mountain, and our local coal pile. |
||
<table> |
<table> |
||
Line 68: | Line 67: | ||
</tr> |
</tr> |
||
</table> |
</table> |
||
==2nd Street to St Georges== |
|||
Section C. This portion of the Spirit Trail is mostly on side streets between Moodyville Park and St David's Ave and there are a few different routes you can take, including a suspension bridge that is only suitable for walking. West of St Davids Ave it is the standard separated MUP. |
|||
Travelling through this area you can hear the hum of the granaries and the noise of new condos being built. A few solitary houses remain from the old Moodyville neighbourhood. |
|||
Between St Patricks and St Georges Avenues the trail passes six brew pubs in the Brewery District. |
|||
<table> |
|||
<tr> |
|||
<td>[[File:C1 IMG 5492.jpg|thumb|Two people biking eastward where 1st and 2nd Streets meet. Here the Spirit Trail is located on the road and is not a proper separated MUP. In the background is a granary and beside the cyclists is a temporary community garden (which will eventually be replaced with condos).]] |
|||
<td>[[File:C2 IMG 5493.jpg|thumb|A short connecting path between 1st Street and Alder Street. This section has some switchback corners, but a desire line indicates most people just prefer to go straight up and down the little hill.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:C3 IMG 5497.jpg|thumb|Two people biking along Alder Street. A granary is in the background on the left side. Most houses along Alder Street were demolished for a future redevelopment. ]] |
|||
<td>[[File:C4 IMG 5508.jpg|thumb|Two young people on electric scooters near the St Patricks Ave section of the trail. This section is a separated MUP. Some housing towers from Esplanade Street are in the far background and farther in the background is Black Mountain (Cypress Bowl) in West Vancouver.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:C5 IMG 5513.jpg|thumb|People starting to cross Esplanade Street at St Andrews Ave. There are a mix of cyclists and walkers. Some of the brew pubs are on the right on the east end of Esplanade Street.]] |
|||
<td>[[File:C6 IMG 5519.jpg|thumb|The Spirit Trail MUP along Esplanade Street between St Andrews and St Georges Avenues. Housing towers from Esplanade and the Shipyard are in the background. A separated eastbound bike lane along Esplanade Street, that connects to the Low Road, is parallel to the MUP on this block.]] |
|||
</tr> |
|||
</table> |
|||
==Shipyard and Quay== |
|||
Section D. The Shipyard is a very active public space and this portion of the Spirit Trail, while having beautiful waterfront views, can be a bit hectic to bike through. |
|||
The Friday Night market is very popular in the summer and many events have a bike valet. |
|||
Depending on the foot traffic, you may have to slow right down when cruising by the Polygon Gallery. I generally use the new bike lane on Esplanade Street to avoid this section of the Spirit Trail and re-join the trail at Chesterfield Ave. |
|||
<table> |
|||
<tr> |
|||
<td>[[File:D1 IMG 5523.jpg|thumb|Trail over bridge, with people walking in the mid-ground. The Lonsdale Quay "Q" can be seen in the background.]] |
|||
<td>[[File:D2 IMG 5524.jpg|thumb|The Spirit Trail in front of the Joey Shipyards restaurant. An old, yellow shipyard crane is in the background.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:D3 IMG 5525.jpg|thumb|Trail next to the Tap and Barrel restaurant. Lonsdale Quay building and Polygon Gallery in the background.]] |
|||
<td>[[File:D4 IMG 5526.jpg|thumb|Two people cycling past the Polygon Gallery, through a sea of pedestrians.]] |
|||
</tr> |
|||
</table> |
|||
==Quay to Waterfront Park== |
|||
Section E. Starting at the Lonsdale Quay, this section of the Spirit Trail passes the Lonsdale Bus Loop and Seabus terminal and continues behind Waterfront Park. |
|||
The recent bus loop upgrade did not improve the bike parking much and only added some uncovered bike racks. But some bike boxes were later installed just west of the Seabus terminal. |
|||
For a more scenic route you can go south on Chesterfield Ave and meander along the waterfront through the park. |
|||
<table> |
|||
<tr> |
|||
<td>[[File:E1 IMG 5532.jpg|thumb|People walking their bikes next to the crosswalk over Carrie Cates Ct. This is behind the Lonsdale Quay, with the ICBC building in the background.]] |
|||
<td>[[File:E2 IMG 5534.jpg|thumb|Trail though a "tunnel" under the ICBC building, beside the bus loop.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:E3 IMG 5539.jpg|thumb|Two people cycling at the Spirit Trail crossing before Chesterfield Ave. Heading straight takes a shortcut through Waterfront Park. Turning left here connects to Waterfront Park.]] |
|||
<td>[[File:E4 IMG 5546.jpg|thumb|A cyclist biking through Waterfront Park, parallel to the train tracks.]] |
|||
</tr> |
|||
</table> |
|||
==Mosquito Creek Marina== |
|||
Section F. Probably the most expensive section of the Spirit Trail to build, but the connection through the Squamish Nation's Mosquito Creek Marina is worth it (and shortens my commute). This section can be very busy with foot traffic on a sunny weekend. |
|||
Before this section was built, people needed to head up Forbes Ave and travel along 3rd and 2nd streets. |
|||
The main physical impediment to building this section was the marina boat lift. The solution was to route the trail under the boat lift, requiring the construction of a dam. A window in the dam allows you to look through the water at high tide. |
|||
<table> |
|||
<tr> |
|||
<td>[[File:F1 IMG 5548.jpg|thumb|Entrance to the Mosquito Creek Marina section of the Spirit Trail. A group of people is biking under the Gateway called "Gateway to Ancient Wisdom".]] |
|||
<td>[[File:F2 IMG 5583.jpg|thumb|People biking and walking along the Spirit Trail through the Marina. Marina is on the left and Grouse Mountain is in the background to the right.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:F3 IMG 5568.jpg|thumb|A person biking around people walking on the Spirit Trail. Floating homes in the Marina are on the left. Unfortunately, the nice tree in the background was cut down after this photo was taken.]] |
|||
<td>[[File:F4 IMG 5562.jpg|thumb|Spirit Trail under the Marina boat lift. There is a colourful mural on the walls.]] |
|||
</tr> |
|||
</table> |
|||
==Harbourside Drive / Kings Mill Park== |
|||
Section G. The Harbourside section connects the Marina to 1st Street. A north/south MUP along Bewicke Ave provides a connection from the Spirit Trail to the 2nd Street bike lane and Keith Road hill. |
|||
This portion passes the Kings Mill Dog Park, Thomas Haas Chocolate shop, and the [https://www.seaspan.com/ Seaspan shipyard] where coastguard and navy ships are under construction. If you stop you may see some [https://en.wikipedia.org/wiki/Heron herons] fishing in McKay Creek. |
|||
The trail was connected with the addition of a bridge over the train tracks at MacKay Rd. The students at Bodwell High chipped in some money for the bridge, since it allowed them a shorter route to walk to the Capilano Mall. |
|||
Currently the trail is detoured along Harbourside Drive for two blocks while the North Harbour development is being constructed. |
|||
<table> |
|||
<tr> |
|||
<td>[[File:G1 IMG 5706.jpg|thumb|Person with a cargo bike crossing Bewicke Ave at the east end of the Mosquito Creek Marina. The Two Red Hand statues form a gateway.]] |
|||
<td>[[File:G2 IMG 5692.jpg|thumb|A group of four people biking through the crossing at Bewicke Ave.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:G3 IMG 5688.jpg|thumb|Two people biking and crossing to the temporary section of the trail on Harbourside Drive.]] |
|||
<td>[[File:G4 IMG 5677.jpg|thumb|A group of kids biking on the Spirit Trail next to the dog walking park.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:G5 IMG 5641.jpg|thumb|A family biking over the bridge above the railway tracks.]] |
|||
<td>[[File:G6 IMG 5649.jpg|thumb|Many people cycling across the crosswalk at 1st Street and MacKay Road. On sunny days there can be long lines of people waiting to cross here.]] |
|||
</tr> |
|||
</table> |
|||
==Norgate (1st Street to Welch)== |
|||
Section H. The Norgate section is one of my friend's favourite parts of the Spirit Trail, since most of it is completely separated from the road and winds through a green space. However, if you want a more direct route you can take Welch Street instead. |
|||
The Spirit Trail connects to a north/south MUP on MacKay Road that provides access to Capilano Mall. West of MacKay Road you are in the District of NorthVan. |
|||
<table> |
|||
<tr> |
|||
<td>[[File:H1 IMG 5748.jpg|thumb|Person cycling over the MacKay Creek bridge. This portion of the Trail is parallel to a bike lane on 1st Street. In the background is a crane at the site of the troubled sewage treatment project.]] |
|||
<td>[[File:H2 IMG 5755.jpg|thumb|People cycling around flex post chicane that were added on Welch Street near Pemberton Ave to slow down cyclists passing businesses.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:H3 IMG 5764.jpg|thumb|One person cycling and a few people walking on the crosswalk across Pemberton Ave. The crosswalk has a circle pattern on it.]] |
|||
<td>[[File:H4 IMG 5768.jpg|thumb|Three people biking past the tennis court in Norgate.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:H5 IMG 5774.jpg|thumb|A group of people walking and biking on the Norgate section of the trail. On the side are two Lime bikes (rental ebikes).]] |
|||
<td>[[File:H6 IMG 5784.jpg|thumb|Two people biking through the Norgate section of the Spirit Trail. There are trees and grass on either side of the trail.]] |
|||
</tr> |
|||
</table> |
|||
==Welch Street to Lions Gate Bridge== |
|||
Section I. This section of the Spirit Trail passes through the Capilano Reserve and is mostly beside Welch Street. The district added speed bumps to slow down cyclists, which results in a lot of roadies favouring Welch Street instead. |
|||
There is a connection near the RV Park to the Lions Gate Bridge, and Stanley Park. |
|||
Unfortunately the old sewage plant under the bridge is still operating and does not smell very good on a hot day. With all the delays, the new plant (south of Norgate) won't be operating for a few more years. |
|||
<table> |
|||
<tr> |
|||
<td>[[File:I1 IMG 5819.jpg|thumb|Two people biking on the trail near Capilano Road. Speed bumps were installed before crossing.]] |
|||
<td>[[File:I2 IMG 5825.jpg|thumb|One person biking on the trail and a large group of road cyclists on Welch Street. Speed bumps on this section at crossings encourage faster riders to use the road instead of the trail.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:I3 IMG 5839.jpg|thumb|Lots of people walking and biking along the Spirit Trail, east of the Lions Gate Bridge. New condos are being built next to the trail on the Capilano Reserve.]] |
|||
<td>[[File:I4 IMG 5865.jpg|thumb|People biking and walking on the trail under the Lions Gate Bridge.]] |
|||
</tr> |
|||
</table> |
|||
==Welch Street Bridge and Park Royal== |
|||
Section J. The new MUP along the Welch Street Bridge connects the North Vancouver District to the West Vancouver sections of the Spirit Trail. It also provides access to the Park Royal Shopping Mall. |
|||
From the bridge you can watch people fish in the Capilano River and take photos of the sun setting behind the railway bridge downstream. |
|||
<table> |
|||
<tr> |
|||
<td>[[File:J1 IMG 5875.jpg|thumb|Two people crossing the street to connect to the bridge over the Capilano River. This is under the Lions Gate Bridge.]] |
|||
<td>[[File:J2 IMG 5883.jpg|thumb|People biking on the new MUP on the bridge over the Capilano River. Park Royal shopping mall is in the background.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:J3 IMG 5899.jpg|thumb|People walking and biking on the Spirit Trail, south of Park Royal Mall.]] |
|||
<td>[[File:J4 IMG 5911.jpg|thumb|Two people biking on the Spirit Trail, south of Park Royal Mall. There is a notice board on the right and a sign about Spirit Trail etiquette on the left.]] |
|||
</tr> |
|||
</table> |
|||
==Ambleside Park== |
|||
Section K. The West end of the Spirit Trail passes under the railway and connects to Ambleside Park. The portion between Park Royal and the railway can be very busy with people heading to the Ambleside Dog Park. |
|||
At Ambleside Pier you can watch people sailing dinghies from the local sailing club. You will occasionally see them capsize, which is mostly intentional practice. |
|||
The trail somewhat continues past 14th Street, but it becomes a one way parking lot west of 14th Street, so I consider this the end for now. |
|||
<table> |
|||
<tr> |
|||
<td>[[File:K1 IMG 5913.jpg|thumb|People biking and walking through the forest south of Park Royal Mall.]] |
|||
<td>[[File:K2 IMG 5918.jpg|thumb|The Spirit Trail next to the Capilano River and passing under the railway bridge.]] |
|||
</tr> |
|||
<tr> |
|||
<td>[[File:K3 IMG 5945.jpg|thumb|People walking across the trail to access Ambleside Park, while two people bike by.]] |
|||
<td>[[File:K4 IMG 5956.jpg|thumb|Two people biking on Lime (rental) bikes next to the Hollyburn Sailing Club. This block of the trail separates bikes and people walking with some planters.]] |
|||
</tr> |
|||
</table> |
|||
==Future of the Spirit Trail== |
|||
In the last 15 years I saw the Spirit Trail go from a concept map, to short disconnected sections, to the fully connected path that it is now. I hope to see the District of North Vancouver complete the [https://www.dnv.org/streets-transportation/spirit-trail-eastern-extension Spirit Trail East Extension] to Deep Cove in a few years. |
|||
I don't know when we will be able to travel from Deep Cove to Horseshoe Bay along a finished Spirit Trail, but I hope one day that the benefits of the existing section will be extended across the entire North Shore. |
Latest revision as of 21:03, 3 March 2024
Spirit Trail Photo Project
Introduction
In September 2023, I did a photo documentary of the North Vancouver Spirit Trail.
North Shore bike infrastructure still has a long way to go before catching up with the Netherlands (or even Downtown Vancouver), but I want to highlight some of the infrastructure we have.
The trail is a multi-use path (MUP) that eventually? will connect Deep Cove to Horseshoe Bay. Currently the trail is mostly complete in the City and parts of District of NorthVan.
Leaving aside issues with MUPs (not so good for fast cycling, mixing people traveling at different speeds, etc), the trail provides a safe, connected, east/west route through the lower North Shore from Park and Tilford Mall to Ambleside Park. I know one person who will only bike on a fully protected lane like the Spirit Trail, and often see parents biking with their kids along it, often transporting them on cargo bikes.
I broke the trail into 11 sections (labeled A to K). Photos are from September 2023 and organized travelling from east to west.
For some more info about the trail see:
Rona to Bridge over 3rd Street
Section A. The East end of the Spirit Trail currently ends/begins behind Park and Tilford Mall and Rona at Gladstone Ave. There is also a short section for the new bridge over Lynn Creek, but I am not counting that since it is not yet connected to the main trail.
The trail winds up a little hill which is fun to bike down.
This section passes Heywood Street, which provides a north/south street connection to East Keith Road.
Moodyville Park
Section B. This section of the Spirit Trail crosses 3rd Street on a bridge and passes through Moodyville Park. It provides a safer alternative to the 3rd Street Hill or the Low Level Road. The bridge provides a view point for the train yard, Burnaby Mountain, and our local coal pile.
2nd Street to St Georges
Section C. This portion of the Spirit Trail is mostly on side streets between Moodyville Park and St David's Ave and there are a few different routes you can take, including a suspension bridge that is only suitable for walking. West of St Davids Ave it is the standard separated MUP.
Travelling through this area you can hear the hum of the granaries and the noise of new condos being built. A few solitary houses remain from the old Moodyville neighbourhood.
Between St Patricks and St Georges Avenues the trail passes six brew pubs in the Brewery District.
Shipyard and Quay
Section D. The Shipyard is a very active public space and this portion of the Spirit Trail, while having beautiful waterfront views, can be a bit hectic to bike through.
The Friday Night market is very popular in the summer and many events have a bike valet.
Depending on the foot traffic, you may have to slow right down when cruising by the Polygon Gallery. I generally use the new bike lane on Esplanade Street to avoid this section of the Spirit Trail and re-join the trail at Chesterfield Ave.
Quay to Waterfront Park
Section E. Starting at the Lonsdale Quay, this section of the Spirit Trail passes the Lonsdale Bus Loop and Seabus terminal and continues behind Waterfront Park.
The recent bus loop upgrade did not improve the bike parking much and only added some uncovered bike racks. But some bike boxes were later installed just west of the Seabus terminal.
For a more scenic route you can go south on Chesterfield Ave and meander along the waterfront through the park.
Mosquito Creek Marina
Section F. Probably the most expensive section of the Spirit Trail to build, but the connection through the Squamish Nation's Mosquito Creek Marina is worth it (and shortens my commute). This section can be very busy with foot traffic on a sunny weekend.
Before this section was built, people needed to head up Forbes Ave and travel along 3rd and 2nd streets.
The main physical impediment to building this section was the marina boat lift. The solution was to route the trail under the boat lift, requiring the construction of a dam. A window in the dam allows you to look through the water at high tide.
Harbourside Drive / Kings Mill Park
Section G. The Harbourside section connects the Marina to 1st Street. A north/south MUP along Bewicke Ave provides a connection from the Spirit Trail to the 2nd Street bike lane and Keith Road hill.
This portion passes the Kings Mill Dog Park, Thomas Haas Chocolate shop, and the Seaspan shipyard where coastguard and navy ships are under construction. If you stop you may see some herons fishing in McKay Creek.
The trail was connected with the addition of a bridge over the train tracks at MacKay Rd. The students at Bodwell High chipped in some money for the bridge, since it allowed them a shorter route to walk to the Capilano Mall.
Currently the trail is detoured along Harbourside Drive for two blocks while the North Harbour development is being constructed.
Norgate (1st Street to Welch)
Section H. The Norgate section is one of my friend's favourite parts of the Spirit Trail, since most of it is completely separated from the road and winds through a green space. However, if you want a more direct route you can take Welch Street instead.
The Spirit Trail connects to a north/south MUP on MacKay Road that provides access to Capilano Mall. West of MacKay Road you are in the District of NorthVan.
Welch Street to Lions Gate Bridge
Section I. This section of the Spirit Trail passes through the Capilano Reserve and is mostly beside Welch Street. The district added speed bumps to slow down cyclists, which results in a lot of roadies favouring Welch Street instead.
There is a connection near the RV Park to the Lions Gate Bridge, and Stanley Park.
Unfortunately the old sewage plant under the bridge is still operating and does not smell very good on a hot day. With all the delays, the new plant (south of Norgate) won't be operating for a few more years.
Welch Street Bridge and Park Royal
Section J. The new MUP along the Welch Street Bridge connects the North Vancouver District to the West Vancouver sections of the Spirit Trail. It also provides access to the Park Royal Shopping Mall.
From the bridge you can watch people fish in the Capilano River and take photos of the sun setting behind the railway bridge downstream.
Ambleside Park
Section K. The West end of the Spirit Trail passes under the railway and connects to Ambleside Park. The portion between Park Royal and the railway can be very busy with people heading to the Ambleside Dog Park.
At Ambleside Pier you can watch people sailing dinghies from the local sailing club. You will occasionally see them capsize, which is mostly intentional practice.
The trail somewhat continues past 14th Street, but it becomes a one way parking lot west of 14th Street, so I consider this the end for now.
Future of the Spirit Trail
In the last 15 years I saw the Spirit Trail go from a concept map, to short disconnected sections, to the fully connected path that it is now. I hope to see the District of North Vancouver complete the Spirit Trail East Extension to Deep Cove in a few years.
I don't know when we will be able to travel from Deep Cove to Horseshoe Bay along a finished Spirit Trail, but I hope one day that the benefits of the existing section will be extended across the entire North Shore.