2019-10-10 Agenda: Difference between revisions

From committees
Jump to navigation Jump to search
imported>Dpiercy
imported>Peter Scholefield
 
(8 intermediate revisions by 4 users not shown)
Line 5: Line 5:
===2019 Objectives ===
===Goals & Objectives ===
*[[media:HUB-NS_2019_Goals_v13.pdf|3 Top Priority Bikeways + Active Transportation Coordinator]]
*2019 Goals: [[media:HUB-NS_2019_Goals_v13.pdf|3 Top Priority Bikeways + Active Transportation Coordinator]]
** Presentations to CNV & DNV
** Presentations Oct 7 to CNV & DNV (in CNV & DNV sections)
* start thinking about gaols for 2020



===General===
===General===
Line 27: Line 27:


===City of North Vancouver - Erika/Heather===
===City of North Vancouver - Erika/Heather===

[[Projects and Council update]]


*'''Walk CNV'''
*'''Walk CNV'''
Line 37: Line 35:
https://www.cnv.org/your-government/mayor-and-council/council-strategic-plan
https://www.cnv.org/your-government/mayor-and-council/council-strategic-plan


'''Esplanade Protected Bike Lanes.'''
*'''Esplanade Protected Bike Lanes.'''
A new protected bike lane will be ready shortly along the Prominade development. This design has room for sidewalk, trees, bike lane, trees then car lane. there will be a textured surface separating the sidewalk and bike lane (similar to Carrall St approaching Expo Blvd in Vancouver) with the street trees between the bike lane and the curb. It will set the precedent for any new lanes.
A new protected bike lane will be ready shortly along the Prominade development. This design has room for sidewalk, trees, bike lane, trees then car lane. there will be a textured surface separating the sidewalk and bike lane (similar to Carrall St approaching Expo Blvd in Vancouver) with the street trees between the bike lane and the curb. It will set the precedent for any new lanes.
A design concept for Esplanade will be presented to council in September. Council will approve or not. If approved the concepts will go to public consultation. HUB will be asked to review more detailed designs.
**A design concept for Esplanade was presented to ITC Oct 2 - HUB has asked for a copy to review.
**Final concept will be presented to council in October - Council will approve or not. If approved the concepts will go to public consultation.


'''New Mosquito Creek Bridge''' there will be wide sidewalks for peds and cyclists and a pathway underneath to connect to the trail, though with the off Marine bike route, the Marine Drive bike lanes are not likely to stay. ** Marine Dr [https://www.cnv.org/Property-and-Development/Projects-and-Developments/Major-Studies-and-Projects/Mosquito-Creek-Bridge-Replacement Mosquito Creek Bridge]
*'''New Mosquito Creek Bridge''' there will be wide sidewalks for peds and cyclists and a pathway underneath to connect to the trail, though with the off Marine bike route, the Marine Drive bike lanes are not likely to stay. ** Marine Dr [https://www.cnv.org/Property-and-Development/Projects-and-Developments/Major-Studies-and-Projects/Mosquito-Creek-Bridge-Replacement Mosquito Creek Bridge]


'''Mackay MUP''' Parking has been removed in some segments. A wide MUP has been constructed on top of the dyke being built for flood mitigation and there will also be bike lanes on both sides with parked car buffers in places. Should be done soon. No sign yet of bike lanes and the MUP itself had not yet been finished as of this past week. Road is in poor condition next to the unpaved part of the MUP. Connection to other side of Marine remains to be seen.
*'''Mackay MUP''' Parking has been removed in some segments. A wide MUP has been constructed on top of the dyke being built for flood mitigation and there will also be bike lanes on both sides with parked car buffers in places. Should be done soon. No sign yet of bike lanes and the MUP itself had not yet been finished as of this past week. Road is in poor condition next to the unpaved part of the MUP. Connection to other side of Marine remains to be seen.


'''New building at 3rd and Chesterfield''' is nearing completion (anyone know the status?) with cycling facility integrated.
*'''New building at 3rd and Chesterfield''' now has an asphalt off-street bike path next to it but as of last Saturday had an obstacle on the path still. North side in front of 7-11 remains a constant issue.


*''' Bikes Mean Business and the Lower Lonsdale BIA Central Lonsdale'''
'''* eBike Share Update'''
Postponed - Staff expect to be able to share more information later this summer.
New North Shore Mobility Options Coordinator, Zach Mathurin He will be the main point of contact for e-bike share on behalf of the three municipalities.

'''* Bikes Mean Business and the Lower Lonsdale BIA Central Lonsdale'''
Engagement and infographic forthcoming.
Engagement and infographic forthcoming.


* Oct 7th - Delegation to Council.
* Oct 7th - Delegation to Council.


* ""[https://www.cnv.org/get-involved/committees/integrated-transportation-committee Integrated Transportation Committee]"" -
* ITC - How do we get HUB representative on this committee - appointments start 1-Feb-2020 for 2 years
**How do we get HUB representative on this committee - appointments start 1-Feb-2020 for 2 years
**We need a representative to attend these monthly meetings
** Brent Hillier is currently on it.
** Brent Hillier is currently on it.


Line 62: Line 59:
* 29th Street protected bike lanes (Tempe Cres to Lynn Valley Rd)
* 29th Street protected bike lanes (Tempe Cres to Lynn Valley Rd)
** work is underway.
** work is underway.
** send thanks you to councillors and those who send supporting emails
** send thank you to councillors and those who sent supporting emails


* Feedback discussion from Council delegation - October 7, 2019
* Feedback discussion from Council delegation - October 7, 2019
**lots of great questions put forward on eBikes, bike lanes on arterials, next steps in bike network expansion, Motor Vehicle Act changes, secure storage options
* Last meeting with Staff- October 8, 2019
* Last meeting with Staff- October 8, 2019
**discussion on potential "Low Level" and "Creek to Peak" route options
**discussion on potential "Low Level" and "Creek to Peak" route options
**integration with MOTI work on Lower Lynn next phases
**integration with MOTI work on Lower Lynn next phases
* New protected bike lanes emerging along new Lynn Valley "Town Centre Connector" extension of 29th past Black Bear and into Safeway area
* Ongoing correspondence with Steve Ono regarding delineators on Riverside Drive - these are generating close passes and driver aggression - request for signage / markings so it is clear bikes may take lane
* Ongoing correspondence with Steve Ono regarding delineators on Riverside Drive - these are generating close passes and driver aggression - request for signage / markings so it is clear bikes may take lane
* 20 in 20 updates?
* 20 in 20 updates?
Line 76: Line 75:
**[[Media:Hugo_Ray_-_looking_west_from_Hwy1_Capilano_bridge_2019-08-08_IMG_2437.JPG|Klee Wyck to 3rd]]
**[[Media:Hugo_Ray_-_looking_west_from_Hwy1_Capilano_bridge_2019-08-08_IMG_2437.JPG|Klee Wyck to 3rd]]
*HUB NS delegation presentation to the mayor and council
*HUB NS delegation presentation to the mayor and council
* Ambleside Waterfront Plan


===Communications & Outreach - Heather/Antje/James/Martyn===

===Communications & Outreach - Heather/Antje/James===
*Channels
*Channels
**Yahoo Group -
**Yahoo Group -
Line 102: Line 99:
*Create a library of good/bad infrastructure on the North Shore
*Create a library of good/bad infrastructure on the North Shore
**Need a volunteer(s) and a list of locations.
**Need a volunteer(s) and a list of locations.



===BC Ferries - Peter S===
===BC Ferries - Peter S===
Line 121: Line 117:
=== MOTI - Antje/Giacomo/Jay===
=== MOTI - Antje/Giacomo/Jay===
*Lions Gate Bridge west sidewalk closure this fall/winter
*Lions Gate Bridge and Causeway project this winter/spring to maintain reversible lane lights system
**Antje met with MOTI staff
**email from MOTI to HUB-NS about upcoming Lions Gate Bridge reversible lane control system upgrade project
**work will take place along the road and on the sidewalks where the electrical boxes are
**west sidewalk will be closed two months
**constrcution management for cyclists will be the same as during the construction of the Causeway pathways
**Antje to arrange meeting with MOTI to provide HUB input to facilitate safe movements of cyclists and pedestrians during the closure
**bridge work will be done only at night and cyclists will be detoured from sidewalk onto car lane closed to car traffic
*Mountain Highway Interchange
*Mountain Highway Interchange
**top lift paving and pavement markings emerging - need to monitor intersection, particularly right-turn-on-red conflicts (HUB had requested a ban on these) as well as sufficient width for bike/trailer combos to navigate protected intersection channels
**top lift paving and pavement markings emerging - need to monitor intersection, particularly right-turn-on-red conflicts (HUB had requested a ban on these) as well as sufficient width for bike/trailer combos to navigate protected intersection channels
Line 137: Line 134:
====RCMP====
====RCMP====
* doing a publicity campaign on Bike Theft & 529
* doing a publicity campaign on Bike Theft & 529
* will join our B2WW Celebration Station


====Bike to School====
====Bike to School====

Latest revision as of 22:22, 10 October 2019

HUB North Shore Committee holds regular meetings at 6:30pm - 8:30pm on the second Thursday of every month. Everybody is welcome. The meetings are at the North Vancouver City Library (14th/Lonsdale) in the Don Preston Boardroom (2nd floor).

  • Agenda additions
  • Introductions


Goals & Objectives

General

  • Draft Whitepaper on economic impacts of installing bike lanes.
    • Erika working on 1 page infographic slide
  • HUB State of Cycling project
    • Completion is delayed until December
  • Letters
    • Jill re: Jones overpass baffles (see CNV below)
    • Sacha re: secure weatherproof bike parking at schools

Events - Fred

  • Rivers Day - Sept 22
  • Fall Bike to Work Week - Oct 21-25 2019
    • Celebration station Oct 22 at NE and of 2nd narrows 4-6:30pm


City of North Vancouver - Erika/Heather

  • Walk CNV

City's walking plan WALK CNV was adopted at Council Sept 9. It is pedestrian focused but according to Tony: "Among many many goodies is a commitment to develop a strategy for MUPs to manage safety for pedestrians as volumes increase." We need to push for separated cycling facilities as MUPs largely inappropriate for commuting and focuses too much on cycling just for recreation. See next item for potential inroad.

  • Council's 2018-2022 strategic plan

Envisions providing active and sustainable and ways for people to move around as part of the broader "healthiest small city in the world" vision. https://www.cnv.org/your-government/mayor-and-council/council-strategic-plan

  • Esplanade Protected Bike Lanes.

A new protected bike lane will be ready shortly along the Prominade development. This design has room for sidewalk, trees, bike lane, trees then car lane. there will be a textured surface separating the sidewalk and bike lane (similar to Carrall St approaching Expo Blvd in Vancouver) with the street trees between the bike lane and the curb. It will set the precedent for any new lanes.

    • A design concept for Esplanade was presented to ITC Oct 2 - HUB has asked for a copy to review.
    • Final concept will be presented to council in October - Council will approve or not. If approved the concepts will go to public consultation.
  • New Mosquito Creek Bridge there will be wide sidewalks for peds and cyclists and a pathway underneath to connect to the trail, though with the off Marine bike route, the Marine Drive bike lanes are not likely to stay. ** Marine Dr Mosquito Creek Bridge
  • Mackay MUP Parking has been removed in some segments. A wide MUP has been constructed on top of the dyke being built for flood mitigation and there will also be bike lanes on both sides with parked car buffers in places. Should be done soon. No sign yet of bike lanes and the MUP itself had not yet been finished as of this past week. Road is in poor condition next to the unpaved part of the MUP. Connection to other side of Marine remains to be seen.
  • New building at 3rd and Chesterfield now has an asphalt off-street bike path next to it but as of last Saturday had an obstacle on the path still. North side in front of 7-11 remains a constant issue.
  • Bikes Mean Business and the Lower Lonsdale BIA Central Lonsdale

Engagement and infographic forthcoming.

  • Oct 7th - Delegation to Council.
  • ""Integrated Transportation Committee"" -
    • How do we get HUB representative on this committee - appointments start 1-Feb-2020 for 2 years
    • We need a representative to attend these monthly meetings
    • Brent Hillier is currently on it.

District of North Vancouver - Jay/Giacomo/Ryan

  • 29th Street protected bike lanes (Tempe Cres to Lynn Valley Rd)
    • work is underway.
    • send thank you to councillors and those who sent supporting emails
  • Feedback discussion from Council delegation - October 7, 2019
    • lots of great questions put forward on eBikes, bike lanes on arterials, next steps in bike network expansion, Motor Vehicle Act changes, secure storage options
  • Last meeting with Staff- October 8, 2019
    • discussion on potential "Low Level" and "Creek to Peak" route options
    • integration with MOTI work on Lower Lynn next phases
  • New protected bike lanes emerging along new Lynn Valley "Town Centre Connector" extension of 29th past Black Bear and into Safeway area
  • Ongoing correspondence with Steve Ono regarding delineators on Riverside Drive - these are generating close passes and driver aggression - request for signage / markings so it is clear bikes may take lane
  • 20 in 20 updates?

District of West Vancouver - Peter

  • Hugo Ray connector
  • HUB NS delegation presentation to the mayor and council

Communications & Outreach - Heather/Antje/James/Martyn

  • Channels
    • Yahoo Group -
    • Twitter - Antje sends out local news
    • FaceBook - James has offered to maintain a HUB NS account
    • HUB membership (NS)
  • Communications
    • Upcoming HUB Events & meetings
    • Current cycling news & NS Issues
    • Publicizing opportunities to provide input (Public meetings, online surveys, ...)
    • Request for support of improvements & projects
    • Annual committee update - Don
  • How to expand our reach & effectiveness
    • Other groups - Cycle clubs, NSMBA
    • Local media (NS News & Global Canadian)
    • Any other ideas
    • Presentations to Councils, business groups(BIA), schools? ...
  • Recruiting "interested but concerned" people
    • Membership coordinator?
    • adopt-a-gap
    • reach out to people who cc us on letters/emails to governments.
  • Create a library of good/bad infrastructure on the North Shore
    • Need a volunteer(s) and a list of locations.

BC Ferries - Peter S

  • Stakeholders meeting Oct 7th - Peter attended
  • Public Meeting Oct 7th
  • online public input form - Key points to raise:
    • Access to Ticket Booths from both Highway and Spirit Trail
    • Holding areas for Cyclists
    • protected Bikepath from terminal to Exit 0 (Spirit Trail) and also to Highway shoulder


ANYTHING NEW this month? Translink - Fred/Antje

  • e-Bikes on Buses - Update on HUB HQ discussions with TransLink
  • Bike parking at Exchanges:
    • letter to Translink re Lonsdale Quay -pinged Rex, still no response, how to escalate??
    • Also want space for future at Phibbs (and for bike share)


MOTI - Antje/Giacomo/Jay

  • Lions Gate Bridge and Causeway project this winter/spring to maintain reversible lane lights system
    • Antje met with MOTI staff
    • work will take place along the road and on the sidewalks where the electrical boxes are
    • constrcution management for cyclists will be the same as during the construction of the Causeway pathways
    • bridge work will be done only at night and cyclists will be detoured from sidewalk onto car lane closed to car traffic
  • Mountain Highway Interchange
    • top lift paving and pavement markings emerging - need to monitor intersection, particularly right-turn-on-red conflicts (HUB had requested a ban on these) as well as sufficient width for bike/trailer combos to navigate protected intersection channels
  • Ironworkers Memorial Bridge
    • No changes have been observed since summer correspondence from Operations Manager
    • Fencing holes still not fixed, no response yet to letter sent by HUB
  • Lower Lynn Interchanges next phases
    • Meeting with Jay Porter October 18 to provide design updates

Other

RCMP

  • doing a publicity campaign on Bike Theft & 529
  • will join our B2WW Celebration Station

Bike to School

  • Should we have a Liaison to other groups and/or the school district?
  • we have had 2 interested parties